Planning records
Showing 1-6 of 6 public recordsWe, Cairn Homes Properties Limited, intend to apply to Fingal County Council for permission for a Large-scale Residential Development at this site located within the Estuary West Lands at "Holybanks", Swords, Co. Dublin. The main development site is bounded by Glen Ellan Road to the south, Jugback Lane/Terrace to the west, the former Celestica factory site to the east and the Broadmeadow River to the north. The proposed development is an amendment to the permitted development FCC Reg. Ref.: LRD0018/S3E. The amendments will consist of changes to 1. the locations and dimensions of the permitted ESB substations and bin and bicycle stores including the relocation of some bicycle storage space into the ground floor of block 10; 2. Condition 5; and 3. Condition 23 Permission is also sought for all associated works to accommodate the proposed changes. The remainder of the permitted development, including accesses, site services, and all other works will be delivered as permitted under FCC Reg. Ref.: LRD0018/S3E. The application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin (to inspect Planning Applications on all lands). Opening Hours 9.30 - 16.30 Monday - Friday. (Cash Office opening hours are 9.30 to 15.30 p.m.) or on their website www.fingal.ie. The application may also be inspected online at the following website set up by the applicant: www.HolybanksLRDAmendment.com
We, Cairn Homes Properties Limited, intend to apply to Fingal County Council for a 7-year permission for a Large-Scale Residential Development at this c.13.57 ha (gross) site located within the Estuary West Lands at `Holybanks`, Swords, Co. Dublin. The main development site is bounded by Glen Ellan Road to the south, Jugback Lane/Terrace to the west, the former Celestica factory site to the east and the Broadmeadow River to the north. Junction and road improvement works are proposed to the Glen Ellan Road / Balheary Road junction and the R132 Dublin Road / R125 Seatown West Roundabout. The proposed development will consist of a residential scheme of 640 no. units (219 no. 1-bed units, 281 no. 2-bed units, 119 no. 3-bed units and 21 no. 4-bed units) along with childcare facility (c.537 sq.m in proposed Block 11). The development will include for the following: • 132 no. houses comprising: 08 no. 2-bed houses, 87 no. 3-bed houses, 16 no. 3-bed townhouses (back-to-back) and 21 no. 4-bed houses. These range in height from two to three storey and include semi-detached and terraced houses. • 474 no. apartment units (219 no. 1-bed units; 49 no. 2-bed, 3-person units; 206 no. 2-bed, 4-person units) provided within 11 no. apartment blocks ranging in height from up to 5 no. Storeys. • 34 no. duplex units arranged within 4 no. 2-storey blocks comprising 18 no. 2-bed units and 16 no. 3-bed units. • Apartments and duplexes are provided with balconies/terraces and with dedicated services /bicycle/ bin store areas. • Provision of 501 no. car parking spaces, 1,506 no. bicycle parking spaces and 26 no. motorbike parking spaces located at surface and undercroft level (adjoining Block 6); • Landscape proposals will include provision of c.42,651 sq.m (c.4.265 ha) of open space across the development including significant extension of the `Broadmeadow River Park` (c. 29,400 sq.m (c.2.94ha)). • Principal vehicular access to the site will be from Glen Ellan Road. New pedestrian connections will be provided from Jugback Lane/Terrace, Glen Ellan Road and the proposed Broadmeadow Riverside Park extension to the north of the site. A dedicated pedestrian/cycle path is also proposed through the site along a central spine open space, connecting Glen Ellan Road in the south with Broadmeadow Riverside Park extension in the north. • Junction and road improvement works are also proposed to the Glen Ellan Road / Balheary Road junction and the R132 Dublin Road /R125 Seatown West Roundabout to facilitate the development. This will include widening of Balheary Road, upgrade works to cycle/pedestrian facilities, partial signalisation of R132/R125 junction, and a new pedestrian crossing on Glen Ellan Road. • All associated site development works above and below ground including hard and soft landscaping, roads/footpaths/cycle paths, open spaces and play areas, boundary treatments, lighting, SuDs measures, pumping station, EV charging points, green roofs, ESB substations and all associated services to facilitate the development. • As part of the proposed development, temporary permission is also sought for signage. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) has been prepared in respect of the proposed development. Additional Information Received: 10/04/2025 SAI Received: 22/04/25
1/ Conversion of his attic to storage including a dormer window to the rear, 2 velux rooflights to the rear, a velux rooflight to the front and a window to the side gable wall all at roof level. 2/ A garden room/ office to his side garden.
