to
to

Planning records

Showing 401-450 of 2,003 public records
Page 9 of 20
  1. © OpenStreetMap
    25/6983Granted

    Lodge, Kilknockin, Mallow, Co. Cork, P51V61W

    Permission to widen existing vehicular access, construct a domestic garage in the rear garden of existing dwelling and all associated site works.Decision record indexed
    Decision24 February 2026View record
  2. © OpenStreetMap
    23/6201Granted

    Ballymaquirk Kanturk Co Cork

    Construction of a proposed single storey extension to the side, extension to the front, conversion of garage to living space, new rooflights to front and rear roofs, material alterations to all elevations of existing dwelling and all associated site works.Decision record indexed
    Decision21 December 2023View record
  3. © OpenStreetMap
    26/0299Granted

    West End And Park Road, Annabella, Mallow, Co.Cork

    Permission for Development on a site which will consist of the demolition of part of the existing Co-Op store, and associated garden centre, agri store, and delivery yard, and the provision of an expanded Co-Op store, and associated part-covered garden centre, agri store and delivery yard; the refurbishment of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) to provide a restaurant use at lower ground floor and ground floor, to include the sale of hot food for consumption off the premises, and offices on the first floor and second floor; repair works to the Coach Houses (Protected structure Reg No. 72); 7no. new units (Units 2-8) suitable for convenience retail/comparison retail/retail warehousing/restaurant/café use, with retail use to include the sale of alcohol for consumption off the premises, and restaurant/café use to include the sale of hot food for consumption off the premises. A glazed connection, for restaurant use, is proposed between the lower ground floor of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) and Unit 2. The proposed development also provides for the demolition of part of the boundary wall fronting West End; public realm works on West End; car parking; cycle parking; signage; waste management areas; ESB substation; rooftop plant, including solar panels; and all site development, infrastructural and landscaping works, including modifications to the existing access off Park Road, and improved/new pedestrian connections on West End and Park Road. The northern part of the site is located within an Architectural Conservation Area (ACA-1). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. Extension of Duration to Permission granted under Planning Ref. No. 20/4925Decision record indexed
    Decision07 April 2026View record
  4. © OpenStreetMap
    20/4925Granted

    West End and Park Road Annabella Mallow Co. Cork

    Development on a site which will consist of the demolition of part of the existing Co-Op store, and associated garden centre, agri store, and delivery yard, and the provision of an expanded Co-Op store, and associated part-covered garden centre, agri store and delivery yard; the refurbishment of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) to provide a restaurant use at lower ground floor and ground floor, to include the sale of hot food for consumption off the premises, and offices on the first floor and second floor; repair works to the Coach Houses (Protected structure Reg No. 72); 7no. new units (Units 2-8) suitable for convenience retail/comparison retail/retail warehousing/restaurant/café use, with retail use to include the sale of alcohol for consumption off the premises, and restaurant/café use to include the sale of hot food for consumption off the premises. A glazed connection, for restaurant use, is proposed between the lower ground floor of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) and Unit 2. The proposed development also provides for the demolition of part of the boundary wall fronting West End; public realm works on West End; car parking; cycle parking; signage; waste management areas; ESB substation; rooftop plant, including solar panels; and all site development, infrastructural and landscaping works, including modifications to the existing access off Park Road, and improved/new pedestrian connections on West End and Park Road. The northern part of the site is located within an Architectural Conservation Area (ACA-1). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.Decision record indexed
    Decision26 July 2021View record
  5. © OpenStreetMap
    24/5483Granted

    The Mallow South Town Centre Development, (under construction), bounded by West End & Park Road, Annabella, Mallow, Co. Cork.

    Permission for the construction of a single storey retail warehouse (unit 3) to the immediate east of retail unit 2 permitted under application reference 20/4925; roller shutter door to the rear elevation; signage; rooftop plant; extension to the delivery yard area permitted under application register reference 20/4925; and all associated site development and drainage works on a site that forms part of the Mallow South Town Centre Development (under construction). The proposed development will modify condition no. 2, which omitted the proposed retail units 3 and 4, attached to application reference 20/4925. The proposed modified condition no. 2, will exclude the omission of retail unit no. 3. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.Decision record indexed
    Decision04 July 2025View record
  6. © OpenStreetMap
    21/6442Granted

