The development will consist of the replacement of the existing boundary perimeter chainlink/barbed wire fence and gate, with a new 2.4m high palisade fence and associated works
The development will consist of the replacement of the existing boundary perimeter chainlink/barbed wire fence and gate, with a new 2.4m high palisade fence with gate, and associated site works
For development at the existing Ballyquin Quarry. The development will consist of: (i) The extraction of sand from an area of approximately 16.3 hectares within an overall site area of 97.5 hectares; (ii) The infill and restoration of existing and future quarry voids (38 hectares) using inert soil and stone waste (imported inert greenfield and non-greenfield soils and stone, and river dredge spoil) which will be a soil recovery facility and require a waste management licence or soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone, and river dredge spoil) which will be notified to the Environmental Protection Agency (EPA) as an Article 27 by-product; (iii) The upgrade of existing quarry infrastructure including site office, weigh bridge, wheelwash, and welfare facilities; (iv) Refuelling area and associated drainage works, comprising 1 No. concrete hardstand area, hydrocarbon interceptor, wetland, inspection chamber and soakaway; (v) 1 No. soil inspection shed (c.875q. m) for the inspection of soil material; (vi) Erection of washplant; (vii) Settlement ponds; (viii) Landscape berms and fencing; (ix) All associated ancillary works. Site access is via the existing entrance off the R466. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. Should the inert soil, stone and inert dredge spoil materials be deemed to be a waste, then a Waste Management Licence will be required under Part 5 of the Waste Management Act 1996 (as amended) and an application for a Waste Management Licence will be made to the EPA following a grant of planning permission for the proposed development.
For the change of use of an existing derelict public house for use as a dwelling house. Permission is also being sought for the following to facilitate the change to a dwelling house:- 1) renovation of the existing building to include elevational changes; 2) demolition of existing single storey extension to the rear; 3) construction of a single storey extension to the rear; 4) construction of a two storey side extension to include a drive through arch (to access the rear yard); 5) conversion of the existing attic space including provision of rooflights to the front roof slope and a dormer structure to the rear; 6) construction of garage and shed to rear of property and 7) all associated site development works
Of as-constructed 2 storey extension to the rear of the existing dwelling together with all associated ancillary and site works.
To improve agricultural land by placing inert fill using existing access to the lands
For extensions and alterations to their existing semi-detached house and for a replacement waste water treatment system
The development will consist of the removal of the existing chainlink/barbed wire fence and gates and the erection of a new 2.4m high palisade fence with gates to enclose the existing Radio Receiver Building and adjacent ground, and associated site works
The development will consist of the construction of a 30m high multi-operator telecommunications support structure carrying antennas and dishes, with associate ground level equipment cabin and cabinets, and security fencing
To improve agricultural land by placing inert fill, modification of existing access route to lands with provision of new entrance/exit to replace existing entrance/exit and all ancillary site works required to facilitate the proposed development
To improve agricultural land by placing inert fill using existing access to the lands
For importation of inert soil and stone fill material (in excess of the tonnage granted permission under P14/446)
To construct dwellinghouse, garage, bored well, waste water treatment system, entrance and all associated site works
For the installation of 4 no. modular, portable Padel tennis courts, complete with artificial grass surface, 4m high fencing around sections of the Padel courts perimeter and 6m high integrated LED lighting and all other ancillary site works
Of land reclamation works, infilling and the placing of a fence and hardcore gravel and planning PERMISSION for the installation of 30m multi-user lattice support structure carrying telecommunication equipment including antennas, dishes, together with concrete equipment building, cabinets and all associated site development works. The development will provide for strategic transmission of wireless data and broadband services
For (1) to RETAIN part of land reclamation works consisting of peat topsoil extraction, hardcore gravel, access track and fencing. (2) PERMISSION for removal of part of land reclamation works consisting of hardcore gravel, fencing and container and reinstatement of stockpiled peat topsoil and (3)PERMISSION for the installation of a 30m multi-user lattice support structure carrying telecommunications equipment including antennas, dishes, together with concrete equipment building, cabinets and all associated site development works. The proposed development is in a different location to that proposed under planning reference P22/453 which was refused permission. The development will provide for strategic transmission of wireless data and broadband services
(1) of part of land reclamation works consisting of peat topsoil extraction, hardcore gravel, access track and fencing, (2) PERMISSION for removal of part of land reclamation works consists of hardcore gravel, fencing and container and reinstatement of stockpiled newt topsoil and (3) PERMISSION for the installation of a 30m multi-user lattice support structure carrying telecommunications equipment including antennas, dishes, together with concrete equipment building, cabinets and all associated site development works on land at Reaskcamoge, Woodcock Hill, Co Clare. The proposed development is in a different location to that proposed under planning reference P22-453 which was refused permission. The development will provide for strategic transmission of wireless data and broadband services
For change of use of a portion of the dwelling house from 'residential' use to a 'business premises incorporating a studio/classroom for visiting members of the public' and PERMISSION for amendments to the floor plans and elevations permitted under application Reg. Ref. 16/144
For development which will consist of the use of a caravan as an independent dwelling adjacent to an existing outbuilding.
