to
to

Planning records

Showing 1-22 of 22 public records
PreviousPage 1 of 1Next
ABP31244722/E

Permission for a Strategic Housing Development proposed for development in this application are bounded by the N11, No.1 Grange Cottage and the permitted SHD ABP-305345-19 development under construction. The proposed ‘Built to Rent’ residential development shall provide for 102 no. units with associated facilities, and ESB Substation. The development will include the following: 1 no. residential block, Block L, comprising a development with a footprint of approx. 0.26ha which represents Phase 1 of the masterplan development envisaged for this overall site. The Block comprises a series of pavilions over basement ranging in height from 5 to 7 to 10 storeys addressing the N11. A total of 102 no. ‘Build to Rent’ residential units (3 no. studios, 79 no. 1 beds, 20 no. 2 beds) are proposed, all with balconies and/or terraces. 36 no. car parking spaces are provided at basement level of Block L to serve the development accessed via ramp to adjoining basement of the permitted SHD development, with a total of 125 no. spaces for the overall Masterplan site. A total of 207 no. bicycle spaces are proposed for Block L with 175 no. spaces located at basement level and 32 no. surface spaces. A satellite bin store (17.3 sqm) is located in the basement of Block L. The main waste management facility for the overall scheme is located at basement level adjacent to the main core (block H). The application will also comprise a new ESB Substation(permitted block Q) and landscaping works to link Phase 1 to the permitted scheme and provide a permanent pedestrian link to the N11. Each new residential unit has an associated area of private open space in the form of a terrace/balcony. Open Space (approx. 1,318.1 sq m) is proposed in the form of (a) primary open space (695.5 sq m) which includes a central garden of 562.2 sq m, and (b) perimeter open space (623.6 sq m). A large residents lounge ( approx. 92.1 sq m) is proposed at garden level with direct access to the central garden. Additional residential amenity space (approx. 961.5 sq m) is also located at basement level under the entrance lobby accessed through block H’s core. A new pedestrian connection between Block L and No. 1 Grange Cottage is proposed which will traverse the permitted SHD development and link the N11 with Leopardstown Oak Park. Vehicular Access to the development remains as permitted under SHD ABP-305345-19 Associated site and infrastructural works including the provision for water services; foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works; green roofs; boundary treatment; internal roads and footpaths; and electrical services. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.

Lands at The Grange, Brewery Road/Stillorgan Road, Stillorgan, Blackrock, Co. DublinDun Laoghaire Rathdown County CouncilExtension Of Duration Of Permission0 reasons0 conditions
Granted25 March 2026
V/006/26

1 Dwelling.

Site to the rear of 33, 33a & 33b, Dale Road facing onto St. Kevins Park, Stillorgan, Co. Dublin.Dun Laoghaire Rathdown County CouncilCertificate of Exemption - Part V0 reasons0 conditions
Granted04 March 2026
D25A/0894

The constructon of 1) a single storey extension to the rear, 2) an attic conversion with a revised roof profile to include a new gable end on the western side and a raised ridge to the front, side and rear, 3) a dormer window to the rear at attic level, 4) velux roof windows to the front, side and rear, 5) external insulation to the existing front, side and rear elevations, 6) alterations to the existing bathroom window at ground floor level to the side, 7) provision of a new door serving the proposed new utility room to the western side, and 8) to widen the existing vehicular access exiting onto Linden Lea Park, Stillorgan, Co. Dublin, with all associated site works.

