To RETAIN minor alterations to the existing dwelling house and planning PERMISSION to install a new wastewater treatment unit & percolation area, and revised site boundaries along with all associated works
To extend existing private garage and convert it into a granny flat along with all associated site works
To RETAIN the construction of an existing private garage and planning PERMISSION to extend existing private garage and convert it into a proposed granny flat along with all associated works
Is sought for the continued operation of the existing Booltiagh Wind Farm as permitted by An Bord Pleanala Ref: 03.120616 (Clare County Council Pl. Ref: 00/567) for a further period of 10 years from the date of the expiry of the current planning permission (30th September 2025) per Condition no. 2 of the consent issued and for the decommissioning of the wind farm at the end of that further period. The proposed development development does not comprise any modifications to the existing operational wind farm. The proposed development comprises: a) 12 no. existing GE Energy 1.5 Megawatt (MW) wind turbines with a maximum overall blade tip height of 90 metres (m) including hardstands; b) Existing site access tracks and car parking spaces; c) all existing associated underground electrical and communications cabling connecting the turbines to onsite substation (onsite substation consented under ABP 03.120616, amended and made permanent under Pl. Ref: 11/34, and amended under ABP 03.245273; d) Existing gated site entrance from Creegh - Kilmaley local road; e) Existing site drainage; f) All existing ancillary infrastructure, associated site fencing and signage; and g) Implementation of a decommissioning plan. All elements of the wind farm are pre-existing and it is not proposed to make any alterations to the current site layout, wind turbines or associated infrastructure as part of this application. an Environmental Impact Assessment Report (EIAR) accompanies the planning application
To RETAIN the construction of extensions to existing agricultural buildings, PLANNING PERMISSION to demolish existing sheds and construct a new agricultural building incorporating calving pens and calf rearing facilities and to construct an extension to existing dairy along with all associated and ancillary works
To 1. Construct a cubicle house for cows with ancillary scrapers. 2. Extend existing shed by one bay. 3. Construct 2 underground slurry tanks. 4. Construct a new milking complex with adjoining drafting system and calf facility. 5. Demolish old store and section of existing parlour to facilitate construction of new milking complex
To Extend the Appropriate Period of Planning P20/120 to 1. Construct a cubicle house for cows with ancillary scrapers. 2. Extend existing shed by one bay. 3. Construct 2 underground slurry tanks. 4. Construct a new milking complex with adjoining drafting system and calf facility. 5. Demolish old store and section of existing parlour to facilitate construction of new milking complex
To construct a new dwelling house and private garage with connection to main sewer and water services with all necessary ancillary works
For the development at this site in the townlands of Slievenalicka, Illaunbaun, Drumbaun and Lackamore (although no infrastructure will be sited within Lackamore townland), Co. Clare. The development will consist of: • Construction of 1 wind turbine with a maximum overall blade tip height of 150m. • Construction of associated turbine foundation, crane pad hardstand and assembly area. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbine to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction and operation of the turbine. • Two borrow pits. • One peat repository area for peat and spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent and Temporary tree felling to accommodate the construction and operation of the turbine. • Signages. • All associated site development works. This application is seeking a 10-year planning permission, together with a 35-year operational life for the wind turbine from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes. The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) and Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the Planning Authority with the application
To RETAIN existing ground floor structures Ref P04/869, and to complete dwelling, garage, septic tank, foul sewerage treatment system & percolation area
To demolish the existing disused chalet / agricultural building and construct a new dwelling house, site entrance, private garage, on-site wastewater treatment system and all associated site works
Of (a) extension to existing dwelling house (b) private garage / store (c) new entrance to existing dwelling house
For the development of Illaunbaun Wind Farm in the townlands of Tooreen, Slievenalicka, Illaunbaun, Drumbaun & Lackamore (although no infrastructure will be sited within Lackamore townland), County Clare. The development will consist of: • Construction of 5 wind turbines with a maximum overall blade tip height of 150 m. • Construction of associated turbine foundations, crane pad hardstand and assembly areas. • Construction of one permanent 38 kV electrical on-site substation with one control building with welfare facilities, all associated electrical switchgear, security fencing, underground cabling, drainage infrastructure, and all ancillary works. • All associated internal underground electrical and communications cabling connecting the wind turbines to the on-site Substation. • Upgrade of existing tracks, roads and provision of new site access roads to facilitate construction & operation of the wind farm. • Two borrow pits. • Three peat repository areas for peat & spoil management. • Construction of one temporary construction compound. • Development of internal site drainage. • Permanent & Temporary tree felling to accommodate the construction & operation. • Signages and • All associated site development works. This application is seeking 10-year planning permission, along with a 35-year operational life for the wind farm from the date of its commissioning. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413) Yes x No The planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice is issued in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) & Screening for Appropriate Assessment have been prepared in respect of the planning application and will be submitted to the planning authority with the application.
