The overall site includes a Protected Structure (Steward's Crafts - Record No. 020), Units 39-40, Hills Industrial Estates, Lower Lucan Road, Co. Dublin. The proposed development will consist of:- Change of use from gym to wholesale outlet and local shop;- Minor alterations to the elevations to facilitate the change of use;- The provision of car parking spaces, bicycle spaces and a loading bay for deliveries and;- All associated site development works.Decision record indexed
Change of use from furniture shop and window shop/showroom to a multi-functional space to include a place of worship and community centre (with ancillary office space);Minor internal alterations to layouts and alterations to the elevations to facilitate the change of use; The provision of car parking spaces and bicycle spaces and; All associated landscaping and site development works. The subject site includes a Protected Structure (Steward's Crafts - Record No. 020).Decision record indexed
Change of use of the existing light industrial/warehouse unit to a Chartered physiotherapist-led rehabilitation and gym facility. The proposed use will include one-to-one and small group physiotherapy-led rehabilitation and exercise services. No external alterations to the structure are proposed. All services will operate within the existing unit footprint and use existing parking and access arrangements.Decision record indexed
The proposal outlined in this application involves the placement of a temporary ice cream trailer/stand within the premises of 8A The Mall, Main Street, Lucan Village, Lucan, Co. Dublin, K78 P9T0. The trailer/ stand will be positioned in the outdoor area between the existing retail unit frontage and the boundary wall on Main Street, Lucan. It's important to note that the proposal doesn't entail any alterations, fixtures, or modifications to the existing site. Measuring 2.0m x 2.5m, the trailer or stand is intended to serve pre-made ingredients, all of which will be prepared off-site. This approach not only supports sustainability but also minimizes impact, enhancing the visual amenity of the space, by reducing waste, promoting eco-friendly practices, and offering a unique and delightful experience for the community. The proposed trailer I stand aims to contribute positively to the vibrant atmosphere of Lucan Village, providing a convenient and enjoyable option for passersby while adding to the overall charm of the local area.Decision record indexed
Refurbishment of existing two bed apartment at basement level; alteration of existing window opes to basement level; re-opening of the existing windows to the rear elevation of the retail unit at ground floor level; incorporation of a new toilet at ground floor level; reconstruction of existing stairs to first floor; removal of existing steel roller shutters from exterior of ground floor retail unit and re-incorporation of same to interior of retail unit; installation of 2 awnings at ground floor level; refurbishment of existing interior retail units; incorporation of a new door on the ground floor eastern elevation to give access to first floor and the incorporation of a new access steps to this door from the front; removal of all existing uPVC windows and their replacement with timber sash double glazed units; refurbishment of existing paved area to the south and all necessary upgrading, repair, refurbishment and site works necessary to facilitate the development. (Protected Structure)Decision record indexed
Construction of an extension to the side of existing building comprising a new two storey (plus partial basement) flat roof extension with new side entrance & stairs to access existing first floor & rear garden area with new wc at first floor. Retention of minor amendments to layout of basement apartment from previously permitted layout, Ref. SD20A/0231, for amended bathroom location; Retention & completion of internal alterations and change of use of ground floor from retail to restaurant use, to include alterations to layout from previously permitted layout ref. SD20A/0231 inc. removal of modern stairs and partitions & forming new WC facilities and servery area; Retention & completion of internal alterations and change of use of first floor from ancillary accommodation to office/shared work space use, to include alterations to layout from previously permitted layout Ref. SD20A/0231 inc. removal of walls & modern wc. Works also include retention & completion of all associated ancillary landscaping & boundary wall works to front area (Protected Structure).Decision record indexed
Ulster Bank, The Mall, Lower Main Street, Edmondsbury, Lucan, Co. Dublin
Shopfront alterations which comprise of fitting of new branded signage (after removal of existing signage/ or over existing signage) onto existing shopfront, replacement of existing ATM with new ATM (location retained); minor internal alterations to existing front banking hall to consist of new internal SSBM/ ATMs within new room.Decision record indexed
The development will consist of the material change of use from office/storage unit to a unit for day services use, to enable the provision of services to people with intellectual disabilities, the removal of the existing mezzanine floor, the removal of 4nr existing windows and infilling to match existing cladding to the front and rear elevations at first floor level, the installation of 3nr new window openings to the rear elevation at ground floor level the infilling of existing structural opening to the front elevation with glazing and spandrel panelling, while retaining the existing internal roller shutter unit, the repositioning and widening of the main entrance door and the installation of a full-height fixed glazed unit to the front elevation, installation of manifestation signage to the front elevation door and glazing, the widening and lowering of the existing rear exit door and all associated site works.Grounds not yet categorised
