Construction of a new dwelling house, garage, site entrance, waste water treatment system, percolation area and all associated site worksDecision record indexed
The construction of a two-storey dwelling house, garage, entrance, driveway, packaged wastewater treatment system with soil filter and all ancillary site worksDecision record indexed
1 - construction of a single storey extension to the rear of the existing dwelling 2 - the demolition and re-construction of the existing front porch 3 - elevational changes t o the existing house 4 - all ancillary wite worksDecision record indexed
The demolition of existing single storey rear extension, construct a new single storey extension to the rear of the existing dwelling house, elevational changes to existing dwelling house, construction of a new vehicular entrance, driveway, installation of wastewater treatment unit, polishing filter and all ancillary site worksDecision record indexed
An existing temporary dwelling (mobile home), and waste water treatment unit and planning permission for the renovation of the existing dwelling, the construction of a single-storey extension to the side, a two-storey extension to the rear, the erection of a new shed, and a tertiary module over a 45m2 disposal / infiltration area, together with all associated site works and ancillary servicesDecision record indexed
Demolition of single storey attached garage to side, single storey extension to rear, chimney stack and detached domestic shed, construction of part single storey, part storey and a half extension to side(south-west) and rear, alterations to window and door opes throughout and all ancillary site worksDecision record indexed
Change of use of existing farm building to tourist accommodation and construction of an extension to that building, new wastewater treatment system, percolation area and all associated site worksDecision record indexed
Partially constructed dwelling house permitted under planning reference number 05/3683 and planning permission to complete the said dwelling house, entrance, driveway, packaged wastewater treatment system with percolation area and all ancillary site worksDecision record indexed
The construction of a new garage, the decommissioning of the existing wastewater treatment system and the installation of a new packaged wastewater treatment system with percolation area and all ancillary site worksDecision record indexed
A ground floor extension consisting of a kitchen/dining, bathroom and a lobby together with an attic store, a ground floor extension consisting of a bedroom and ensuite together with an attic store, a ground floor extension consisting of a porch, the provision of 4 no. dormer windows to the rear of the dwelling, the provision of a storage shed and the modification of the existing vehicular entrance together with associated site worksDecision record indexed
A dwelling house, detached domestic garage, construct front boundary entrance walls, installation of mechanical aeration unit with polishing filter system along with all associated site worksDecision record indexed
(i) Demolish existing dwelling house & adjacent outhouses ruin (ii) Construct in its place a new slatted livestock house. Proposed livestock house to incorporate easy feed, crush & underground slatted slurry tank with external agitation points & ancillary concrete (iii) Construct a silage slab for round balesDecision record indexed
Erection of a domestic bungalow dwelling with attic conversion to North-East wing housing 1no. bedroom, bathroom and office, new entrance gates, domestic garage, Tricel P6 mechanical aeration unit and polishing filter and connections to all existing servicesDecision record indexed
Construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site worksDecision record indexed
The installation of a wastewater treatment unit & polishing filter and retention of the construction of a single storey dwelling house, out-buildings, entrance, driveway, and all ancillary site worksDecision record indexed
Construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site worksDecision record indexed
A dwelling house, waste water treatment system, percolation area, site entrance and all associated site works. Outline Planning Ref. No. 21/856Decision record indexed
The construction of a new dwelling house, detached domestic garage, install mechanical aeration unit and polishing filter system, construct front boundary entrance walls with all associated site worksDecision record indexed
The construction of a dwelling house, garage, new entrance, advanced treatment system and polishing filter and all associated site works. The height of the dwelling is 7.2 meters and the garage is 5.3 metersDecision record indexed
Construction of a replacement dwelling by converting and extending existing stone farm outbuildings, retain existing substandard derelict dwelling as a fuel store, onsite waste water treatment and disposal system and upgrade existing entrance and all associated worksDecision record indexed
Alterations to the existing dwelling, a new extension to the rear of the existing building and installation of a new waste water treatment system, percolation area and all associated site worksDecision record indexed
The demolition of an existing dwelling house and the construction of a replacement dwelling house which will consist of a part single storey and part 2 storey dwelling, garage, advanced treatment system and polishing filter and all associated site worksDecision record indexed
Construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site worksDecision record indexed
The (a) retention of existing 3 no. dormer windows which are constructed to the rear of existing single storey dwelling which is served by a proprietary wastewater treatment system and (b) retention of domestic shed as constructed and all necessary ancillary site works (all works previously granted under Planning Reg. 04186)Decision record indexed
A new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site worksDecision record indexed
Construction of a two-storey style dwelling, garage, entrance, driveway, packaged wastewater treatment system with soil filter and all ancillary site worksDecision record indexed
A) an agricultural shed comprising of cubicles with a slatted slurry storage tank, B) an underground soiled water storage tank, C) silage pits, D) a dungstead, E) an extension to existing milking parlour, F) an extension to existing poultry unit and all associated site worksDecision record indexed
Extension of Permission for Planning Ref. 14/967: the construction of a bungalow type dwelling house, garage, waste water treatment system & percolation area, entrance and all associated site worksDecision record indexed
A dwelling house, waste water treatment system, percolation area, site entrance and all associated site works. Planning Permission is also sought for a detached domestic garage. Ref. No. of Outline Permission 21/814Decision record indexed
Construction of an extension to the side of the dwelling house being constructed and the inclusion of 4 no. windows onto the front porch of the existing dwelling being constructed and all associated site worksDecision record indexed
Construction of a new dwelling house, detached garage, site entrance, waste water treatment system, percolation area and all associated site worksDecision record indexed
(A) Demolishing existing rear extension to existing dwelling house and decommission existing septic tank, (B) Renovate and construct an extension to the existing dwelling house, (C) Install new mechanical aeration unit and percolation system, (d) upgrade existing entrance, constructing new entrance wall and all associated site worksDecision record indexed
A new dwelling house, detached domestic garage, wastewater treatment system and polishing filter, bored well, vehicular entrance and all associated site worksGrounds not yet categorised
The construction of a new dwelling house, garage, entrance, driveway, packaged waste water treatment system with percolation area and all ancillary site worksDecision record indexed
Construction of a new dwelling house, detached domestic garage, wastewater treatment system and polishing filter, bored well, vehicular entrance and all associated site worksDecision record indexed
Demolition existing shed, entrance and concrete block and plaster boundary wall. Erect an extension to the existing dwelling and a new entrance and boundary wall to the west side of the site and all associated site worksDecision record indexed