to
to

Planning records

Showing 401-450 of 1,926 public records
Page 9 of 20
  1. © OpenStreetMap
    20/4485Granted

    No. 10 Eglantine Crescent Quartertown Lower Mallow, Co. Cork

    Permission for retention of attached domestic store to side of existing dwelling and detached garden shed to rear of existing dwelling.Decision record indexed
    Decision26 June 2020View record
  2. © OpenStreetMap
    24/4294Refused

    Bank Of Ireland, 150 Bank Place Main Street Mallow Co. Cork

    Permission to install a new external ATM with associated signage, and proposed new surround panel to the front elevation of the bank building with all associated site works (NIAH protected structure reference number 20815111)Grounds not yet categorised
    Decision17 April 2024View record
  3. © OpenStreetMap
    23/6340Granted

    No.7 Eglantine Drive Quartertown Lower Mallow Co.Cork

    Permission for retention of minor alterations to existing granny flat extension permitted under planning reference number 22/4364 consisting of the following alterations: 1) retention of the additional floor area provided to the rear single storey extension between the previously permitted living room and the existing rear sunroom, 2) retention of change of roof type to the rear single storey extension from a permitted pitched roof to a flat roof and all associated site worksDecision record indexed
    Decision25 January 2024View record
  4. © OpenStreetMap
    22/4364Granted

    No.7 Eglantine Drive Quartertown Lower Mallow Co.Cork

    Permission to construct a two storey extension to the side of existing dwelling for use as a granny flat and all associated site worksDecision record indexed
    Decision28 June 2022View record
  5. © OpenStreetMap
    23/4303Granted

    26 Eglantine Crescent Quartertown Mallow Co.Cork

    Permission for Retention of 2 No. Domestic 'Timber Garden Sheds', an 'Enclosed Domestic Storage Area', a 'Covered Garden Area', an 'Existing Dining Room Extension' an 'Attic Storage Area', modifications to roof design previously permitted under Planning Reference PD2493(formerly Mallow Town Council) and 1 No. additional rooflight on the eastern elevation of the existing roofDecision record indexed
    Decision19 May 2023View record
  6. © OpenStreetMap
    21/7511Granted

    Assolas Kanturk Co. Cork

    Permission for decommissioning of septic tank and percolation area to “Assolas House (Protected Structure)” RPS 00181 and detached single storey apartment and the installation of proprietary waste-water treatment plant and tertiary treatment system and associated works.Decision record indexed
    Decision06 July 2022View record
  7. © OpenStreetMap
    21/7041Granted

    Ballynamuck Churchtown Mallow Co. Cork

    To construct a dwelling house with domestic garage, entrance, wastewater treatment system with percolation area, with all associated site and ancillary works.Decision record indexed
    Decision21 March 2022View record
  8. © OpenStreetMap
    23/4586Granted

    Nos. 144A and 144B (McDonald's Restaurant) Bank Place Thomas Davis Street Mallow, Co. Cork

    Retention permission is sought for plant at roof level. Permission is sought for the provision of a screen for the plant with a maximum height of c.2.539 metres along the edge of the roof on the western elevation.Decision record indexed
    Decision17 April 2024View record
  9. © OpenStreetMap
    22/6166Granted

    142/143 Bank Place Thomas Davis Street and Hibernian Way Mallow, Co. Cork

    Development, reconstruction and refurbishment of existing 3 storey buildings at no’s 142 and 143 Bank Place, Thomas Davis Street & Hibernian Way, Mallow, Co.Cork. Refurbishment and reconstruction of vacant first and second floors of 142 and 143 Bank Place and existing extension to the rear of no. 142 Bank Place, to provide 4 no. housing units and salon consisting of the following works; The development of 4 no. apartments at first and second floor levels in vacant former residential upper floors of 142 and 143 Bank Place and a salon to the rear of 142 Bank Place at ground and first floor levels, accessed via Hibernian Way to include; (1) Permission for following: Replacement of rear of slate roof of 142 Bank Place, replacement of existing galvanized roof to the rear of first floor at 142 Bank Place, demolition and rebuilding of upper front and rear facades of 142 Bank Place, replace new windows to match existing at 143 Bank Place, openings in existing party wall between 142 and 143 Bank Place at first and second floor levels, change of use to residential of (14.5 sqm) section of rear ground floor at 142 to provide new stairway access to upper floors of both buildings. Change of use of salon (49 sqm), construction of extension of access lobby for proposed apartments at first and second floor levels (5.3 sqm) to the rear of no 143 Bank Place, construction of second floor extension (14.5 sqm) to the rear of no 142 Bank Place, for access to proposed apartments, Modifications to elevation at first and second floors to the front of no 142 Bank Place. (2) Retention of demolition of fire damaged elements and rebuilding works to damaged upper floor of 142 and 143 Bank Place to include; removal of existing first and second floors and associated elements, removal of external wall to rear of 143 at first and second floor levels. (3) Retention of constructed elements listed below: external wall/flat roof to rear of no 143 Bank Place as constructed, internal wall at ground floor at rear of no 142 Bank Place, construction of first and second floors as constructed, metal fabrication and other structural works as constructed, deemed necessary to support existing structure, Exposure of existing windows in Hibernian Way. The proposed development is within the Mallow town centre architectural conservation area.Decision record indexed
    Decision15 May 2023View record
  10. © OpenStreetMap
    23/4693Granted

    Lackaroe Buttevant Co. Cork

    Construct a dwelling, domestic garage and all associated site works and services.Decision record indexed
    Decision11 July 2023View record
  11. © OpenStreetMap
    24/4147Granted

    Bowling Green Mallow Co.Cork

    Permission for 1)subdivision of an existing building to form two separate units, 2) change of use of one unit from fitness centre to a retail/workshop for a picture framing business, 3) construction of a single storey extension to the side of the existing building to provide an entrance/reception area for customers to the picture framing business, 4) alterations to elevations to existing buildings, 5) Erection of associated signage on the buildingDecision record indexed
    Decision26 April 2024View record
  12. © OpenStreetMap
    24/5191Granted

    Quartertown Lower Quartertown Industrial Estate Mallow Co. Cork

    Permission for a mixed use light industrial/warehouse/commercial development comprising of 5 no. light industrial units with ancillary office space. The proposed development will also include associated site development works including but not limited to vehicular access, car parking spaces, footpaths, foul and storm drainage networks, water-mains, public lighting, landscaping and boundary treatment. A Natura Impact Statement will be submitted to the planning authority with the application.Decision record indexed
    Decision21 July 2025View record
  13. © OpenStreetMap
    21/5573Granted

    Mallow Business and Technology Park Quartertown Lower Mallow Co. Cork

    Install a rooftop photovoltaic solar panel array consisting of approximately 280 square meters of solar panels on the eastern roof slope and approximately 808 square meters of solar panels on the western roof slope of the existing building.Decision record indexed
    Decision16 July 2021View record
  14. © OpenStreetMap
    23/5952Granted

    Hazel Brooke Spaglen Mallow Co.Cork

    The construction of a strategic housing development comprising of 148 no. residential units, a creche, the provision of landscaping and amenity area to include 3 no. local play areas and 3 no. neighbourhood play areas and all associated ancillary development to include the provision of improved pedestrian facilities including the installation of dropped kerbs and tactile paving, new pedestrian crossings and the realignment and improvement of the spa road junction and footpaths to the west, lighting, drainage, boundary treatments and bicycle & carparking and bin storage. Extension of Duration to Permission granted under Planning Ref. No. ABP Ref 301429-18 (as amended by ABP 311986-21)Decision record indexed
    Decision17 January 2024View record
  15. © OpenStreetMap
    25/6545Refused

    34 Bank Place, Mallow, Co. Cork, P51 ED8W

    Change Of Use Of Existing Building From Retail To Residential / A Dwelling, Including Minor Modifications To The Elevations.Grounds not yet categorised
    Decision23 January 2026View record
  16. © OpenStreetMap
    20/5045Granted

    Nos. 144A (McDonald's Restaurant) and 144B (existing vacant retail unit) Bank Place, Thomas Davis Street Mallow, Co. Cork

    The development will consist of the change of use of No. 144B (77.5 sq m) from an existing retail unit to restaurant and the amalgamation of Nos. 144A and 144B to provide an enlarged McDonald’s restaurant (495.5 sq m), the 2 no. units were previously subdivided in the 1990’s and as such, the proposed development will restore the ground floor of the building to its original layout of 1 no. commercial unit. The proposed development also includes associated amendments to the facade of the proposed enlarged restaurant unit with associated signage and digital window poster; amendments to the existing drive thru arrangement principally comprising the replacement of the single drive thru lane with with a 2 no. lane drive thru arrangement with associated signage and menu boards; the relocation of the 4 no. existing accessible car parking spaces to facilitate to the new drive thru arrangement; and 1 no. new car parking space adjacent to the western boundary of the subject site.Decision record indexed
    Decision16 February 2021View record
  17. © OpenStreetMap
    25/4200Granted