11 Linden Lea Park, Stillorgan, Co. Dublin, A94FX72Dun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Granted26 January 2026
D17A/0337/E

Permission for a 7 year permission for the demolition of 3 no. existing residential dwellings known as 'Annaghkeen', Dalwhinnie' and 'Marian Villa' and associated outbuildings (combined demolition c.662.2 sqm GFA) and the material change of use of St Joseph's House from residential care facility to residential use to provide for an overall development of 139 no. residential units (133 no. apartments and 6 no. houses) all in a scheme of 2-5 storeys partly over dual access basement level. The proposal shall provide for a new residential scheme (Blocks A-E) including: A. The construction of Blocks A-c (3-5 storeys) over dual access basement level (c.4,311 sqm) comprising 122 no. apartment units. B. The Construction of 6 no. townhouses in the form of Block D. C. The refurbishment and separation of St Joseph's House (2 storeys) into 11 no. residential units to form Block E, which shall include the demolition of a single storey extension and associated outbuildings (demolition total c.172.82 sqm GFA), the removal of external gates, modifications to elevations including new windows, doors and glazed balcony, new external steps and ramps, modifications to internal layout including the removal of walls and partitions and the addition of new dividing walls and part new roof. Block A (5 storeys) shall provide for 53 no. apartment units (13 no. 1 beds, 37 no. 2 beds and 3 no. 3 beds); Block B (5 storeys) shall provide for 58 no. apartment units (7 no. 1 beds, 49 no. 2 beds and 2 no. 3 beds); Block C (3 storeys) shall provide for 11 no. apartment units (7 no. 1 beds, 3 no. 2 beds and 1 no. 3 beds); Block D (2-3 storeys) shall provide for 6 no. townhouses (5 no. 3 bed terrace houses - Type T1 and 1 no. 4 bed detached house - Type T2) and Block E (2 storeys) shall provide for 11 no. apartment units (8 no. 2 beds and 3 no. 3 beds) in the former St Joseph's House building all with associated balcony/terrace/private garden areas. The development shall also consist of the amalgamation of 3 no. existing access points along Leopardstown Road (R113) to provide for 1 no. vehicular and pedestrian access point. The existing access point from Brewery Road (N31) to St Joseph's House via Silverpines will be maintained and the existing access serving the Anne Sullivan Centre for the Deaf Blind will be maintained with minor revisions to the point of access. Permission is also sought for 166 no. car parking spaces (139 no. at basement level, 27 no. at surface level), 200 no. bicycle parking spaces, bike stores (at basement and surface level), bin storage areas (at basement and surface level), plant areas, c.5,960 sqm of public open space (including new tree walk, courtyard spaces and new play area), new boundary treatment, green roofs associated with Blocks A-C, provision for pedestrian connections to the adjoining park, site services and all associated site development service connections and landscape works. A protected structure.

Site of c.1.65 ha at Annaghkeen & Dalwhinnie, Leopardstown Road (R113), Dublin 18 & St Joseph's House for the Adult Deaf & Deaf Blind (a Protected Structure) & adjoining lands including Marian Villa, Brewery Road N31), Stillorgan, Co Dublin.Dun Laoghaire Rathdown County CouncilExtension Of Duration Of Permission0 reasons0 conditions
Granted18 August 2025
D24A/0370/WEB

The proposed development consists of: The demolition of The Orchard public house (gfa 677.8sq.m). The construction of 2 no. apartment blocks one at the front (6 storey) and one at the rear of the site (4 storey, over first floor podium) containing 41 apartments in total. The maximum building height will be 19.8m high. The apartment block to the front (Block A) will contain 33 apartments along with a restaurant/retail unit at ground floor level (517.2sq.m). The apartment block to the rear (Block B) will contain 8 apartments. A first floor podium will be provided between the two blocks with landscaping and car parking under. Green roofs are provided on the roof levels of both apartment blocks. An ancillary ESB switch room (38sq.m) and bin store (9.2sq.m) are also proposed within a recess to the southern boundary of the site. The existing vehicular access from The Hill will be modified. All ancillary development including public open space, communal open space, private open space, 27 no. car park spaces, 58 no. cycle spaces, bin storage, hard and soft landscaping, internal roads and paths, and lighting. All associated site works. The application is accompanied by a Natura Impact Statement.