1. Construction of 1,020 no. new residential dwellings on the Main Residential Development Site comprising: • 70 no. one-bed apartments (including 51 no. sheltered housing units), 64 no. two-bed apartments and 1 no. three-bed apartment arranged in 7 no. blocks. Apartment Blocks 1 to 6 range in height from 4 to 5 storeys and include balconies/terraces on all elevations. The Sheltered Housing Block is 3 storeys in height and has balconies/terraces on all elevations. • 30 no. two-bed and 9 no. three-bed, 2-storey apartments are proposed in terraced format throughout the scheme (Apartment M Type); • 63 no. one-bed apartments, 119 no. two bed apartments and 174 no. three-bed apartments are proposed, arranged in duplex and triplex format in terraces and corner blocks, ranging in height from 2 to 4 storeys; and • 38 no. two-bed houses, 300 no. three-bed houses, 141 no. four-bed houses and 11 no. five-bed houses (ranging in height from 2 to 3 storeys). 2. Provision of 2 no. childcare facilities (total GFA approximately 1,243 sqm) in stand-alone, 2 storey buildings, with capacity for in the order of 237 no. children. 3. Provision of 3 no. retail units (total GFA approximately 342 sq m), 2 no. café units (total GFA approximately 188 sqm), a community use unit (approximately 91 sqm) and a medical centre (approximately 200sqm GFA) at the proposed local centre area (located at ground floor level of Apartment Blocks 1, 2, 3 and 5). 4. A total of 902 no. car parking spaces are proposed (comprising 852 no. residential spaces; 11 no. childcare facility spaces (drop off only), 39 no. on-street visitor parking spaces (including 4 no. car-share spaces and 10 school drop off spaces), together with a total of 3,013 bicycle parking spaces (comprising 2,554 no. long stay spaces and 459 no. short stay spaces). 5. A series of public parks, open spaces, pocket parks and communal open spaces are proposed throughout the Main Residential Development Site. 6. Provision of the Corballis Nature Park (approximately 13.0ha) on lands to the south of the Donabate Distributor Road (DDR) to provide multifunctional natural amenity area including a cycle and pedestrian connection from the DDR to Corballis Cottages Road and Sustainable Drainage Systems (SuDS) features to serve the wider Corballis lands. 7. Vehicular access to the Main Development Site will be via two existing junctions from the DDR to the south and a new vehicular entrance to the north-east at New Road. The proposed development also provides for the extension of the existing footpath incorporating a cycleway by approximately 215m from The Strand to the proposed new entrance on New Road to the west, and 85 m of footpath incorporating 73 m of cycleway to the east of the new entrance on New Road, along the southern side of New Road, together with all associated works. 8. Modifications to Phase 1, permitted under FCC Reg. Ref. F20A/0204 (ABP-308446-20), to facilitate vehicular access to car parking associated with permitted Block 4 (34 no. units) via the proposed LRD Scheme together with all associated amendments to the Phase 1 layout, including minor reconfiguration of permitted Block 4 car parking spaces, and omission of vehicular access to Block 4 via the shared cycle street as originally permitted under FCC Reg. Ref. F20A/0204 (ABP-308446-20). Pedestrian and cycle connectivity will be facilitated between the proposed LRD Scheme and permitted Phase 1. 9. Proposed development facilitates future potential pedestrian, cycle and vehicular links to existing and proposed adjoining developments including a connection to the proposed Nature Park via an existing pedestrian crossing on the DDR, and the approved Broadmeadow Way proposal (ABP Ref. ABP-304624-19) (via the Nature Park). 10.All enabling and site development works, landscaping, boundary treatments, lighting, services and connections, including connection to permitted wastewater pumping station (FCC Reg. Ref. F19A/0472), omission/decommissioning of temporary pumping station and detention basin permitted under FCC Reg. Ref. F20A/0204 (ABP-308446-20), waste management, ESB substations, and all other ancillary works above and below ground on a site of approximately 41.9 ha. 11.A 10 year permission is sought. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal Development Plan 2023-2029 and the Donabate Local Area Plan 2016 (as extended). The Planning Application, including the EIAR and NIS, may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority (Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin) during its public opening hours. The application, including EIAR and NIS, may also be inspected online at the following website set up by the applicant: www.corballiseastlrd.ie AI Received 21/12/2023
A 1 storey extension to the front and side elevations of the property. Add Info received 26th August 2020. Clarification of Add Info received 2nd October 2020.
A side ground floor extension with flat roof and south facing pv panels; new flat roof will wrap around to the front & replace existing lean-to roof. It is proposed to raise existing rear boundary wall to 2.1m high and construct new awning, and all associated site works.