Planning records
Showing 1-5 of 5 public recordsPembroke Beach DAC intends to apply for permission for development for a 228 No. bedroom Hotel development (referred to as Phase 2B) (including a café, licenced bar / restaurant, business centre and ancillary elements) on this site of 15.06ha including lands known as the former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily on a net site area of 0.211ha (identified as within the 'A1 Lands') in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019) (as amended). The overall site is bounded to the: north-west by Sean Moore Road; north-east by South Bank Road; south-east by Dublin Port lands and Dublin Bay; and south-west by Sean Moore Park. The overall site subsumes the 4.3ha site of the 'Infrastructure Permission' (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year Permission) on 28 January 2020, permitting streets, transportation, water services and utilities' infrastructure; public realm and public amenity spaces (including the Village Green and Dog Park); and temporary landscaping of a school site, to facilitate Phase 1 development as provided for under the Poolbeg West SDZ Planning Scheme (2019) (as amended) as approved by An Bord Pleanála. The proposed Phase 2B Hotel Scheme development will consist of: • Construction of a 228 No. bedroom Hotel development ('Block Q') (10,593 sq m GFA (excluding basement)) comprising a 20 No. storey landmark tower (with set-back storey at Sixteenth Floor Level 16) over two levels of basement (2,054 sq m), to provide: Hotel and ancillary uses, café, licenced bar / restaurant and ancillary spaces, business centre; and ancillary back-of-house facilities / spaces (including ESB Substation and associated ancillary rooms, bin store, laundry store, staff changing rooms, staff canteen, staff office and sprinkler tank and associated spaces). • Provision of 8 No. car parking spaces (including 1 No. accessible car parking spaces) and 1 No. service vehicle delivery bay at Basement Level -01, provision of 24 No. secure long-stay bicycle parking spaces for staff at Basement Level -01, and provision of 16 No. new short-stay bicycle parking spaces at surface level for visitors and provision of 1 No. new cargo bicycle parking space at surface level to service the proposed Hotel. • Amendment of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24): • In those external landscaped areas at Ground Floor Level in the immediate curtilage of the proposed Phase 2B Hotel Scheme site (including 'Gabbard Street' and 'South Bank Link Street') (within the focused site area) to facilitate amendments to permitted layouts, including the omission of 1 No. permitted EV-charging car parking space, the relocation of 1 No. accessible car parking space and 1 No. EV-charging car parking space, the relocation of 20 No. permitted short-stay bicycle parking spaces; provision of 1 No. new loading / pick-up/drop-off bay; addition of an access point on South Bank Link Street for proposed ESB substation, materials, urban tree locations and landscaping; • At substructure level to facilitate connections for vehicular movements, pedestrian movements and services between the permitted and proposed substructures. Accessing and servicing of the proposed Phase 2B Hotel Scheme development will be by way of 'Gabbard Street' (previously permitted under the Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24) and the Phase A Commercial Scheme (Reg. Ref. PWSDZ3798/24) and also by the permitted vehicular ramp on 'Ouzel Street' to / from the basement of the permitted Phase 2 Residential Scheme (Reg. Ref. PWSDZ3700/24). This Application will be accompanied by a Natura Impact Statement (NIS).
PERMISSION (i) construction of 1 no. two-storey three-bedroom flat-roofed, with 1 no. rooflight, detached residential dwelling with front/rear garden areas and served by 2 no. pedestrian entrances, via Pembroke Park and Orchard Lane, within the rear garden of No. 20 Pembroke Park; and, (ii) all ancillary works, inclusive of the provision of a bicycle shed, landscaping, boundary treatments and SuDS drainage as necessary to facilitate the proposed development.
Permission for development consisting of: (i) construction of 1 no. two-storey three-bedroom flat-roofed, with 1 no. rooflight, detached residential dwelling with front/rear garden areas and served by 2 no. pedestrian entrances, via Pembroke Park and Orchard Lane, within the rear garden of No. 20 Pembroke Park; and, (ii) all ancillary works, inclusive of the provision of a bicycle shed, landscaping, boundary treatments and SuDS drainage as necessary to facilitate the proposed development.