The Orchard, 1 The Hill, Stillorgan, Co. Dublin, D08C98XDun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Granted19 May 2025
ABP31326622

Planning permission for a strategic housing development consisting of the construction of a mixed use scheme of 377 no. ‘Built to Rent’ BTR apartments, Community Sports Hall (c. 933 sq. m), along with 5 no. restaurant/cafés (c. 841 sq.m), creche (c. 215 sq. m), office (c. 195 sq m) and ancillary residents’ support facilities/services (c. 1,016 sq. m) laid out in 6 no. blocks ranging in height from 3-9 storeys (over basement) comprising 21 no. studio apartments, 189 no. 1 bedroom apartments, 159 no. 2 bedroom apartments & 8 no. 3 bedroom apartments (selected no. with balconies), and public realm upgrades as follows: Building 01 (Part 3, 4, 6 & 7 storeys over basement) consists of 77 no. apartments comprising 13 no. studio apartments, 30 no. 1 bedroom apartments, 33 no. 2 bedroom apartments, 1 no. 3 bedroom apartment (with a creche of c. 215 sq. m with associated play area at ground floor); Building 02 (Part 3, 5, 7 & 8 storeys over basement, (with a two-storey undercroft at ground and first floor levels on northern elevation of building) consists of 95 no. apartments comprising 7 no. studio apartments, 57 no. 1 bedroom apartments, 24 no. 2 bedroom apartments, 7 no. 3 bedroom apartments; Building 03 (Part 7 and 9 storeys over part basement) consists of 54 no. apartments comprising 18 no. 1 bedroom apartments and 36 no. 2 bedroom apartments (and office of c. 195 sq. m); Building 04 (7 storeys over basement) consists of 60 no. apartments comprising 42 no. 1 bedroom apartments & 18 no. 2 bedroom apartments; Building 05 (6 storeys, over basement to Lower Kilmacud Road & 7 storeys to the south and west) consists of 62 no. units comprising 1 no. studio apartment, 26 no. 1 bedroom apartments, & 35 no. 2 bedroom apartments (restaurant/café unit c. 219 sq. m at lower ground floor/plaza level & 2 no. restaurant/café units c. 234.1 sq. m and c. 133.9 sq. m respectively at ground floor level onto Lower Kilmacud Road) along with a double height Community Sports Hall including ancillary areas (c. 933 sq. m); Building 06 (5 & 6 storeys) consists of 29 no. units comprising 16 no. 1 bedroom apartments and 13 no. 2 bedroom apartments (restaurant/café unit c. 185.9 sq. m at lower ground floor/plaza level & 68.1 sq. m restaurant/café unit at ground floor level onto Lower Kilmacud Road); The BTR development will also include ancillary Residents’ Support Facilities/Services (c. 1,016 sq. m at ground floor of Building 03 and 04) as well as open space areas and improvements to the public realm along the Lower Kilmacud Road (to footpath and cyclepath) and The Hill, new road layout (omission of left turning lane, widening of footpath) to The Hill, hard and soft landscaping, set down area on the Lower Kilmacud Road. Provision of 2 no. vehicular access points from ‘The Hill’ into 2 no. separate basements to include basement car parking spaces (119 no.); 1 no. set down surface car parking space as well as 866 no. cycle spaces (basement and surface levels) and ancillary areas; pumping stations at basement level, along with solar panels, and green roofs at roof level; All associated site development works, open spaces, landscaping, boundary treatment, plant areas, waste management areas, and services provision (including ESB substation). The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Development Plan and Local Area Plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. A Natura Impact Statement has been prepared in respect of the proposed development. The application, together with the Natura Impact Statement, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.BlakesSHD.com

Site of c. 1.41 ha at the former Blakes and Esmond Motors sites, Lower Kilmacud Road, the Stillorgan Road, (N11) and the Hill, Stillorgan, Co. DublinDun Laoghaire Rathdown County CouncilCertificate of Exemption - Part V0 reasons0 conditions
Granted04 March 2025
D24A/1011/WEB

The development consists of Retention permission for: 1) The removal of previous pedestrian gate and pillar to front boundary; 2) The existing rear garden room.

41, Stillorgan Park, Stillorgan, Co. Dublin, A94P267Dun Laoghaire Rathdown County CouncilPermission for Retention0 reasons0 conditions
Granted17 February 2025
V/084/24

1 dwelling

39, Beaufield Park, Stillorgan, Co DublinDun Laoghaire Rathdown County CouncilCertificate of Exemption - Part V0 reasons0 conditions
Granted06 December 2024
D24A/0577/WEB

1) Demolition and removal of the existing single storey extension to rear of the existing house. 2) Demolition of the existing entrance porch to the front of the existing house. 3) Construction of a new two-storey extension to the rear of the existing house with flat and pitched roof, to include new kitchen & living area, utility room, three no. WCs, two bedrooms & two storage areas. 4) Construction of a new front porch to the front of the house. 5) 2 no. rooflights to the proposed flat roof rear extension. 6) Partial removal of the front railing and hedge to facilitate the provision of new vehicular access with off-street car parking to the front of the house off Beaufield Park. 7) Elevational changes to the existing house including new windows to the front elevation and proposed external insulation with render finish, and proposed wet dash finish. 8) The development will include all associated landscaping, drainage and site development works.

8, Beaufield Park, Stillorgan, Co. Dublin, A94N124Dun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Granted11 November 2024
D24A/0340/WEB

Permission for development at 39 Fairyhill, Stillorgan Park, Blackrock, Co. Dublin, A94 WF98. The development will consist of: (a) demolition of an existing single storey side extension and an existing conservatory to the rear of the building; (b) a new single storey extension to the side to create a new front entrance; (c) a new single storey extension to the rear of the building; (d) removal of the existing hipped roof to the southern end of the building and new flat roof in its place; (e) a new dormer attic extension to the southern side of the roof with rooflight; (f) 1 no. dormer window to the northern side of the roof; and (g) a new single storey detached garden room studio at the rear of the site. All with associated and ancillary site works.

39, Fairyhill, Stillorgan Park, Blackrock, Co. Dublin, A94WF98Dun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Granted10 July 2024
D23A/0587

(a) GAA Skills training wall consisting of 3 no. 5m high pre cast concrete skills walls, Wall 1 =33.5 Wall 2=19.1m & Wall 3 = 46.9m (total length =99.5m) constructed at the south end of the existing clubhouse (b) Extend/enlarge the existing astro pitch area by 876sqm and install a 5m high net/fence to the infill areas. (c) Relocated 4 no. existing flood lights and all associated site development works.

Naomh Olaf GAA Club, Holly Avenue, Stillorgan Industrial Park, Co. Dublin, A94PF75Dun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Granted22 January 2024
D23A/0343

Temporary retention of development for a period of five years. The development to be retained for a further 5 year period (2 year temporary permission granted under D21A/0253) comprises a single storey takeaway coffee kiosk (c. 7m2) occupying 1 no. car parking space in front of 120 Lower Kilmacud Road.

120C, Lower Kilmacud Road, Stillorgan, Co DublinDun Laoghaire Rathdown County CouncilPermission for Retention0 reasons0 conditions
Granted13 July 2023
ABP30052017/E

Cairn Homes Properties Limited intend to apply to An Bord Pleanála for planning permission for a strategic housing development at former the Blakes and Esmonde Motors sites, Lower Kilmacud Road, the Stillorgan Road (N11) and The Hill, Stillorgan Co. Dublin. The site is located to the south east of Stillorgan Village Centre, to the west of the N11, and to the north and north east of The Hill. The development will consist of the demolition of existing vacant buildings (3,087.4 sq.m.) and the construction of a mixed use development comprising of a student accommodation development (179 no. student accommodation units (576 no. bed spaces) including student amenities such as gym, study spaces, communal lounges), 103 no. residential apartment units including private balconies / terraces on all elevations, comprising of (24 no. 1 bed units, 70 no. 2 bed units and 9 no. 3 bed units), 907 sq.m. of retail / restaurant / café / co-working space and a community sports hall (297.6 sq.m.) all on a site of 1.345 hectares. The proposed development will comprise of 4 no. buildings (Building 1 & 2 - Residential and Building 3 & 4 - Student Accommodation ) ranging in height from 9 no. storeys at the junction of the Lower Kilmacud Road and the N11 decreasing to 4 no. storeys at the junction of The Hill and the Lower Kilmacud Road and reducing further to 3 no. storeys at the southern boundary of the site adjoining the existing residential dwellings along The Hill. The proposed development also includes the provision of public, communal and private open space including children's play area, 2 no. new civic spaces, improvements to the public realm along the Lower Kilmacud Road and The Hill, hard and soft landscaping, set down off the Lower Kilmacud Road, new road layout to The Hill, 7 no. on street car parking spaces on The Hill, 143 no. car parking spaces (103 no. for residential and 40 no. for student accommodation) including 2 no. Go-Car spaces set out over 2 no. individual basements separately accessed from The Hill, 528 no. bicycle parking spaces (265 no. long stay and 106 no. short stay spaces to serve the student accommodation, 21 no. short stay and 103 no. long stay to serve the residential development and 26 no. short stay and 7 no. long stay to serve the retail / café / restaurant/ co-working space) revised boundary treatment, 2 no. ESB substations and switch rooms, fascia signage associated with the retail / café / restaurant / co-working space developments and all ancillary site development works necessary to facilitate the development. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan and local area plan. The subject site is zoned objective 'DC' in the Dun Laoghaire Rathdown County Development Plan 2016-2022. The application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.stillorganresplanning.com. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1, relating to the implications of the proposed development, if carried out, for proper planning and sustainable development in the area or areas concerned, and the likely effects on the environment or the likely effects on a European site, as the case may be, of the proposed development, if carried out. Submissions or observations duly made will be considered by An Bord Pleanála in making a decision on the application. Such submissions or observations must also include the following information: (a) the name of the person, authority or body making the submission or observations, the name of the person, if any, acting on behalf of that person, authority or body, and the address to which any correspondence relating to the application should be sent, (b) the subject matter of the submission or observations, and (c) the reasons, considerations and arguments on which the submission or observations is or are based. An Bord Pleanála may grant permission for the strategic housing development as proposed, or may grant permission subject to such modifications as it specifies in its decision, or may grant permission in part only, with or without any other modifications it may specify in its decision, or may refuse to grant permission for the proposed development. An Bord Pleanála may attach to a grant of permission such conditions as it considers appropriate. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100). A person may question the validity of a decision of An Bord Pleanála by way of an application for judicial review, under Order 84 of the Rules of the Superior Courts (S.I. No. 15 of 1986), in accordance with sections 50 and 50A of the Planning and Development Act 2000 (No. 30 of 2000), as amended. Practical information on the review mechanism can be found in the Judicial Review Notice on the An Bord Pleanála website: www.pleanala.ie or on the Citizens Information Service website: www.citizensinformation.ie.

Former the Blakes and Esmonde Motors sites, Lower Kilmacud Road, the Stillorgan Road (N11), and The Hill, Stillorgan, Co. DublinDun Laoghaire Rathdown County CouncilExtension Of Duration Of Permission0 reasons0 conditions
Refused18 May 2023
D22A/0475

Permission for development. The development will consist of existing buildings on site including St. Anne's Convent and the construction of 19 No. apartments over 3 stores, including 09 No. 1 beds, and 10 No. 3 beds duplex units, with associated balconies, basement car parking provision, bin storage, bicycle storage, and existing vehicular and pedestrian access to whatley Place. All with associated landscaping, boundary treatments, drainage, site works and development works.

St Anne's Convent, Kilmacud Road Upper, Kilmacud Stillorgan, Dublin, Co DublinDun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Granted30 March 2023
D22A/0819

Temporary retention permission for development on a site of 0.0070ha. The development to be retained for a further 5 year period (2 year temporary permission granted under reg ref D20A/0861) comprises a single storey takeaway coffee kiosk (approx 17m2) and associated outdoor seating area with boundary treatment, all occupying 7no. car parking spaces in the existing car parking area adjoining the Millhouse Pub.

