Planning records
Showing 1-50 of 33,491 public recordsConstruction of a new bus interchange to replace that existing at Red Cow Luas park and ride car park. The proposed works consist of the provision of 9 new sawtooth type bus bays, bus shelters, overhead canopies, a bicycle building, passenger and driver welfare facilities, and an electrical substation. A new carriageway arrangement for bus access and circulation including a reconfiguration of the western car park layout to allow for provision of taxi and drop off facilities is also proposed. The proposed works also include minor realignment of the park and ride access road between the mini roundabout entrance to the western car park and the mini roundabout entrance to the eastern car park. The existing Luas stop, depot building, surface parking facilities and bus interchange were originally granted permission under LRO 59 of 1999.
The construction of a ‘Build to Rent’ residential development comprising of 115 apartments (10 x studio units, 62 x 1-bed units, 38 x 2-bed units and 5 x 3-bed units) in 1 block, ranging in height from 2 storeys to 8 storeys over basement level with private balconies/terraces. The proposed development will also comprise of residential amenity facilities and services at ground floor level consisting of a gym, lounges, games room, conference room, meeting room, studio, concierge, bin store, and bike stores (140 spaces). A total of 48 car parking spaces at basement level with a drop-off/service lay by at ground level, 224 bicycle parking spaces across basement, ground floor and surface levels, landscaping including 1 communal roof terrace at 2nd floor level and a landscaped courtyard at ground floor level, public realm works including a new pedestrian path from the public open space at Monastery Gate to the north and along the southern site boundary with a pedestrian connection to Monastery Road to the south, public lighting, boundary treatments 2 no. ESB substations at ground floor level, plant at basement and roof levels and all associated site development and infrastructure works including foul and surface water drainage, necessary to facilitate the development. Vehicular access to the site is from Monastery Road (via the existing access road to the IBIS Hotel) with pedestrian access from Monastery Road and Monastery Gate. The development also provides for all associated site clearance works.
The removal of existing roof finish to the side (southern) extension granted under SD13B/0233 and replacement of same with standing seam engineered roof covering
Retention permission of change of use from light industrial to coffee shop/restaurant/takeaway with external seating area and associated signage, with internal modifications and associated site works.
Retention of 3 standalone coated steel prefabricated units comprising of 2 single storey prefabricated units (each c.31sq.m GFA) and associated entrance ramps used for canteen and welfare use respectively; 1 single storey prefabricated modular unit (c.199sq.m GFA) and associated entrance ramp used for office use; all site development works are proposed on a site of c.0.245ha.
Construction of single storey extension with flat roof to the rear of existing house; alterations to ground floor plan; roof light to the rear and all associated works.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
The proposed development will consist of an amalgamation of two existing units, including the making of internal connections between both units across the three floor levels, of replacement of the solid metal double doors at the rear of Unit 17 with a double glazed window, and of installation of two new self-illuminated signs, the first sign of approx. 2.09sqm on the West elevation 8.300m above ground and second sign of approx. 3.125sqm on the East elevation 3.260m above ground
A new single storey ground floor extension to front side & rear of property with pitched roof and new roof windows, comprising of a bedroom, toilet & utility room.
Conversion of existing attic space comprising of modifications of existing roof structure, gable window; new access stairs and flat roof dormer to the rear.
Erection of a new 2 storey extension to the side, with internal modifications and associated site works.
The construction of a new single storey extension to the rear of existing truck and van test centre which will include the erection of a raised parapet and external cladding and external signage to the elevations and for all ancillary site works at Murphy's Truck Centre, Turnpike Road, Ballymount, Dublin 22.
Provision of a dormer extension to the rear roof; 2 rooflights to the front roof and all associated site works.
First floor extension over existing ground floor welfare facilities including changes to the elevations; erection of new cladding to the front (north east) elevation and part of the side (north west) elevation including for all associated signage and for alterations to the roof line of the existing porch at the main reception area; erection of 6.65m high totem signage structure located adjacent to the Turnpike road and for a 2.25m high totem signage structure located adjacent to the main reception entrance and for the erection of 3 x 6m high flag poles along the Turnpike Road; and for all ancillary site works.
Replacement of signage on the premises front elevation.
Change of use of existing detached warehouse unit to vehicle service workshop including new internal works to from new staff canteen and toilet accommodation; new fire door exit doors; roller shutter door to existing elevations and attached illuminated building signage.
