For the construction of a dwelling house, treatment unit, percolation area and all associated site services, Gross floor space of proposed works; 337sqmDecision record indexed
To construct a dwelling house, domestic garage/fuel store, septic tank, treatment system and percolation area. Gross floor space of proposed works: 189 sqm (house)Decision record indexed
Dalgan Demesne, Shrule, Co. Mayo. Permission is being sought by A Keady from Mayo County Council for a change of house plan from that granted under Planning Ref. No. P24/60229 at the above address.Grounds not yet categorised
Permission is being sought by A Keady from Mayo County Council for the construction of a serviced dwelling with an effluent treatment system and a garage/shed together with associated services.Decision record indexed
For the upgrade & relocation of the effluent treatment unit which is servicing the existing tourist accommodation that was granted under pl. ref. 03/5300 along with all associated site worksGrounds not yet categorised
For: 1. change of use from tourist accommodation to residential accommodation for 3 no. 1 bed fisherman's chalets, previously granted permission as tourist accommodation under planning ref: 03/5300, 2. Upgrade of existing septic tank & percolation area to tertiary treatment system with all associated site worksGrounds not yet categorised
For the demolition of an existing dwelling and the construction of a new replacement dwelling with an effluent treatment system and a garage/shed.Gross floor space of proposed works 297.00sqmGrounds not yet categorised
The development shall consist of side and front extension to existing ground floor layout, conversion and extension of existing first floor attic to accommodation, alterations to existing elevations and all ancillary site worksDecision record indexed
For alterations and extension to existing dwelling (revisions to previously approved Planning Ref; 32640 and 18/1703) and retain new domestic garageDecision record indexed
For reduced width of the vehicular entrance, for removal of a septic tank and the installation of a wastewater treatment plant with polishing filterDecision record indexed
For 1) retention of existing bedroom extension to the rear, 2) changes to plans and elevations previously granted under Pl. Ref No 19200, 23281 & 98/93 including changes to the door and window styles and changes of finishes from brick to nap plaster. Permission is being sought for a) the construction of 2 no. extensions to the rear and side elevations and b) the proposed upgrade and relocation of existing wastewater treatment system to new proprietary treatment system. Gross floor space of proposed works; 50.7sqm, Gross floor space of work to be retained; 18.6sqm, Gross floor space of any demolition; 16sqmDecision record indexed
For the construction of a detached domestic garage to replace current temporary structure on their property. Gross floor space of proposed works: 62 sqmDecision record indexed
To construct a private dwelling house, domestic garage, a proprietary effluent treatment system, and ancillary site development works. Gross floor space of proposed works: 260.78 sqm(H), 32.49 sqm(G)Decision record indexed
To construct a dwelling house with shed, sewerage system and associated site works at the above address. house - 220sqm, shed-54sqmGrounds not yet categorised
Of existing dwelling house, domestic garage, septic tank and percolation area on revised site boundary. Gross floor space of work to be retained: 85sqmDecision record indexed
For a single storey extension to gable of existing dwelling & changes to front elevation of existing dwelling. Gross floor space of proposed works: 30 sqm(extension)Decision record indexed
For an existing dwelling and domestic shed with associated services. Gross floor space of work to be retained: 155 sqm (house) & 18 sqm (garage)Decision record indexed
CONSTRUCT NEW SHED FOR STORAGE AND MAINTENANCE OF BOAT AND CAR, AND FOR RETENTION PERMISSION OF EXISTING SMALL SHED/STORE LOCATED TO THE REAR OF EXISTING DWELLING HOUSEDecision record indexed
To construct dwelling house, domestic garage and fuel store, wastewater treatment system and percolation area along with associated siteworks. Gross floor space of proposed works: House - 204.00 sqm, Garage - 60 sqmDecision record indexed
For the construction of dwelling house, domestic garage and proprietary treatment system. Gross floor space of proposed works: 200.6 sqm (house) and 60 sqm (garage)Decision record indexed
For development consisting of the construction of a new two storey dwelling house and garage with proprietary treatment system and percolation area along with all associated site works. Gross floor space of proposed works: 279 sqmDecision record indexed
To construct a private dwelling house, domestic garage, on site sewerage treatment system and all other site services. Gross floor space of proposed works: 209.00 sqm(H), 60.00 sqm(G)Decision record indexed
For ground-mounted and roof-mounted photovoltaic solar panels with a maximum square metreage of 1,450 m2 distributed over closed tanks and buildings combined with associated ancillary worksDecision record indexed
For: a) provision of a granny flat, b) a single storey extension to existing house c) internal & external alterations & d) all associated site worksDecision record indexed
For the upgrade works includes for pH correction of the existing treated water which involves conveyance of the feed water via an underground pipeline, 800mm in diameter & 50m long, to a new feed water sump, located adjacent to a new pump station. The pump station, approximately 110 m2 in footprint area & approximately 6.5m high houses 4 pump sets required to pump the feed water to a set of 4 degassers, with approximate dimensions 3m in diameter 8 meters high. Following degassing, the water is dosed with chemicals & returned to the treated water storage tank via a 800mm in diameter and approximately 50m long underground pipeline. Provision for overflow & draining has been allowed for from the sumps (treated & raw water) to the existing wastewater lagoon via a underground pipeline connecting to the existing plant liquid residuals collection network. Six new tanks varying in diameter from 3-5m with a maximum height of 7m, are required to store chemicals for the new treatment process. An existing road will be extended by 120m, between 5 - 12m wide, to facilitate the delivery of chemicals to the new footprint. A new pipeline, 200mm in diameter, approximately 150m long, is required for additional residual treatment in an existing tank. This application includes a Natura Impact StatementDecision record indexed
INSTALLATION OF FENCING, SOLAR PUMPS AND DRINKING TROUGHS. A NATURA IMPACT STATEMENT HAS BEEN PREPARED IN RESPECT OF THIS PROPOSED DEVELOPMENTDecision record indexed
RETENTION OF SIDE EXTENSION, REAR DORMER WINDOW AND RELOCATION OF PROPRIETARY EFFLUENT TREATMENT UNIT AND PERCOLATION AREA, TO AN EXISITNG DWELLING GRANTED UNDER P06/1515 AND ALL ASSOCIATED SITE WORKS.Decision record indexed
To operate a reception/temporary storage and recovery yard for scrap metal, including end of life vehicles. The Class(es) of Activity at the site, as specified in Part 1 of the third Schedule of the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended) will be as follows; Class 4: The reception, storage and recovery of scrap metal, including scrap metal arising from end-of-life vehicles (other than end-of-life vehicles) and WEEE where scrap metal from - (a) end-of-life vehicles shall be subject to appropriate treatment an recovery in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (b) waste vehicles (other than end-of-life vehicles) shall be subject to appropriate treatment and recovery having regard to the provisions of articles 14 and 15 of the Waste Management (End-of-Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (c) WEEE shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 20, 21 and 22 of the Waste Management (Waste Electrical and Electronic Equipment) Regulations 2005 (S.I. No. 340 of 2005) prior to acceptance at the scrap metal facility. Class 12: The collection and storage (including the temporary storage) and the appropriate treatment and recovery of end-of-life vehicles in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006).Grounds not yet categorised
For (1) the partial demolition of a rear flat roof extension to a dwelling. (2) The construction of a new extension to the dwelling (3) the construction of a new septic tank effluent treatment system and percolation area including all associated site development. Gross floor space of proposed works 91.30sqm.Decision record indexed