    St Gobnait's Park Ballydahin Mallow Co. Cork

    Permission for retention of foundations as constructed and permission for the erection of a single storey toilet block and storage building and associated site works.Decision record indexed
    Decision26 October 2021View record
  7. © OpenStreetMap
    19/7102Granted

    ISPCA Equine Rescue Centre Dromsligo Mallow, Co. Cork

    A 30.1m multi-user free standing lattice structure carrying telecommunications equipment including antennas, RRUs and dishes, together with associated exchange cabinets fencing and all associated site development works. The development will provide for wireless data and broadband services.Decision record indexed
    Decision21 February 2020View record
  8. © OpenStreetMap
    22/4817Granted

    Dromore South Dromahane Mallow Co Cork

    Construct a dwelling house.Decision record indexed
    Decision03 June 2022View record
  9. © OpenStreetMap
    20/6790Granted

    Sean Moylan Park Ballydahin Mallow Co. Cork

    Construction of an extension to an existing roof plant enclosure of an industrial building. The height will increase by three metre. No additional floor area is proposed. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence (P0247-02) issued by the Environmental Protection Agency.Decision record indexed
    Decision09 February 2021View record
  10. © OpenStreetMap
    21/5363Refused

    N20 Road Kilknockan and Lackanalooha (Townlands) Mallow Co. Cork

    The construction of a modern service station comprising a one storey forecourt building, a forecourt with canopy, 6 pump islands, 3 underground fuel tanks; electric vehicle charging stations; parking for vehicles, coaches and HGV’s; and signage. A new access road is proposed onto the L-92004-0 road and improvement works are proposed to the existing entrance onto the N20 Road, including provision of a right-hand turning lane on the N20 Road. The forecourt building includes: (1) retail shop; (2) delicatessen; (3) restaurant with drive through facilities and drive through lane; (4) internal seating and dining area; (5) sale of hot and cold food for consumption both on and off the premises from the delicatessen; (6) ancillary space for staff, office and storage; (7) toilet facilities; (8) service yard with bin storage; and (9) external seating area. The proposal will also comprise of all associated ancillary site development works including pedestrian access, internal roads and round-about, parking, footpaths, crossings, landscaping and boundary treatments, and drainage. A Natura Impact Statement will be submitted to the Planning Authority with the application.Grounds not yet categorised
    Decision12 July 2021View record
  11. © OpenStreetMap
    20/5063Granted

    West End Road and Park Road (N72) Annabella Mallow Co. Cork

    Development comprising the construction of a new Licenced Discount Foodstore with ancillary infrastructure and associated site development works (all totalling 2,254.4 sq m Gross Floor Area and ranging in height equivalent from 1 to 2 storeys), at a site of approximately 1.476 hectares. The construction of the proposed Licenced Discount Foodstore (2,215 sq m gross floor area) comprises of: A retail sales area with ancillary off-licence use and bakery (total Net Retail Sales Area of 1,420 sq m), entrance pod, public facilities (incl. lobby and toilets), staff facilities (incl. lobbies, operations office, meeting room, canteen, locker room, showers and toilets), storage (incl. cold storage), IT room, plant room, and delivery area; Rooftop photovoltaic solar panel array extending to a maximum of 907.5 sqm; Corporate signage consisting of 4 no. building mounted corporate internally illuminated signs, 1 no. free standing internally illuminated flagpole sign at the site entrance from Park Road, and 1 no. free standing externally illuminated poster display boards; 1 no. covered trolley bay structure (39.4 sq m Gross Floor Area); Surface car park providing a total of 127 no. car parking spaces (4 no. disabled, 12 no. parent and child, 12 no. EV charging spaces and 101 no. regular) and 14 no. motorcycle parking spaces and 16 no. bicycle parking spaces; Primary vehicular and pedestrian access to the proposed Licenced Discount Foodstore will be provided via an existing site entrance (serving the Dairygold Co-Op Superstore) onto Park Road (N72), which is to be enhanced as part of the proposed development; Pedestrian access will be provided via a new plaza area along the northern boundary of the site with West End Road; and Boundary treatments, hard and soft landscaping, services (including 2 no. below ground attenuation tank) and all other ancillary and associated site development works above and below ground level. This Planning Application will be accompanied by a Natura Impact Statement.Decision record indexed
    Decision03 August 2021View record
  12. © OpenStreetMap
    20/6152Granted