(i) Demolition of existing ancillary outbuildings and removal of front boundary treatment to Turnpike Road; (ii) alterations to existing single-storey cottage including demolition of existing front porch, partial demolition to the side/south of the original building, partial demolition of non-original rear extension and replacement of rear pitched roof with a flat roof; (iii) change of use of the cottage from residential to commercial use providing a reception area, coffee shop, multi-purpose studio, changing rooms and associated facilities; (iv) construction of 3 no. enclosed padel courts within 2 no. single-storey structures to the rear of existing cottage; (v) provision of 17 no. car parking spaces (including 1 no. accessible space), 15 no. bicycle parking spaces and refuse/storage facilities; (vi) provision of a new 6.0m wide vehicular entrance via Turnpike Road; and, (vii) all associated works, including new boundary treatments, landscaping, SuDS and drainage necessary to facilitate the development.'
Erection of a perimeter steel fence to match existing fence as erected on neighbouring property 2.5m high and the installation of a new electronically controlled entrance gate set back approx. 13m from road side 2.1m high.
A self-storage facility (for a temporary period of three years) comprising 40 no. 20 foot long shipping containers (14 sq.m. each)
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Change of use of the second floor of the subject building to a Dental Practice comprising of 2 surgery rooms, offices, waiting room/reception, sterilisation room and toilets and ancillary site works.
Attic conversion with projecting dormer window to rear roof and 2 no. velux windows to front roof, new study / storage facility, and all associated site works.
Planning Permission sought for proposed two storey pitched roof extension to side (floor area = 12.17sq.m) with a proposed ridge height of 6.935m high, complete with first floor bedroom window to side/N.West elevation & 2no. 'velux' roof lights to front/S.West elevation together with associated site works
Extension to rear.
Extension to rear.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Demolition of single storey detached shed to side and /rear and erection of a new 2 storey extension to side single storey extension to rear with internal modifications and associated site works.
Construction of a single storey flat roof and double pitch slope roof extension to the rear of existing dwelling; Internal & Elevational alterations to the existing house; New off-street parking; New landscaping, boundary fencing, drainage and associated site works
The installation of a 1.62m x 0.87m x 0.5m (HxWxD) gas pressure reduction unit and 3.25m (H) vent stack, with all ancillary services and associated site works.
Demolition of an existing single storey office building (total area of 647.62m2, 4.38m high) ancillary to the existing crane hire business with this area returning to yard area.
Install a second cremator within the existing crematorium building to be powered with electricity; the new unit will be located beside the existing unit within the building (the building was originally designed and built for 2 units); internal alterations to the building including removal of non-load bearing block walls to facilitate the new unit; extension to the west side of the building to provide staff changing facilities and a cremulator room (20.2sq.m); extract system to be connected to the existing flue; partial demolition of existing boundary wall to facilitate a new sub-station/switch room, the laying of underground ducts for ESB connection, underground cabling and all ancillary works to facilitate the development.
Replacement of existing asbestos roof covering with a new Kingspan insulated roof panels; replacement of rooflights with new and installation of a roof mounted solar photovoltaic panels to include all ancillary works and services.
Installation of a new canopy roof to the south side of the existing Heiton Steel warehouse and all associated site works.
Erect 775.46sq.m or 289.80 kWp of photovoltaic panels on the roof of storage building with all associated site works.
Semi-detached two storey private dwelling adjoining existing two storey family home with all ancillary works.
2 new signs at site entrance featuring company logo; 5 new signs on building facade featuring company logo and name; 2 Totem signs featuring company logo and opening times etc; all associated site works.
Retention permission for 2 storey extension to rear of existing house, proposal for a new window to side of existing house all with associated ancillary works
Side first floor extension for an additional bedroom; raise roof of single storey extension to the rear; two windows to the side of new first floor bedroom.
The relocation of the use of the existing apprentice joinery workshop training centre for young apprentices from its existing location on site to warehouse unit 2 involving the change of use from warehouse to apprentice joinery workshop training centre and all ancillary internal and external works including the extension of the first floor mezzanine of 747sq.m, minor modifications of the front entrance and provision of a canopy with integrated signage and provision of a waste wood store for recycling as fule for the boiler 29sq.m and dust containment at the rear, the overall GFA is 2,319sq.m; The use of the existing joinery workshop training centre will remain as a training centre for Sisk employees use and include general storage area at ground floor and minor internal and external works will be carried out comprising internally the extension of the first floor level mezzanine by 291sq.m from the existing mezzanine of 234sq.m to 525sq.m and externally the upgrading, cladding and improvements to fenestration of the external elevations, the overall GFA is 1346sq.m.