For the construction of a single storey extension to the rear and side of the existing dwelling, together with all associated ancillary and incidental site works
To construct an extension to side and rear of existing dwelling house comprising living room, bedroom, sunroom and associated renovation works
For the construction of a single storey extension to existing derelict dwelling, alterations to existing derelict dwelling, vehicular entrance with new boundaries, new effluent treatment plant and all ancillary site works
For development of a wind farm in the townlands of Fahy Beg, Fahy More North, Ballymoloney, Ballyknavin (Ed O'Briensbridge), Balllyquin More, Woodpark and Leitrim, Co Clare together with the development of an underground grid connection cable to the national grid. The underground grid connection is located primarily within the public road within the townlands of Leitrim, Fahy More South, Ballybrack, Aharinaghmore, Tooreen (Ed Cloghera) Aharinaghbeg, Knockdonagh, Roo East, Blackwater, Rosmadda West, Parkroe, Lackyle (Ed Ballyglass) and Castlebank, Co Clare. Temporary accommodation works to facilitate the delivery of wind turbine components to the site will be required in the townland of Ardataggle, Co Clare. The development will consist of: Construction of 8 no. wind turbines with a blade tip height range from 169m to 176.5m, a hub height range from 102.5m to 110m and a rotor diameter range from 131m to 138m; Erection of 1 no. permanent meteorological mast to a height of 100m above ground level; Construction of 1 no. onsite 38kV electrical substation to ESB Networks (ESBN) specifications and associated compound including Welfare facilities, Electrical infrastructure, Parking, Wastewater holding tank, Rainwater harvesting tank, Security fencing and all associated infrastructure, services and site works including landscaping in the townland of Woodpark; Installation of medium voltage electrical and communication cabling underground between the proposed turbines and the proposed on-site substation and associated ancillary works; Construction of turbine foundations and crane pad hardstanding area; Construction of new site tracks and associated drainage infrastructure; Upgrading of existing tracks and associated drainage infrastructure where necessary; Access to the proposed wind farm site will be from the R466 local road and will consist of the use of an existing quarry entrance in the townland of Leitrim which will be upgraded, as well as the creation of 1 no. new permanent site entrance on the Fahymore local road in the townland of Ballyquin More, and the use of 1 no. existing field entrance which will be upgraded, in the townland of Ballymoloney. The site entrances shall be used for both construction and operation of the proposed wind farm; All associated drainage and sediment control; Installation of new watercourse and drain crossings; Reuse and upgrading of existing internal watercourse and drain crossings; 2 no. temporary construction site compounds and
To construct a dwelling house, garage, bored well, waste water treatment system, percolation area, entrance and all associated site works
To construct an extension, comprising of a loading bay and dock leveller, to the side of the stand alone warehouse permitted under planning ref. no P22/1036.
To demolish part of an industrial unit comprising of a single storey office block and to construct a two storey office block extension, with external company signage, to construct a warehouse extension, provide a cladding finish to the north east elevation of the existing building, to replace the existing septic tank system with a new packaged wastewater treatment system and polishing filter, external hard and soft landscaping and all ancillary site works
For the construction of an extension to the side of the existing industrial building and also for a stand alone warehouse building and to extend the site boundaries and all ancillary site works
For change of use from residential dwelling to Long-term residential care facility for people with disabilities and retain existing rear extension all as per drawing documentation submitted together with all ancillary site works and services.
For to erect an extension to the side of house and all associated site works
Of the existing shed at the rear of existing dwelling house and all associated site works
For the development which will consist of the modification of the existing Planning Application 20/381 (grant date: 14.10.2020). Modification to consist of a change of design. This new design will include for the provision of a new single storey dwelling house, garage, vehicular entrance, waste water treatment system, and associated site works
For the construction of a dwelling house, garage, vehicular entrance, wastewater treatment plant and ancillary site works.
For the construction of single storey sunroom and boiler room extensions to existing dwelling house, a raised external deck, change of use of existing out buildings to residential use and all ancillary site services
Of an existing 80m high lattice type meteorological mast and associated instruments, for a period of two years
To RETAIN alterations to elevations and roof of existing house together with all associated site works
To build a Dwelling House, install a wastewater treatment system & all other associated site and ancillary works
Of the elevations of existing dwelling house as constructed
To RETAIN extension to existing dwelling; to RETAIN garage and shed to rear of property and associated site works
For the construction of an extension to existing dwelling house to comprise of kitchen, utility, cloaks, two bedrooms with en-suites and walk-in-wardrobes, for permission to refurbish existing dwelling and convert two existing bedrooms to study and laundry room including ancillary site works.
To RETAIN change of use of dwelling house and site to full day care creche and associated site works as well as for portacabin utilised for storage at Happy Hippos Creche
To build a dwelling house, install a waste water treatment system and all associated site and ancillary works
To construct dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
To construct a dwelling house, garage, waste water treatment system, percolation area, entrance and all associated site works
Of changes to dwelling layout and elevations from previously granted permission 08/1292 which includes addition of playroom, utility and WC at the ground floor & additional extra floor area and conservatory to the rear, relocated site entrance, changes to site layout. PERMISSION to construct a single storey extension to the side of the dwelling and all associated site works
To alter and extend existing dwelling house along with ancillary site works
To construct dwelling house, domestic shed, entrance, waste water treatment system plus all ancillary site works
To construct domestic shed on site with permitted dwelling, planning ref P23-397, plus all ancillary site works
Of a) 1st floor conversion dormer windows, rear extensions, alterations and fenestration changes b) detached garage c) installation of new wastewater treatment system and location of soil polishing filter, d) boundaries as constructed together with all ancillary site development works and services
Of a) enlarged dwelling house from what was granted under P05/1935 b) 1st floor attic conversion c) chimney location, installation of roof windows and fenestration changes d) 2no. domestic sheds along with boundaries as constructed together with all ancillary site development works and services
For a single storey extension and alterations to an existing dwelling with associated site works