To demolish section of existing farmhouse (39.5m2) and construct new extension to side of same and to decommission existing septic tank and upgrade to proprietary wastewater treatment plant with percolation area and associated site works
To construct a new dwelling house, access road, entrance, private garage, connection to existing public sewerage & water services along with all associated works
To construct a new dwelling house, new entrance, access road, private garage and install a new wastewater treatment system along with all associated works
To construct a two storey extension to include a re-located bedroom to facilitate a home office, a utility room and a plant room
To build an extension to the building, repurpose it as a residence, upgrade the waste water treatment system & all other associated site and ancillary works
For the demolition of a porch to the rear of the dwelling house, carry out elevational changes and internal alterations to existing dwelling house along with all associated works
Of a reconstructed structure on the footprint of a longstanding stone cabin with connection to existing on-site facilities and for a change of use from agricultural use to a pre school facility
Of existing private storage shed
To build an extension onto the existing dwelling, upgrade and relocate the existing sewerage system & all other associated site and ancillary works
For development of a livestock slatted unit and manure pit with associated ancillary siteworks
Of development which consists of retaining extensions and all ancillary site works
Of the rear extension to the rear of the existing dwelling house, along with all associated site works
To construct a private storage shed along with ancillary site works
Of the new entrance onto the public road, the creation of a hardcore area inside the entrance and all associated and ancillary site works
To build a new dwelling house, install a wastewater treatment system & all other associated site and ancillary works
To construct extension to gable / rear of existing dwelling house, plus all ancillary site works
To construct a granny flat to the side of an existing dwelling house along with all associated works
For development which will consist of a 10 year planning permission for the construction and operation of battery arrays (240 number units, each 1.87m2 by c. 2.32m tall), a control building with gross floor area 140m2 by 6.40m tall, 3 number 12MVA transformers (c. 3.5m tall), 1 number 2.5MVA transformer (c. 2.5m tall) and inverters (24 number units, each 1.85m2 by c. 2.22m tall. The development will include for ancillary infrastructure including security fencing, lighting, CCTV, internal access roads and drainage. The development will have a 35 year operational lifetime. The overall development site is ca. 1.42 hectares (ha)
Of the domestic garage together with all associated site development works, boundaries and services
To construct a dwelling house with attached car port and garage, proprietary treatment system and associated site works, including new road entrance
Of attic conversion and minor elevational changes to the dwelling house and detached private shed; and planning PERMISSION to install a gable window to the first floor and 3 no roof lights along with all associated site works
To alter and extend existing dwelling house along with ancillary site works
To alter and extend existing dwelling house along with ancillary site works
Of existing extension and alterations to the existing retail premises
To RETAIN the existing house substructure as granted under P06/2930. For PERMISSION to complete the dwelling house as granted under P06/2930 and to install a proprietary wastewater treatment system along with ancillary site works
Of a) the site entrance as constructed b) the increase in the roof height of the dwelling house c) the sunroom as constructed d) the first floor area and additional rooflights along with associated site works
For demolition of outbuilding and existing extension, refurbishment and alterations of existing dwelling house and construction of a new extension, car port and outbuildings along with all associated works
To construct a dwelling house and proprietary waste water treatment system along with ancillary site works
For change of use of existing ground floor storage area to office space with all necessary ancillary works at their headquarters
For development which will consist of (a) Before school breakfast club 8 -9 am (b) Playschool 9-12 noon (c) Preschool after care 12-1 pm (d) After school care 1-5.30pm
The development consist of 1) Retaining Playschool in meeting room number two; 2) Changing meeting room number one into a playschool c/w ancillary site works
To construct a new dwelling house, new entrance, garage, connection to public sewerage and water services and all associated works
The development will consist of a general purpose room plus ancillary site works
To construct an additional 280m uncovered running track on to the existing 120m covered running track and to develop a grass training pitch to include flood lights and all associated site works and services
To extend existing dwelling house and to install foul sewer system & percolation area
Of the following a) the front porch and rear extension along with additional window/rooflight and changes to windows of the dwelling house. b) first floor storage area and additional windows/door/rooflights of the garage along with associated site works
For construction of a one-storey addition to the front-west of the existing dwelling house with proposed skylight, proposed new shed dormer window in existing attic to the front-west of the dwelling house, demolition of the existing sun room and porch to the front-west of the dwelling, proposed new internal alterations to exiting dwelling house including new windows and doors to existing elevations of the dwelling house and all associated works