    Hibernian Way Mallow Co.Cork

    Permission for the demolition of existing commercial units and 1 no. residential unit, part of a block wall and stone wall and the construction of 9 no. residential units in total consisting of 7 no. town houses, 2 no. apartments, hard landscaping, planters, communal storage area and associated site works. The proposed development is within the Mallow ACA.Decision record indexed
    Decision16 October 2025View record
  18. © OpenStreetMap
    25/5156Granted

    Lackaroe Liscarroll Mallow Co. Cork

    Permission to construct a new dwelling house, garage, entrance walls, wastewater treatment system with percolation area and associated site works.Decision record indexed
    Decision07 August 2025View record
  19. © OpenStreetMap
    21/6703Granted

    Tesco Park Road (N72) Mallow Co. Cork

    Permission and permission for retention for development at this c.0.011 ha site in the carpark of Tesco. The development will consist of/consists of: (i) retention permission for ‘’click and collect’’ signage in the existing Tesco car park; and (ii) permission for the construction of a sheltered canopy (c.50 sq.m) in the existing car park for the purpose of providing 2 no. dedicated ‘’click and collect’’ spaces for the existing Tesco store, a pedestrian crossing and all associated site development works.Decision record indexed
    Decision25 April 2022View record
  20. © OpenStreetMap
    24/5138Granted

    Dromaneen Td. Glantane Co. Cork

    Permission to construct a dwelling, domestic garage and all associated site works and services.Decision record indexed
    Decision18 November 2024View record
  21. © OpenStreetMap
    24/5064Granted

    Mohereen Lombardstown Mallow Co.Cork

    Permission to construct a new dwelling houseDecision record indexed
    Decision03 October 2024View record
  22. © OpenStreetMap
    20/6907Granted

    No. 144A (McDonald's Restaurant) Bank Place Thomas Davis Street and the Hibernian Way Car Park Hibernian Way Mallow, Co. Cork

    Retention permission for signage ancillary to the existing drive thru facility on a 0.0026 Ha (c.26 sq m) site. Retention permission for the existing overhead barrier (5.35m in height and 7.5m wide) located at the entrance to the carpark and drive thru facility accessed off Canon Field.Decision record indexed
    Decision19 February 2021View record
  23. © OpenStreetMap
    21/7468Granted

    Blackrock Ballydahin Mallow Co. Cork

    Demolition of existing vehicle servicing garage and office facilities and construction of new vehicle servicing garage, staff and office facilities and associated site works.Decision record indexed
    Decision14 July 2023View record
  24. © OpenStreetMap
    23/5197Granted

    "Clonmore" Ballyviniter Lower Mallow Co.Cork

    1) the construction of 108 no. dwelling houses, consisting of 3 no. 4 bed detached, 2 no. 3 bed detached, 68 no. 4 bed semi-detached, 32 no. 3 bed semi-detached and 3no. 3 bed terraced houses. These houses area to be assessed through the existing completed part of the housing development; 2) A crèche of 380 sqm of single/two storey construction, also accessed from the existing completed part of the housing development, including 11 carparking spaces and associated works; 3) the provision of a 1.2m diameter culvert within this development. This leads to an open water course which is to be provided in lieu of the existing pipeworks along the western boundary of the site; 4) all associated site development works. Extension of Duration to Permission granted under Planning Ref. No. 16/6949, ABP-301221-18Decision record indexed
    Decision08 August 2023View record
  25. © OpenStreetMap
    21/4908Granted

    Kilvealaton West Mallow Co. Cork

    To construct a dwellinghouse.Decision record indexed
    Decision07 September 2021View record
  26. © OpenStreetMap
    21/4127Granted

    26a Hazelbrooke Spa Glen Mallow Co. Cork

    To construct a two-storey house and all associated site works.Decision record indexed
    Decision08 June 2021View record
  27. © OpenStreetMap
    25/4291Granted

    "Former Homa Pumps Building", Quartertown Industrial Estate, Quartertown Lower, Mallow, Co. Cork. P51 XC7K