Pembroke Beach DAC intends to apply for permission for development for a mixed used development (referred to as Phase 2) on this site of 15.06 hectares including lands known as the Former Irish Glass bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily on a net site area of 1.99 hectares (identified as within the A1 Lands) in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The proposed Phase 2 development will consist of: amendment to permission Register Reference PWSDZ3270/19 and PWSDZ3207/21 in those areas where the net site of 1.99 hectares overlaps with the boundaries to the earlier permitted developments (including amendment to the urban tree plant along the Sean Moore Road interface & minor amendment to permitted public realm at the junction between Central Boulevard and South Bank Link Road) and the construction of a residential and mixed use scheme comprising an above ground gross floor area (GFA) of C. 48,648 sq.m., together with a basement/undercroft area of c. 10,654 sq.m., comprising 5 no. blocks (identified as blocks D1, D2, E1, E2, E2A) to provide: 502 no. apartment units and associated residential amenity facilities; a childcare facility; 3 no. Retail/ Food & Beverage units; 3 no. Retail Units, 2 no. Food/ beverage units; Health Facility; basement carparking; together with associated infrastructural works on the overall site. The proposed development will also include provision of the South Bank Link Road as identified in the SDZ Planning Scheme. Access and servicing of the proposed Phase 2 development will be by way of the central boulevard as permitted (subject to compliance with Condition No. 24e) in the Phase 1 planning permission (PWSDZ3207/21) which also amends the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) amongst other things. An additional access for emergency vehicles only with retractable bollards will be provided at the junction of Bloom Street and Sean Moore Road. The proposed Phase 2 development will consist of: -5 no. Blocks (D1, D2, E1, E2, E2A) ranging in height between 6 and 7 storeys with 8 storey setback over basement/undercroft to provide 502 no. apartment units (with balconies/terraces to be provided on all elevations at all levels for each residential block), consisting of: 216 no. 1-bedroom units; 245 no. 2-bedroom units and 41 no. 3-bedroom units (for the avoidance of doubt, Section 11.5.1 of the Planning Scheme clarifies the description of 'height' in Figure 11.3 to be taken from the constructed ground floor level; references to 'basement' and 'undercroft', respectively, are interchangeable given the changes in level across the site); -The provision of c.740 sq.m. of residential amenity facilities within Block E1 (to include a tenant reception of with admin support spaces, shared work space, Residents Lounge, Events space, Library/ Film Room, Dining Kitchen & meeting room) -A childcare facility (c. 412 sq.m) located at the ground floor of block D1 providing c. 92 no. childcare places and an outdoor play area of c. 199 sq.m; -A health centre at ground floor of Block D1 (c. 202 sq.m.); -3 no. retail/food and beverages spaces & 1 no. retail spaces located at the ground floor of Blocks D1, D2 (total GFA c. 1,153 sq. m); -2 no. retail spaces and 2 no. food and beverage spaces located at the ground floor of Blocks E1, E2, E2A (total GFA c. 1,249 sq. m); - A total of 139 no. car parking spaces; 121 car parking spaces located at basement level (incl. 7 no. accessible spaces (2 of which are accessible/EV spaces) & 21 no EV spaces, 8 no. car share parking spaces (2 of which are car share/EV spaces), 4 no. crèche parking spaces, 4 no. heath centre parking space & 4 no. retail parking spaces located at basement level with vehicular access from the street level (Block D1/D2 south eastern elevation); the provision of 18 no. on street car parking spaces (incl. 5 no. EV on-street car parking spaces and 7 no. accessible spaces) and 5 no. loading bays. (Note that 6 no. surface car parking spaces along South Bank Link Road will not be accessible until vehicular access from South Bank Road is provided at a future date); -Provision of 906 no. bicycle parking spaces; 816 no. long stay stand bicycle parking spaces located at basement level (incl. 6 no. crèche, 24 no. retail, 20. no. cargo spaces and 28 no. e-bike spaces); 90 no. short-stay standard bicycle parking spaces located at surface level (70 no. residential (incl. 10 no. cargo bike spaces), 20 no. non-residential); -Plant rooms, resident storage spaces, bin stores, bicycle stores, water storage, sprinkler rooms. laundry located at basement level; -Landscaped open spaces to comprise residential communal