    Ballyclough AGI (Above Ground Installation) West End Annabella Mallow, Co. Cork

    The development will consist of replacing approximately 155m of existing 2.4m high chainlink fence and associated access/emergency gates with 155m of new 2.4m high green palisade security fencing/gates and all associated site work at an existing above ground natural gas installation.Decision record indexed
    Decision19 November 2020View record
  13. © OpenStreetMap
    22/5322Granted

    Old Cork Road Gooldshill Mallow Co Cork

    Permission for an 18m monopole structure with headframe carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets and associated site worksDecision record indexed
    Decision02 August 2022View record
  14. © OpenStreetMap
    19/5999Granted

    Ballyboght Td. Bweeng Mallow Co. Cork

    Retention of dwelling as constructed and all associated site worksDecision record indexed
    Decision16 January 2020View record
  15. © OpenStreetMap
    20/6484Granted

    Ballintober Kanturk Co. Cork

    The importation of soil & stone for the raising of an agricultural field in order to improve the agricultural output of the field. A Natura Impact Statement (NIS) has been prepared and will be submitted to the authority with this application.Decision record indexed
    Decision01 December 2021View record
  16. © OpenStreetMap
    24/5478Granted

    Annabella, West End & Park Road (N72), Mallow, Co. Cork.

    Permission for development at this site of approximately 0.0352 hectares located at the permitted pharmacy and office units (totalling 317.3 sq.m gross floor space) of the newly constructed Lidl licensed discount foodstore (granted permission under Cork County Council Planning Reg. Ref. No.: 20/05063). The proposed development consists of the change of use of the constructed pharmacy unit (173.8 sq.m) to shop as defined by Article 5(1) of the Planning and Development Regulations 2001(as amended); the change of use of the constructed office unit (139.7 sq.m) to shop as defined by Article 5(1) of the Planning and Development Regulations 2001 (as amended); and associated signage (totalling 6.12 sq.m).Decision record indexed
    Decision26 September 2024View record
  17. © OpenStreetMap
    21/6765Granted

    Ballymaquirk Kanturk Co. Cork

    Permission for the retention of (a) the demolition of factory building (factory 1), (b) retention of the construction of factory building (factory 1) and (c) retention of the construction of a loading mechanism (gantry crane) all within an overall site of 32.80 acres.Decision record indexed
    Decision11 October 2022View record
  18. © OpenStreetMap
    24/6099Granted

    No.3 Woodland View Mallow Co. Cork P51PW2C

    Permission to convert existing attic of dwelling house to habitable accommodation, 2 no. dormer windows to front elevation, 3 no. rooflights to rear elevation and all associated site works.Decision record indexed
    Decision07 January 2025View record
  19. © OpenStreetMap
    24/4795Granted

    25 Dromore Drive Ballydahin Mallow Co.Cork

    Permission for alterations to front and side of existing dwelling and for the construction of a single storey extension to the rear of same dwelling and all associated site worksDecision record indexed
    Decision17 January 2025View record
  20. © OpenStreetMap
    20/6845Granted

    Ballydahin Td. Cork Road Mallow Co. Cork

    (1) The demolition of existing disused shed (2) the construction of a new two storey dwelling, domestic garage and all associated site works and services.Decision record indexed
    Decision08 June 2021View record
  21. © OpenStreetMap
    21/6888Granted

    Gortnagraiga Td. Mallow Co. Cork

    (1) Retention of 2 no. car ports incorporating domestic storage areas (2) Retention of existing domestic storage shed (3) Retention of single storey side extension to existing dwelling linking to existing garage/storage area, and canopied sit out area and boiler house to the rear of same dwelling (4) Retention of various alterations made to the elevations of existing dwelling and garage from that permitted under Planning Reference Number 02/4097 consisting of changes made to window and door opes, roof over rear conservatory, chimney and omission of dormer windows to the rear as identified on submitted drawings (5) Retention of first floor attic conversion over existing domestic garage/store (6) To construct a new domestic garage/storage area ancillary to existing dwelling for the housing of 2 no. boats for private use and all associated site works.Decision record indexed
    Decision27 April 2022View record
  22. © OpenStreetMap
    20/4683Granted

    Ballintober Kanturk Co. Cork

    The construction of a new agricultural entrance.Decision record indexed
    Decision08 September 2020View record
  23. © OpenStreetMap
    25/4688Granted

    No.5 Dromore Drive Ballydahin Mallow Co. Cork

    Permission for alterations to the external elevations of existing dwelling, to block up existing site entrance serving same dwelling, and to construct a new site entrance to serve same dwelling and all associated site works and servicesDecision record indexed
    Decision06 June 2025View record
  24. © OpenStreetMap
    19/6319Granted

    Shronebeha Banteer Co. Cork

    To construct a dwellinghouse and all associated site development works including the installation of a septic tank and percolation area, landscaping and the provision of a new site entrance and all associated site worksDecision record indexed
    Decision13 January 2020View record
  25. © OpenStreetMap
    21/4678Granted

    Barrinclay Mourneabbey Co. Cork

    Construction of a livestock underpass, effluent holding tank and all associated siteworks.Decision record indexed
    Decision29 November 2021View record
  26. © OpenStreetMap
    25/4087Granted

    No.31 Beecher Street Kilknockan Mallow Co.Cork

    Permission for the subdivision of existing dwelling into 2 no. dwellings consisting of internal and external modifications to existing dwelling and a single storey extension to the rear of same dwelling and all associated site works and servicesDecision record indexed
    Decision09 July 2025View record
  27. © OpenStreetMap
    25/4841Granted

    10 Lower Beecher Street Kilknockan Mallow Co.Cork

    Permission for alterations and extension to existing dwelling, including elevational changes, a new single storey side extension and demolition of an outbuildingDecision record indexed
    Decision05 August 2025View record
  28. © OpenStreetMap
    20/4214Granted

    Carhookeal Mallow Co. Cork

    To construct a new dwelling house.Decision record indexed
    Decision30 March 2020View record
  29. © OpenStreetMap
    20/5098Granted

    51 Canon Sheehan Place Gooldshill Mallow Co. Cork

    To demolish the existing domestic store building and to construct an extension to the rear of the existing dwelling, a new separate dwelling house unit to the side of the existing dwelling house and a new vehicular entrance with alterations to the front, side and rear elevation of the existing dwelling house, with all associated site and ancillary works.Decision record indexed
    Decision12 January 2021View record
  30. © OpenStreetMap
    23/5250Granted

    Gortnagraiga TD Mallow Co. Cork

    Permission for the following: (1) Retention and completion of existing dwelling previously permitted under planning reference 07/11345 and all associated site works. (2) Retention of existing 2 storey domestic garage containing a domestic store (for the purpose of storing own vintage and classic cars for personal use) and a car port on the ground floor and a granny flat unit on the first floor. (3) Retention of revised site boundaries previously permitted under planning reference number 07/11345 and a second site entrance to facilitate access for vintage cars. (4) Permission to upgrade existing sewerage system permitted under planning reference 07/11345 to a new secondary wastewater treatment system and tertiary filter and all associated site works.Decision record indexed
    Decision12 September 2023View record
  31. © OpenStreetMap
    21/6853Granted

    Lackanalooha Mallow Co. Cork

    Retention of the extension to the side of existing dwelling and for retention of the conversion of the garage for habitable use within the dwelling and for retention of the bay window in front elevation of existing dwelling.Decision record indexed
    Decision07 December 2021View record
  32. © OpenStreetMap
    20/4342Granted

    Shronebeha Banteer Co. Cork

    The construction of a dwellinghouse and all associated site development works including the installation of a septic tank and percolation area, landscaping and the provision of a new site entranceDecision record indexed
    Decision02 July 2020View record
  33. © OpenStreetMap
    21/6162Granted

    Villa Jude Lackanalooha Upper Lackanalooha Td. Mallow, Co. Cork

    Demolition of existing attached garage to existing dwelling and construction of new extensions and alterations to existing dwelling and alteration to existing entrance and front boundary wall and all associated site works.Decision record indexed
    Decision27 January 2022View record
  34. © OpenStreetMap
    22/5054Granted

    Knockaunavaddreen Mallow Co.Cork

    Permission for retention for change of site boundaries, dwelling house and detached domestic shed and all associated site works all as constructed on site from that granted under N/00/1042Decision record indexed
    Decision27 September 2022View record
  35. © OpenStreetMap
    20/5184Granted

    Site 10 Cluain Ard Beennamweel West Bweeng Mallow, Co. Cork

    To construct a new dwelling house.Decision record indexed
    Decision11 September 2020View record
  36. © OpenStreetMap
    20/4395Granted

    Lackanalooha Mallow Co. Cork

    Retain 1) extension built to the south of existing dwelling, and 2) the roof window on the front elevation, and all associated site works.Decision record indexed
    Decision17 July 2020View record
  37. © OpenStreetMap
    21/6326Granted