    Permission for the internal change of use of part of existing warehouse (242 sq.m) to offices to be used ancillary to the existing office warehouse use in the building, alterations to elevations consisting of installation of external insulation to external walls of offices on the north, south & west elevations, installation of additional glazing together with alterations to external windows & doors to the offices on the north, south and west elevations, together with all associated site works.Decision record indexed
    Decision11 July 2025View record
  28. © OpenStreetMap
    25/6210Granted

    'Former Homa Pumps building' Quartertown Industrial Estate, Quartertown Industrial Estate, Mallow, Cork, P51XC7K

    Permission for the internal change of use of part of ground floor of existing warehouse to offices (325 square metres), construction of additional ancillary offices & showroom at first floor level (253 square metres), all to be used ancillary to the existing office warehouse use in the building, installation of additional glazing together with alterations to external windows & doors to the offices on the north, south and west elevations, together with all associated site worksDecision record indexed
    Decision11 December 2025View record
  29. © OpenStreetMap
    21/6750Granted

    Ballyviniter Lower Mallow Co. Cork

    The construction of a proposed single storey extension to the rear of the existing dwelling, material alterations to the existing side elevation, new rooflights on the existing rear roof and all associated site works.Decision record indexed
    Decision01 December 2021View record
  30. © OpenStreetMap
    24/4551Granted

    11 Fair Street East Mallow Co.Cork

    Permission for retention of a two storey rear extensionDecision record indexed
    Decision27 May 2024View record
  31. © OpenStreetMap
    25/5293Granted

    No.8 Fair Street Mallow Co.Cork

    Permission for retention of change of use of apartment to retail storage area, associated with the Nagle Fireplaces retail unit, which is located directly underneath.Decision record indexed
    Decision25 August 2025View record
  32. © OpenStreetMap
    24/4126Granted

    Lisduggan South Castlemagner Co Cork

    Permission to: (1) Renovate existing dwelling (2) Construct a single storey extension to the front (south) and porch to side (east) of the existing dwelling (3) Allow for elevational changes (4) Close up existing entrance and allow for new vehicular entrance (5) Allow for all ancillary site works.Decision record indexed
    Decision02 October 2024View record
  33. © OpenStreetMap
    22/6867Granted

    Ballyviniter Lower Mallow Co. Cork

    Permission for retention for conservatory to side of existing dwelling as constructed on site. Permission is also sought for a new extension to side of the existing dwelling and extension and alterations to existing detached domestic garage on site and all associated site works.Decision record indexed
    Decision17 April 2023View record
  34. © OpenStreetMap
    21/6317Granted

    No. 13 Shoulders Lane Mallow Co. Cork

    The construction of a single-storey extension onto rear of dwelling house and the alteration of elevations to rear and south side of dwelling house.Decision record indexed
    Decision14 October 2021View record
  35. © OpenStreetMap
    24/6514Granted

    Quartertown Industrial Estate Quartertown Lower Mallow Co. Cork

    Permission for the construction of 1 No. new light engineering high bay manufacturing & assembly workshop and 1 No. light engineering storage building adjacent to existing light engineering manufacturing buildings and all associated works.Decision record indexed
    Decision30 April 2025View record
  36. © OpenStreetMap
    20/5380Granted

    Fairgreen New Road Mallow Co. Cork

    Change of use from Bistro (Vacant Unit) and Retail (Vacant Unit), as previously approved under planning reference 55046/04 & 55020/09, to 1no. unit to be used as offices, where services will be provided to visiting members of the general public, being the ground floor of an existing 3-storey over basement mixed use building.Decision record indexed
    Decision25 November 2020View record
  37. © OpenStreetMap
    23/5359Granted

    Fair Street and 49 Bank Place Mallow Co.Cork

    Permission to install a new pedestrian access entrance door to the east elevation of the existing building with all associated site and ancillary worksDecision record indexed
    Decision21 August 2023View record
  38. © OpenStreetMap
    20/5697Granted

    No. 2 Blackrock Park Ballydahin TD Mallow Co. Cork

    Permission for retention of detached domestic shed as constructed for use as domestic store and utility room and retention of shed as constructed for use as garden utensil store.Decision record indexed
    Decision05 October 2020View record
  39. © OpenStreetMap
    23/4495Granted