Unit 8, Hills Industrial Estate, Lucan, Co. Dublin
The development will consist of the material change of use from office/storage to a unit for day services use, to enable the provision of services to people with intellectual disabilities. The removal of the existing mezzanine floor and the removal of the existing roller shutter unit and installation of new windows to the front and rear elevation, (d) the widening of the existing doors to the front and rear elevation. Removal and infilling of existing windows at high level to the front and rear elevation with the installation of manifestation signage to the front window and (g) all associated site works.Grounds not yet categorised
Change of use of existing first floor from existing office space to residential use to provide 1 five bedroom apartment comprising of removal of 2 sections of existing wall to the rear of the development along with removal of 3 windows to the rear at first floor level only to allow for proposed new door opes for access to proposed balcony area; removal of internal partition walls and the modifications to existing rear roof to allow for dormer extension for attic conversion; associated site works, bin storage and signage.Decision record indexed
(a) the material change of use from an office to a unit for day services use, to enable the provision of services to people with intellectual disabilities, (b) the installation of external signage and (c) all associated site works.Decision record indexed
Change of use from a commercial office to a 1 bed ground floor apartment; Minor amendments to internal layout to first floor apartment; Configuration of existing first and second floor balconies as originally constructed, in existing three storey building.Decision record indexed
Re-design and re-location (due to presence of existing drains on site) of columbaria previously permitted under planning reference SD20A/0329 and all associated site works.Decision record indexed
St Andrews Church of Ireland, Main Street, Lucan, Co. Dublin
A Columbarium for the interment of ashes consists of 5 Columbaria of 15 double niche or equivalent single niche per side within a landscaped enclosure with fixed cross to east chancel at the southeast corner, of the curtilage of the property. The site is accessed from the church forecourt to the east and will include a free standing stone screen wall 1.8m high and from an existing inner courtyard to include a memorial threshold. Site clearance will include demolition of a stone built shed and the felling of 2 trees.Decision record indexed
Rooflight to the rear slope of existing roof; demolition of existing shed; two storey extension with flat roof and parapet to the rear; internal alterations; new garden shed and ancillary site works.Decision record indexed
The construction of a connecting passageway between the existing house and garage, the partial conversion of the existing garage, and the non-construction of parts of the design granted permission under planning Ref. SD02B/0490.Decision record indexed
Rear of J. Collins Butchers, Main Street, Lucan, Co. Dublin
3 storey 6 apartment unit, 1 semi-detached unit and 1 detached unit including car and bicycle parking facilities, bins and landscaping with new entrance gate.Grounds not yet categorised
The Development will consist of Demolition of the existing single storey extension to the rear. Construction of a part pitched part flat roof single storey to the rear including roof lights. Alterations to the windows openings to the rear 1st floors. All associated internal, site drainage, landscape and ancillary alterations.Decision record indexed
Part single-storey, part two-storey rear extension incorporating internal ground and first floor modifications. Front porch extension and widening of the existing vehicular entrance, plus all associated site works.Decision record indexed
Two storey, three bedroom end of terrace house to side of existing house including alterations to existing boundaries for creation of a new vehicular access gate; adjustments to existing vehicular access gate and associated site works.Decision record indexed
Block 3, Millbank Business Park, Lower Lucan Road, Lucan, Co. Dublin
Demolition of a one storey warehouse building (c.1,051.2sq.m) and site boundary wall and the construction of 11 three storey residential units; 11 three bed units ranging in size from c. 105.9 - 112.2sq.m all with associated private back gardens, balconies and terrace areas; vehicular and pedestrian access is proposed off the Lower Lucan Road via two entrance points; 17 car parking spaces (including 1 disabled); sheltered bicycle storage and bin storage at surface level; a central public open space area of c. 282sq.m with all boundary treatment and landscaping works as well as all associated site development works on an overall site of c. 0.242Ha.Decision record indexed
Installation of a new external ATM and illuminated surround panel adjacent to existing ATM, replacement of existing ATM surround panel with new illuminated surround panel and all associated site works.Decision record indexed
Change of use from first floor office to single apartment unit; relocation of front door of retail unit on ground floor; new front door for apartment access; ground floor extension to barbers shop to allow for toilet facility and store to the rear; additional floor space to the front and apartment balcony at first floor level and all associated site works.Decision record indexed