The Millhouse Pub, 1, Lower Kilmacud Road, Stillorgan, Co. Dublin, A94CT88Dun Laoghaire Rathdown County CouncilPermission for Retention0 reasons0 conditions
Granted12 December 2022
D22A/0578

Permission is sought for the construction of ground and first floor bay windows with apex roof to the front elevation facing west, an extension for an additional bedroom over the garage, the extending of the garage forward in line with the bay windows and a canopy over the garage across the front door and linking into the bay window. External insulation and the fitting of solar panels to the roof, the widening of the entrance gates to 3400MM. To the rear elevation facing East, a new kitchen extension is proposed, a new window to bedroom 4, a bay 2-sided window off the main rear bedroom 1 at first floor level facing only onto the property.

14, Leopardstown Park, Stillorgan, Co. Dublin, A94 PN27Dun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Granted29 September 2022
D22A/0494

Permission is sought for the installation of 1 no. automated car park security barrier and associated site works at the car parks and road entrances entirely situated within the site

Granada House (formerly known as Riversdale) (A Protected Structure) at St John of God Hospital, Stillorgan Rd, Blackrock, Co. DublinDun Laoghaire Rathdown County CouncilPermission0 reasons3 conditions
Granted24 August 2022
ABP31244722

Permission for a Strategic Housing Development proposed for development in this application are bounded by the N11, No.1 Grange Cottage and the permitted SHD ABP-305345-19 development under construction. The proposed ‘Built to Rent’ residential development shall provide for 102 no. units with associated facilities, and ESB Substation. The development will include the following: 1 no. residential block, Block L, comprising a development with a footprint of approx. 0.26ha which represents Phase 1 of the masterplan development envisaged for this overall site. The Block comprises a series of pavilions over basement ranging in height from 5 to 7 to 10 storeys addressing the N11. A total of 102 no. ‘Build to Rent’ residential units (3 no. studios, 79 no. 1 beds, 20 no. 2 beds) are proposed, all with balconies and/or terraces. 36 no. car parking spaces are provided at basement level of Block L to serve the development accessed via ramp to adjoining basement of the permitted SHD development, with a total of 125 no. spaces for the overall Masterplan site. A total of 207 no. bicycle spaces are proposed for Block L with 175 no. spaces located at basement level and 32 no. surface spaces. A satellite bin store (17.3 sqm) is located in the basement of Block L. The main waste management facility for the overall scheme is located at basement level adjacent to the main core (block H). The application will also comprise a new ESB Substation(permitted block Q) and landscaping works to link Phase 1 to the permitted scheme and provide a permanent pedestrian link to the N11. Each new residential unit has an associated area of private open space in the form of a terrace/balcony. Open Space (approx. 1,318.1 sq m) is proposed in the form of (a) primary open space (695.5 sq m) which includes a central garden of 562.2 sq m, and (b) perimeter open space (623.6 sq m). A large residents lounge ( approx. 92.1 sq m) is proposed at garden level with direct access to the central garden. Additional residential amenity space (approx. 961.5 sq m) is also located at basement level under the entrance lobby accessed through block H’s core. A new pedestrian connection between Block L and No. 1 Grange Cottage is proposed which will traverse the permitted SHD development and link the N11 with Leopardstown Oak Park. Vehicular Access to the development remains as permitted under SHD ABP-305345-19 Associated site and infrastructural works including the provision for water services; foul and surface water drainage and connections; attenuation proposals; permeable paving; all landscaping works; green roofs; boundary treatment; internal roads and footpaths; and electrical services. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.grangephase1shd.ie

Lands at The Grange, Brewery Road/Stillorgan Road, Stillorgan, Blackrock, Co. DublinDun Laoghaire Rathdown County CouncilPermission (SHD)0 reasons24 conditions
Granted02 June 2022
D21B/0282

Permission is sought for conversion of existing attic area

1 Allen Park Drive, Stillorgan, Co. Dublin, A94 PD37Dun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Granted27 July 2021
D20A/0461

Permission for development. The development will consist of the: 1. Demolition of single storey side extension. 2. New vehicular entrance off Allen Park Road for the proposed new house. 3. The construction of a two storey and partial single storey 2 bedroom flat roof house. 4. Alterations to boundary walls, landscaping, drainage works and ancillary and associated works.