    Knockaunavaddreen Ballyclough Mallow Co. Cork

    Construction of a livestock underpass, effluent holding tank and all associated siteworks.Decision record indexed
    Decision18 October 2021View record
  38. © OpenStreetMap
    20/6941Refused

    No. 6 Lower Beecher Street Lackanalooha TD Mallow Co. Cork

    To demolish existing dwelling and garage on site and to construct 2 no. dwellings and all associated site works.Grounds not yet categorised
    Decision23 February 2021View record
  39. © OpenStreetMap
    22/5090Granted

    6 Lower Beecher Street Lackanalooha, Mallow Co. Cork

    Permission to demolish an existing rear extension and storage shed of the existing dwelling house and construct a new rear extension to the existing dwelling house, and permission to construct 1 no. new dwelling house and all associated site works.Decision record indexed
    Decision30 January 2023View record
  40. © OpenStreetMap
    24/5503Granted

    Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork

    The Applicant is seeking permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind turbines each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • Turbine Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Crought, Ballyclogh including a new site entrance for the construction phase and upgrading of an existing entrance for the operational phase. • An on-site 38 kilovolt electrical substation to Electricity Supply Board Networks specification to include control building with electrical infrastructure, welfare facilities supplied by rainwater harvesting and storage tank, a wastewater holding tank with high level alarm, car parking, security fencing and lighting, and all associated infrastructure, services, and site works including a temporary construction compound. • All associated underground electrical and communications cabling connecting the turbines to the proposed electrical substation. • A temporary site construction compound and associated ancillary infrastructure including welfare services, office accommodation, parking, fencing, lighting etc. • Areas for temporary storage of excavated materials. • A permanent meteorological mast of 100 metres height above ground level on a concrete base. • Installation of approximately 13.5 kilometres of 38 kilovolts underground electrical cabling, mainly within the public road, between the proposed wind farm substation to the boundary of Mallow 110 kilovolt substation at Saint Joseph’s Road Mallow. • All associated site works including site clearance and ancillary development including site drainage/Sustainable Drainage System, security gates, fencing, permanent and temporary signage, and biodiversity mitigation and enhancements, including hedgerow planting. The Applicant is seeking a 10-year duration planning permission and 35-year operational period from the date of overall commissioning of the entire wind farm. The Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.The wind farm development is proposed on a site in the townlands of Polnareagha and Ardskeagh (Templemary E.D.); and Tullacondra and Croughta, (Kilmaclenine E.D.), County Cork. The proposed grid connection will be installed underground mainly within the public road from the wind farm site at Croughta, Ballyclogh to the boundary of the 110 Kilovolts substation at Saint Joseph’s Road, Mallow passing through the townlands of Kilmaclenine, Croughta, Knockaunavaddreen, Copestown, (Kilmaclenine E.D.), Ballybeg (Buttevant E.D.), Baltydaniel East, Twopothouse, and Caurraghakerry (Caherduggan E.D); and Cloghlucas North, Curraghphadeen, Ballyviniter Upper, Ballyviniter Middle, Ballyviniter Lower, Parkadallane, Carrigoon More and Carrigoon Beg Mallow Rural E.D.).Decision record indexed
    Decision22 May 2025View record
  41. © OpenStreetMap
    24/4713Granted

    Annabella Mallow Co Cork

    Permission for the construction of a new Biomass Plant for the generation of steam as part of the decarbonisation road map for the business. The development will consist of the construction of a single storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height of 27.292m above ground level, the construction of an extension to the existing pipe bridge, new internal access road and yard to facilitate vehicle movements and associated site works. The application relates to an establishment which has an Industrial Emissions Licence, Ref.No. P0403-03. A Natura Impact Statement (NIS) will accompany the application.Decision record indexed
    Decision18 February 2025View record
  42. © OpenStreetMap
    23/5097Refused

    Old Cork Road Ballydahin Mallow Co. Cork

    Erect a new portacabin structure to include accessibility ramp and associated works to be used as additional classroom for existing childcare facility with connections to all public services.Grounds not yet categorised
    Decision24 July 2023View record
  43. © OpenStreetMap
    20/5596Granted

    The existing staff car park at Dairygold's Nutritional Campus and 5, 6 and 7 West End, Annabella Mallow, Co. Cork