courtyards incl. children's play areas (Block D1/D2 c. 815 sq. m & Blocks E1/E2 c.992 sq.m.); amenity terraces at 8th storey level on Blocks D1/D2 (totalling c. 900 sq.m.); amenity terraces at 8th storey level on Blocks E1/E2/E2A (totalling c. 1,798 sq.m); -2 no ESB sub stations located at the ground floor level of blocks D1/D2 (totally c.48 sq.m) and 4 no. ESB sub stations located at the ground floor level of blocks E1/E2/E2A (totalling c. 42 sq. m); -3 no. LV switch rooms located at ground floor level of Blocks D1/D2 (c. 66 sq.m) and 4 no. LV switch rooms at ground floor level of blocks E1/E2/E2A (totalling c. 57 sq.m); -Communal commercial bin stores located at ground floor of Block D2 (c. 40 sq. m) and at ground floor level of Block E2 (c. 30 sq.m); -Bin store and health waste bin store located at ground floor of Block D1 associated with the proposed health centre; -Ancillary storage spaces located at round floor of blocks D2, E2; -Provision of public realm spaces including a portion of Glass Bottle Square, streets and public amenity spaces; -One new local /side street (Market Street) connecting to the permitted Central Boulevard; -The provision of the South Bank Link Road as identified in the SDZ Planning Scheme. Note that the proposed South Bank Link Road will include temporary bollards and fencing to restrict access until such time that a future connection/tie into South Bank Road is proposed and delivered. The proposed development will include hard and soft landscaping, pedestrian and cycle links, boundary treatments, tree planting, interim site hoarding, public lighting, green/blue roofs, commercial and residential waste & recycling facilities, piped site wide services and all ancillary works and services necessary to facilitate construction and operation. This application will be accompanied by an Environmental Impact Assessment Repot (EIAR) and a Natura Impact Statement (NIS).
Permission for development for a mixed use development (Referred to as Phase 2) on this site of 15.06 hectares including lands known as the Former Irish Glass Bottle & Fabrizia Sites, Poolbeg West, Dublin 4, focused primarily on a net site area of 2.10 hectares (identified as within the A1 Lands) in the Poolbeg West Strategic Development Zone (SDZ) Planning Scheme (April 2019). The overall site is bounded to the north-west by Sean Moore Road, to the north-east by South Bank Road, to the south-east by Dublin Port lands and Dublin Bay, and to the south-west by Sean Moore Park. The overall site subsumes the 4.3 hectares site of the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) for which Dublin City Council issued a Notification of Final Decision (10-year permission) on 28 January 2020, permitting: streets, transportation, water services and utilities infrastructure; public realm and public amenity spaces; and temporary landscaping of a school site, to facilitate Phase I development as provided for under the approved Poolbeg West SDZ Planning Scheme. The overall site also includes a recently issued planning permission (Phase 1) (PWSDZ3207/21) which relates to the development on a site area of some 4.46 hectares and proposes 570 No. apartments within a mixed-use development (53,032 sq m), as well as the Multi-Modal Transport Hub (232 sq m) and the Meanwhile Use 'Cultural Hub' (1,364 sq m). The Phase I Permission is located directly adjacent to the proposed Phase 2 development (opposite side of Central Boulevard) within the overall site. The overall site is also the subject of an application for planning permission (Phase IB) (PWSDZ3406/22) which relates to the development on a site area of some 0.76 hectares and proposes 356 No. apartments and residential amenities within a mixed-use development (43,944 sq m) comprising I No. block (identified as Block L). The Phase 1B application for planning permission is located directly adjacent to the proposed Phase 2 development (opposite side of Central Boulevard) within the overall site. The proposed Phase 2 development will consist of: amendment to Permission Register Reference PWSDZ3270/19 in those areas where the net site of 2.10 hectares overlaps with the boundaries of the earlier 4.3 hectare infrastructure permission (including amendment to the urban tree planting along the Sean Moore Road interface); and the construction of a residential and mixed-use scheme comprising a floor area of 64,906 sq m (54,682 sq m above basement), together with a basement/undercroft area of 10,224 sq m, comprising 2 No. blocks (identified as Block D and E) to provide: 516 No. apartment units and associated residential amenity facilities; a childcare facility: 5 no. café restaurant units; 2 