Retention permission is sought for: Part (104 sq.m gross) of the first floor currently in light industrial use at Unit 5-9: Enlargement of ground floor window at Unit 5-9 on the north elevation enlargement of first floor windows at Unit 5-9 on the south elevation. Planning permission is sought for: (i)The change of use of Unit 4 (of 292.5 sq.m), including that part at first floor (104 sq.m) for which retention permission is sought, from light industrial use to office based industry use and amalgamation of Unit 4 with Unit 5-9 (1,505 sq.m gross) to provide a single office based industry unit of 1,797.5 sq.m gross together with all associated and ancillary works, including internal fit-out. (ii) At the south elevation of Unit 4: a. At ground floor, existing door, external shutter box, all supports and electrics to be removed and to be replaced with a new glazed door unit, and existing roller shutter door and all supports/electrics to be removed and replaced with new window unit. b. At first floor, 2 no. new aluminium/glass windows. (iii) 4 no. bicycle parking spaces, including provision for cargo bike.
Erection of a 6000mm high totem style site sign for the Turnpike Business Park; the totem will be 1800mm wide x 250mm deep in plan, including lettering/numerals and illuminated elements to it's north and south sides and will be located at the east boundary of the site near the site entrance; associated works.
The development will consist of the change of use of the ground floor unit including mezzanine level from showroom with ancillary office use to office use (c 1,022 sq.m), together with all ancillary site services and site development works.
Ground floor rear extension with pitched roof over & 2 No roof lights over & ground floor extension with pitched roof over
Internal reconfiguration and first floor internal extension (98.36sqm) to the existing light industrial unit (total gross floor area of building increases from 1003.9sqm to 1102.26sqm) and change of use to accommodate warehousing / distribution, professional trade support and training services, showroom for display and sale of painting products, ancillary offices and all associated staff accommodation. Permission is sought for revisions to the existing parking and servicing / delivery areas within the site via existing vehicular entrances from Elm Road and Chestnut Road, minor changes to the southern elevation, new building mounted signage and all associated site and development works associated with the above.
Retention permission and permission for development at the existing shotblasting facility. The total planning application site area extends to approximately 0.92 Ha. Retention permission is sought for: a 2 bay portal frame structure at the northern end of the facility and a 153 sq.m floor area extension at the southern end of the facility. Permission is sought for: a 716 sq.m floor area extension at the southern end of the facility; roof to enclose the 2 bay portal frame structure (for which retention permission is sought) minor changes to the internal layout including relocation of toilet and provision of ancillary office space; concrete resurfacing of the main yard area; minor elevational changes; and all associated site and development works above and below ground.
Retention for 2 bay portal frame, additional floor area to existing industrial unit. Permission for roofing of 2 bay portal frame structure; extension to existing industrial unit; construction of a concrete resurfaced area in main yard; minor internal layout and elevational revisions to existing industrial unit and all associated site works including underground surface water attenuation and related utilities and works.
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
Construction of a 242 bedroom hotel in a building ranging in height from 7 to 10 storeys over ground and lower ground floor levels; the development will include the lower ground floor accommodating 202 car parking spaces; 54 bicycle parking spaces, plant, stores and ESB substation; ground floor accommodating hotel entrance and reception area; restaurant and bar; outdoor terrace and patio with canopies; function room; meeting rooms; kitchen, staff facilities; stores, toilets and plant; ground floor mezzanine accommodating meeting rooms; admin office; store and laundry facilities; 1st to 9th floor accommodating 242 hotel bedrooms including 17 suites; 10th floor accommodating gym/yoga studio; plant, storage and a roof terrace; vehicular access from both the N7 slip road and Knockmeenagh lane with link street across the site; upgrade works to Knockmeenagh lane; landscaping; boundary treatment; wastewater pumping station; associated signage and all site development works and services; the site is located between Knockmeenagh Lane to the north, St. Brigids cottages to the east, the Nass Road (N7) to the south and the Nass Road Business Park to the west.
Change of use of the existing building on site (comprising 763sq.m gross floor area) from office use to light industrial use (comprising the assembly of hampers and online orders at first floor area, digital device repair and refurbishment at second floor level with ancillary staff canteen and reception area at ground floor level); The development also includes the provision of a bicycle store (6 spaces) at ground I undercroft level, along with all ancillary works.
Amendment to previously permitted planning for change of use of part of existing industrial unit to motor showroom, Reg. SD19A/0199 (floor area of additional change of use 130sq.m).