    The construction of a new 215mm solid block boundary wall with piers, of between 2.0-2.4m in height, plastered and capped, and new footpath, between the existing staff car park at Dairygold’s Nutritional Campus and 5 West End. The proposed development will also consist of the reinstatement of the original vehicular access via the archway between 6-7 West End (existing pedestrian/cyclist access, and existing gates to be retained); the blocking up of the existing northern pedestrian access from the existing car park (to match the existing boundary wall); and all ancillary works, including: the removal of existing internal bollards; the removal of the existing guardrail on West End; and the replacement of existing concrete footpath along West End; as well as all site development, drainage and landscaping works. There are no works proposed to the existing buildings at 5,6 and 7 West End (Protected Structures Reg. Nos. 100,101, and 102). The application relates to an establishment which has an Industrial Emissions License (P0403-03).Decision record indexed
    Decision03 December 2020View record
  44. © OpenStreetMap
    23/5390Refused

    5, 6 & 7 West End Mallow Co Cork

    Alteration/modification of the previously permitted (Ref: 21/6805) internal alterations, refurbishment and change of use of the apartment and office building (Protected Structures Reg. No’s 100,101 & 102). The proposed amendments include: (1) Provision of 2 No. additional residential units (1 bed split level) in lieu of the previously permitted management office at basement and ground floor levels (15 No. residential units in total); (2) Amending Unit 04 at ground floor to a 1 bed unit; (3) Provision of new staircase from the ground to basement in No. 5 West End; (4) Internal wall insulation proposed to external walls of basement level; (5) Internal alterations to third floor and provision of 2 No. roof AOVs; (6) Provision of 4 No. additional resident car parking spaces in lieu of the previously permitted staff parking.Grounds not yet categorised
    Decision17 October 2023View record
  45. © OpenStreetMap
    21/6805Granted

    No's 5, 6 and 7 West End Mallow Co. Cork

    Proposed internal alterations, refurbishment and partial change of use (1082sqm) from office to residential of No’s 5, 6 and 7 West End, Mallow, Co. Cork (Protected Structures Reg, No’s 100, 101 and 102) to provide 13 no. apartments (2 no. studio, 6 no. 1-bed and 5 no. 2-bed) an ancillary split-level management office and ancillary storage areas. External proposals include a new bicycle/refuse store, minor amendments to the existing car park and all associated site works. No alteration to the existing external elevations are proposed.Decision record indexed
    Decision21 April 2022View record
  46. © OpenStreetMap
    24/5088Granted

    Gortnagraige Mallow Co. Cork

    Permission to construct a single storey extension to the rear and side of existing dwelling house, 2 No. dormer windows to rear roof of existing dwelling house, material alterations to south eastern, front and rear elevations of existing dwelling house, septic tank and percolation area, new site entrance and all associated site works.Decision record indexed
    Decision04 March 2025View record
  47. © OpenStreetMap
    25/5017Granted

    Lackanalooha Mallow Co.Cork

    Permission to demolish 2 no. existing derelict sheds and to construct 2 no. dwellings, 2 no. site entrances and all associated site works and serviceDecision record indexed
    Decision11 December 2025View record
  48. © OpenStreetMap
    21/4295Granted

    Upper Lackanalooha Mallow Co. Cork

    Demolition of 2no. sheds and construction of a split level dwelling house incorporating garage, detached domestic garage/store at rear and all associated site works.Decision record indexed
    Decision27 October 2021View record
  49. © OpenStreetMap
    19/6229Granted

    Teagasc Offices Bellvue Ballydahin Mallow, Co. Cork

    Construction of single storey side office extension to existing Teagasc office building, removal/demolition of existing temporary office accommodation (including link corridor) and alterations to rear elevation of existing building and all associated site works.Decision record indexed
    Decision17 January 2020View record
  50. © OpenStreetMap
    22/4501Granted

    Emmet Street Mallow Co.Cork

    The demolition of existing structures and construction of a residential development of 22 no. apartment and duplex units in 3 no. blocks. Block 1 is 2 no. storeys and comprises 4 no. two bed units. Block 2 is part-1 to part-3 no. storeys and contains 6 no. one bed units, 6 no two bed units and 4 no. three bed units. Block 3 is 2 no. storeys comprising 2 no. one bed units. The development will also include boundary treatments, hard and soft landscaping, car parking, cycle parking, bin storage and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the planning authority.Decision record indexed
    Decision05 December 2022View record
Showing 401-450 of 2,003
Page 9 of 20