    Shoulders Lane (to the rear of No. 6 Fair Street East) Mallow Co.Cork

    Permission for the construction of a 2-storey 2-bed town house with 3 no. roof lights to rear, and all associated site worksDecision record indexed
    Decision10 May 2023View record
  40. © OpenStreetMap
    22/4782Granted

    Shoulders Lane (to rear of no 6 Fair Street East) Mallow Co.Cork

    Retention permission for the partial demolition of existing derelict shed and Permission for the following: A) demolition of the remains of the existing derelict shed, and all associated site worksDecision record indexed
    Decision02 December 2022View record
  41. © OpenStreetMap
    20/5994Refused

    Shoulders Lane (to rear of No.6 Fair Street East) Mallow Co. Cork

    Retention permission for the partial demolition of existing derelict shed and permission for the following: a) demolition of the remains of an existing derelict shed, b) construction of a 2 storey building comprising of 1no. 1 bed apartment at ground floor and 1no. 1 bed apartment at first floor level, each with own private open area terrace/balcony and associated screening, 2 no. roof lights to rear, rear boundary wall and all associated site works.Grounds not yet categorised
    Decision06 November 2020View record
  42. © OpenStreetMap
    21/4524Granted

    Unit 21, Market Square New Road Mallow Co. Cork

    The change of use of a former bank into a medical centre.Decision record indexed
    Decision26 April 2021View record
  43. © OpenStreetMap
    23/5805Granted

    Ballyvinter Lower Mallow Co. Cork

    Permission for 1- Construction of a new single storey extension to the side (South Facing) elevation of the existing dwelling. 2- Construction of a new single storey extension to the rear (West Facing) elevation of the existing dwelling. 3- The relocation of the existing garden storage shed to facilitate the proposed side extension. 4- All ancillary site works.Decision record indexed
    Decision01 November 2023View record
  44. © OpenStreetMap
    24/5694Granted

    Numbers 1 & 2 Landscape Terrace Mallow Co. Cork

    Permission for change of use from office space to residential use, to include a total of three apartments, consisting of one 3 bedroom apartment on the ground floor of number 1 Landscape Terrace, one 2 bedroom apartment on the first floor, which spans across numbers 1 & 2 Landscape Terrace and one 2 bedroom apartment on the second floor, which spans across Numbers 1 & 2 Landscape Terrace and to carry out associated alterations to elevations of both buildings, as well as alterations to a section of the ground floor of number 2 Landscape Terrace to allow for revised stairs design.Decision record indexed
    Decision22 May 2025View record
  45. © OpenStreetMap
    25/5535Granted

    Brookville Ballyviniter Lower Mallow Co Cork

    1) Construction of a new single storey side extension. 2) Demolition of the existing garage to accommodate the new side extension. 3) Demolition and re-construction of the existing rear conservatory. 4) Elevational changes to the existing house. 5) Internal alterations to the existing layout. 6) All associated site works.Decision record indexed
    Decision19 September 2025View record
  46. © OpenStreetMap
    20/6379Granted

    Quartertown Industrial Estate Quatertown Lower Mallow Co. Cork

    The development will consist of a warehouse extension to the eastern side of the existing warehouse/production building, utilities area including tank farm and utilities equipment, additional parking and all associated site works. The application relates to a development which comprises an activity requiring an integrated pollution prevention and control licence.Decision record indexed
    Decision20 April 2021View record
  47. © OpenStreetMap
    20/4883Granted

    Unit No. 13 Market Square New Road Mallow, Co. Cork

    Change of use of the ground floor unit from the existing commercial/ retail use to office use. The proposed development consists of internal modifications to the ground floor unit and its incorporation into the existing principal office use of the building, signage and all ancillary site development works.Decision record indexed
    Decision15 July 2020View record
  48. © OpenStreetMap
    22/4900Granted

    Ballyviniter Lower Mallow Co. Cork

    Permission to retain garage attached to dwelling, alterations to dwelling, and all associated site works.Decision record indexed
    Decision29 July 2022View record
  49. © OpenStreetMap
    20/5439Refused

    Ballygrace Churchtown Mallow Co. Cork

    To construct a new dwelling house.Grounds not yet categorised
    Decision02 September 2020View record
  50. © OpenStreetMap
    24/4848Granted

    Mahanagh Liscarroll Mallow Co.Cork

    Permission to construct a new dwelling houseDecision record indexed
    Decision16 September 2024View record
Showing 401-450 of 1,926
Page 9 of 20