no. Retail Services; 14 no. Retail Units; 1 no. Foodhall, 1 no. Health Facility: basement car parking; together with associated infrastructural works on the overall site. The proposed development will also include provision of the South Bank Link Road as identified in the SDZ Planning Scheme. The 516 No. apartment units will include 143 No. "Build-To-Rent" apartments (including resident support facilities and resident services and amenities), 52 No. social housing apartments, 77 No. affordable housing apartments and 244 No. apartment units. (The social and affordable housing is provided in accordance with Objective H7 of the Planning Scheme.) Access and servicing of the proposed Phase 2 development will be by way of the central boulevard as permitted (subject to compliance with Condition No. 24e) in the Phase 1 planning permission (PWSDZ3207/21) which also amends the infrastructure permission (Parent Permission) (Reg. Ref. PWSDZ3270/19) amongst other things. The proposed Phase 2 development will consist of: Blocks D and E ranging in height from 4 - 10 storeys over basement/undercroft to provide 516 No. apartment units (with balconies/terraces to be provided on all elevations at all levels for each residential block), consisting of: 180 No. 1-bedroom units; 252 No. 2-bedroom units; and 84 No. 3 bedroom units (for the avoidance of doubt, Section 11.5.1 of the Planning Scheme clarifies the description of "height" in Figure 11.3 to be taken from the constructed ground floor level; references to 'basement' and 'undercroft', respectively, are interchangeable given the changes in level across the site); the provision of 1,404 sq m of residential amenity facilities (to include a gym, co-work space, meeting room & other private amenities) a childcare facility (453 sq. m) located at the ground floor of Block D providing c.90 No. childcare places, and an outdoor play area of c.200sq m; 17 No. retail spaces (Retail Units, Retail Services & Foodhall) located at the ground floor of Blocks D & E (Total GFA 2,172 sq m) 5 no. café / restaurants located at ground floor level (Total GFA 722 sq m); A total of 103 no. residential car parking spaces (incl. 5 no. disabled access spaces & 21 no. EV spaces), 8 No. car share parking spaces, 4no. crèche parking spaces, 1 no. health centre parking space & 6 no. retail parking spaces located at basement level with vehicular access from the street level (Block D south eastern elevation), the provision of 20 no. on-street car parking spaces (incl. 6 No. EV on-street car parking spaces and 6 no. disabled access spaces) and 5 no. loading bays. Note 5 No. of the proposed on-street car parking spaces will not be accessible until such time that a future connection/tie into Southbank Road is proposed and delivered; Provision of 942 No. bicycle parking spaces; 852 No. long-stay standard bicycle parking spaces located at basement level (Incl. 5 no. crèche, 28 no. retail, 3 no. healthcare and 16 No. cargo bicycle parking spaces); 90 no. short-stay standard bicycle parking spaces located at surface level (70 no. residential [incl10 no. cargo bike spaces], 10 no. additional spaces and 10 no. crèche); plant rooms, resident storage spaces, bin stores, bicycle stores, water storage, sprinkler rooms, laundry located at basement level; landscaped open spaces to comprise residential communal courtyards (incl. children's play areas), and 4,401 sq. m of roof terraces to Block D (5th, 6th, 7th and 8th Floor), Block E (5th, 6th and 8th Floor); 1 no. double ESB sub station located at the ground floor level of Block D (76 sqm) and 1 no double ESB sub station located at the ground floor level of Block E (57 sqm); Provision of public realm spaces including 2 no. public squares (Glass Bottle Square and Pembroke square, totalling 1.820 sq m). streets and public amenity spaces; One new local/side street (Market Street) connecting to the permitted Central Boulevard; and the provision of the South Bank Link Road as identified in the SDZ Planning Scheme. Note that the proposed South Bank Link Road will include temporary bollards and fencing to partially restrict access to pedestrians only until such time that a future connection/tie into Southbank Road is proposed and delivered. The proposed development will include hard and soft landscaping, pedestrian and cycle links, boundary treatments, tree planting, interim site hoarding, public lighting, green roofs, commercial and residential waste & recycling facilities, piped site wide services and all ancillary works and services necessary to facilitate construction and operation. This application will be accompanied by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS).