Showing 1-3 of 3 public recordsNew primary school (Roll No. 20549P), including 20 classrooms, with a gross floor area of 3,449 sq.m over 3 storeys; The proposed development will also provide a no. multi-purpose hall and all ancillary teacher and pupil facilities; Vehicular, cycle, and pedestrian access to the site is proposed to the north-west of the school, with staff and visitor parking spaces; car and bus drop off and set down facilities and associated set down areas and accessible parking facilities; A secondary, future provision of pedestrian, vehicular and cycle access points are provided to the southern boundary of the site; The development will also include the provision of bicycle and scooter parking; external stores; Internal access roads, cycle and footpaths; hard and soft play areas including 2 ballcourts; piped infrastructure, connections and ducting; external plant area; landscaping and boundary treatments; green roofs, PV panels; 1 ESB substation; EV parking facilities; external courtyards and all hard and soft landscaping; ancillary ramps and stairs; lighting; signage; 3 attenuation tank; SUDs; 3 flagpoles; changes in level and all associated site development and excavation works above and below ground.
Modifications to rear of an existing two-storey, detached house (Protected Structure Ref. 323) which adjoins the Scout Ireland Hall also a Protected Structure Ref.324; re-instatement of fire-damaged internal linings as per Conservation Report; insert a rear window to ground floor of the existing house; demolish single storey extensions and separate outhouse (22sq.m); construct new slated two-storey & single storey flat roofed extension (70sq.m) to rear to contain a kitchen/dining, 2 bathrooms, stairs and 1 bedroom; modify existing entrance piers and re-construction of missing pier to 2m height with timber gate and ancillary site works.
(1) Phased demolition of existing school buildings (a) Block 1: single storey main school building 3,720sq.m (b) Block 2: two storey PE hall 771sq.m (c) Block 3: single storey temporary classroom 400sq.m (d) Block 4: single storey temporary classroom 1155sq.m. (2) Phased construction of a new part three, part two and part single storey school building (10,429sq.m). (3) The refurbishment of the existing vehicular entrance and the provision of a new pedestrian entrance off Kilteel Road and the provision of a new vehicular entrance (emergency and service vehicles) off St. Anne's Terrace. (4) The provision of 97 car parking spaces. (5) The provision of a new ESB substation to the south east of the site with access off St. Anne's Terrace. (6) Associated ancillary site works including new landscaping and hardplay areas.