Side garden, No. 50 Allen Park Road, Stillorgan, Co. DublinDun Laoghaire Rathdown County CouncilPermission0 reasons13 conditions
Granted30 November 2020
D20A/0295

Permission. The development will consist of (i) demolition of existing two storey office building (office use permitted under Reg. Ref. 93A/1440; (ii) construction of a four storey mixed-use development, comprising retail and residential use consisting of: (a) retail unit (77.55sq.m) at ground floor level; (b) 1 no. one-bed apartment at ground floor level; (b) 1 no. one bed apartment at first floor level; (c) 1 no. three bed duplex unit at first and second floor level; and (d) 1 no. three bed duplex unit at second and third floor level. Each unit to be provided with private amenity space, comprising balcony or terrace (5.2sq.m to 19.8 sq.m); (iii) the provision of 2 no. car parking spaces to the rear of the site and the provision of internal bike store (9.3sq.m); and (iv) The development also includes landscaping, SuDS drainage and all ancillary works necessary to facilitate the development.

28 Dale Road, Stillorgan, Co. Dublin A94 W8Y6Dun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Refused08 July 2020
D20A/0222

Permission for development. The development will consist of the demolition of 1 No. (1 and 2 storey) residential unit. ''Árd na Glaise'' (c 400sq Gross Floor Area (GFA)) and the construction of a residential development comprising 63 No. residential (53 No. apartments and duplex units and 10 No. houses) consisting of: Apartment Block A1 (4 storey block, c. 1,436 sqm GFA) comprising: 2 No. studio units (c. 37.5 sqm GFA each); 7 No. 1 bed units (ranging in size from c. 48.1 sqm GFA to 53.5 sqm GFA); 9 No. 2 bed units (ranging in size from c. 77.1 sqm GFA to 85.4 sqm GFA ); Block A1 comprises balconies on southern, northern and western elevations; and sedum roof at roof level. Apartment Block B1 (3 and 5 storey block c. 2,260 sqm GFA) comprising: 1 No. studio unit (c. 42 sqm GFA each); 10 No. 1 bed units, (ranging in size from c. 48.2 sqm GFA to 50.6 sqm GFA); 15 No. 2 bed units, (ranging in size from c. 74.1 sqm GFA to 81.6 sqm GFA); 1 No. 3 bed unit (c. 98.1sqm GFA). Block B1 comprises balconies on southern, northern and western elevations; a roof terrace at 3rd floor level and sedum roof at roof level. 2 No. Duplex Blocks D1 (3 storey blocks), comprising c.805 sqm GFA (for both blocks) and providing the following units within both blocks: 4 No. 2 bed units (c. 82 sqm GFA each); 4 No. 3 bed duplex units (ranging in size from c. 113.6sqm GFA to 114.8sqm GFA); 10 No. 2 storey semi detached / terraced 3 bed houses (ranging in size from c. 116.0sqm GFA to 128.0 sqm GFA). The development will also consist of: a revised vehicular access to the development from Stillorgan Park (R825); a separate pedestrian access to the development from Stillorgan Park (R825); a gated pedestrian access to Coppinger Glade at the south-eastern side of the development; the provision of 44 No. surface level car parking spaces, 2 No. motorcycle spaces; 82 No. bicycle parking spaces; 1 No. bicycle shelter to the west of revised vehicular access off Stillorgan Park (R825); 1 No. ESB distribution kiosk to the east of proposed vehicular access from Stillorgan Park (R825); ancillary bin storage structures; and all associated landscaping and boundary treatment works, the provision of public and private open space areas comprising hard and soft landscaping, site services (foul and surface water drainage and water supply); and all other associated site excavation, infrastructural and site development works above and below ground.

At a site of 0.81 ha, Ard Na Glaise, Stillorgan Park, (R825) Co. DublinDun Laoghaire Rathdown County CouncilPermission0 reasons0 conditions
Refused30 June 2020
Showing 1-22 of 22