to
to

Planning records

Showing 1-1 of 1 public records
PreviousPage 1 of 1Next
D20A/0028

Permission for development. The proposed development relates to the provision of an academic building (the Centre for Creativity - c. 13,184sqm Gross Floor Area including basement) and all associated elements as part of the Future Campus Phase 1 proposals. The general height of the proposed building ranges from c.18.6 m up to overall height of c.48.88m (up to the highest of the proposed tower elements). The Centre for Creativity includes the provision of a study centre, a lecture theatre, workshop/studio/classroom facilities, ancillary exhibition spaces and all associated ancillary areas/facilities. The proposed development will consist of: Level 0 - Educational facilities including - forum (foyer/reception), study centre, UCD experience area, equipment room and demonstration spaces, workshops, studios/maker space areas, retail area, café and all associated ancillary areas/facilities. Level 1 - (including mezzanine areas) - Educational facilities including study centre, UCD experience areas, creative teaching spaces, offices and all ancillary support facilities. At mezzanine level - Educational facilities including study centre, workspaces, offices and all associated ancillary areas/facilities. Level 2 - Educational facilities including a lecture theatre, UCD experience area, studios/classrooms/study areas and all associated ancillary areas/facilities. Level 3 - Educational facilities including studio/classroom/study areas, UCD experience areas and all associated ancillary areas/facilities. Level 4 - Educational facilities including UCD experience area, creative teaching spaces, studios and all associated ancillary areas, facilities. Level 5,6 and 7 - Educational facilities including UCD Experience areas and all associated ancillary areas/facilities (including an observation areas at Level 7). At basement Level - Associated ancillary plant facilities, storage and ancillary areas/facilities, storage and ancillary areas/facilities. At roof level over part of level 2 and level 4- provision of a sedum roof (with a combined area c. 1184 sqm) and Photo Voltaic panels (with a combined area c. 230 sqm) and paved terrace (c. 270 sqm), associated plant, roof lights and roof access. The proposals also provides for associated landscaping including a stepped reflective pool (located at part of the south-west, north-west and north east elevations of the proposed Centre for Creativity) fronting the new campus Arrival Plaza (part of a separate planning application). an external south-facing courtyard forming part of the new Ardmore Quad (part of a separate planning application), an external service area, an external workshop terrace area at ground floor level, external storage facilities (c.91 sqm) and all site services and associated site development works. There are no works proposed to the existing Protected Structures within the University College Dublin Campus as part of this planning application.

On a site of C. 0.72 University College Dublin Campus, Belfield, Dublin 4 (the overall campus includes Protected Structures)Dun Laoghaire Rathdown County CouncilPermission0 reasons26 conditions
Granted17 June 2020
Showing 1-1 of 1
PreviousPage 1 of 1Next