Showing 1-50 of 33,405 public recordsThe removal of existing roof finish to the side (southern) extension granted under SD13B/0233 and replacement of same with standing seam engineered roof covering
The construction of a ‘Build to Rent’ residential development comprising of 115 apartments (10 x studio units, 62 x 1-bed units, 38 x 2-bed units and 5 x 3-bed units) in 1 block, ranging in height from 2 storeys to 8 storeys over basement level with private balconies/terraces. The proposed development will also comprise of residential amenity facilities and services at ground floor level consisting of a gym, lounges, games room, conference room, meeting room, studio, concierge, bin store, and bike stores (140 spaces). A total of 48 car parking spaces at basement level with a drop-off/service lay by at ground level, 224 bicycle parking spaces across basement, ground floor and surface levels, landscaping including 1 communal roof terrace at 2nd floor level and a landscaped courtyard at ground floor level, public realm works including a new pedestrian path from the public open space at Monastery Gate to the north and along the southern site boundary with a pedestrian connection to Monastery Road to the south, public lighting, boundary treatments 2 no. ESB substations at ground floor level, plant at basement and roof levels and all associated site development and infrastructure works including foul and surface water drainage, necessary to facilitate the development. Vehicular access to the site is from Monastery Road (via the existing access road to the IBIS Hotel) with pedestrian access from Monastery Road and Monastery Gate. The development also provides for all associated site clearance works.
Retention permission of change of use from light industrial to coffee shop/restaurant/takeaway with external seating area and associated signage, with internal modifications and associated site works.
Construction of single storey extension with flat roof to the rear of existing house; alterations to ground floor plan; roof light to the rear and all associated works.
A new single storey ground floor extension to front side & rear of property with pitched roof and new roof windows, comprising of a bedroom, toilet & utility room.
Erection of a new 2 storey extension to the side, with internal modifications and associated site works.
Provision of a dormer extension to the rear roof; 2 rooflights to the front roof and all associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Attic conversion with projecting dormer window to rear roof and 2 no. velux windows to front roof, new study / storage facility, and all associated site works.
Conversion of existing attic space comprising of modifications of existing roof structure, gable window; new access stairs and flat roof dormer to the rear.
Construction of a new bus interchange to replace that existing at Red Cow Luas park and ride car park. The proposed works consist of the provision of 9 new sawtooth type bus bays, bus shelters, overhead canopies, a bicycle building, passenger and driver welfare facilities, and an electrical substation. A new carriageway arrangement for bus access and circulation including a reconfiguration of the western car park layout to allow for provision of taxi and drop off facilities is also proposed. The proposed works also include minor realignment of the park and ride access road between the mini roundabout entrance to the western car park and the mini roundabout entrance to the eastern car park. The existing Luas stop, depot building, surface parking facilities and bus interchange were originally granted permission under LRO 59 of 1999.
Planning Permission sought for proposed two storey pitched roof extension to side (floor area = 12.17sq.m) with a proposed ridge height of 6.935m high, complete with first floor bedroom window to side/N.West elevation & 2no. 'velux' roof lights to front/S.West elevation together with associated site works
Erection of a perimeter steel fence to match existing fence as erected on neighbouring property 2.5m high and the installation of a new electronically controlled entrance gate set back approx. 13m from road side 2.1m high.
A self-storage facility (for a temporary period of three years) comprising 40 no. 20 foot long shipping containers (14 sq.m. each)
Construction of a single storey flat roof and double pitch slope roof extension to the rear of existing dwelling; Internal & Elevational alterations to the existing house; New off-street parking; New landscaping, boundary fencing, drainage and associated site works
The proposed development will consist of an amalgamation of two existing units, including the making of internal connections between both units across the three floor levels, of replacement of the solid metal double doors at the rear of Unit 17 with a double glazed window, and of installation of two new self-illuminated signs, the first sign of approx. 2.09sqm on the West elevation 8.300m above ground and second sign of approx. 3.125sqm on the East elevation 3.260m above ground
Semi-detached two storey private dwelling adjoining existing two storey family home with all ancillary works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Demolition of single storey detached shed to side and /rear and erection of a new 2 storey extension to side single storey extension to rear with internal modifications and associated site works.
Retention permission for 2 storey extension to rear of existing house, proposal for a new window to side of existing house all with associated ancillary works
Replacement of signage on the premises front elevation.
Retention of 3 standalone coated steel prefabricated units comprising of 2 single storey prefabricated units (each c.31sq.m GFA) and associated entrance ramps used for canteen and welfare use respectively; 1 single storey prefabricated modular unit (c.199sq.m GFA) and associated entrance ramp used for office use; all site development works are proposed on a site of c.0.245ha.
Side first floor extension for an additional bedroom; raise roof of single storey extension to the rear; two windows to the side of new first floor bedroom.
Ground floor rear extension with pitched roof over & 2 No roof lights over & ground floor extension with pitched roof over
Conversion of existing attic space comprising of modification of existing roof structure; new access stairs and flat roof dormer to the rear.
1) Demolition of existing single story lean-to-roof extension to rear. 2) New single storey flat roof extension to the rear. 3) New dormers to the front and rear of attic. 4) All associated site and auxiliary works.
The construction of a single storey building to be used for Physiotherapy. Access/egress from the proposed development is via the existing club entrance on Monastery Road, Clondalkin, Dublin 22.
Replacement of existing asbestos roof covering with a new Kingspan insulated roof panels; replacement of rooflights with new and installation of a roof mounted solar photovoltaic panels to include all ancillary works and services.
Planning Permission sought for: Change of use of part first floor from function room to aparthotel and construction of 2 new floors over first floor complete (at second and third floor levels) to provide aparthotel and ancillary accommodation. The total no of aparthotel rooms provided is 22. Existing roof over first floor to be removed complete to facilitate this development. Other works include: (1) Reduction in size of Ground Floor Lounge floor area to provide new separate stairs and lift to serve the aparthotel rooms on the first, new second and new third floors. External entrance doors to the stairs / lift area are the previous entrance doors to the Lounge area. (2) Internal alterations at ground and first floor levels to facilitate this development. (3) Roof garden accessed via the new stairs and lift. (4) Alterations to the existing building elevations finishes and (5) Connection to all services and all ancillary site development works to facilitate this development.
Retention sought for the removal of the ground floor internal courtyard with canopy over as per Planning Ref SD013A/0047; Works to include, external canopy above roof level removed, new storage room created at first floor level; ground floor area incorporated into lounge area; permission for reduction in size of lounge floor area; works to include new entrance doors to Lounge area within building elevation facing car park; new external fire exit door from Lounge area to open space to rear of the building; internal walls forming snug demolished complete;Floor area included within lounge area; kitchen extension within part of previous Lounge area; relocation of Off Licence into previous Lounge area; entrance doors to Off Licence are previous entrance doors to lounge area; works to include new window to Off Licence within building elevation facing car park; change of use of previous Off Licence to takeaway; internal layout changes to lounge area public toilets; remove internal doors between Lounge area and entrance.
Construction of a 242 bedroom hotel in a building ranging in height from 7 to 10 storeys over ground and lower ground floor levels; the development will include the lower ground floor accommodating 202 car parking spaces; 54 bicycle parking spaces, plant, stores and ESB substation; ground floor accommodating hotel entrance and reception area; restaurant and bar; outdoor terrace and patio with canopies; function room; meeting rooms; kitchen, staff facilities; stores, toilets and plant; ground floor mezzanine accommodating meeting rooms; admin office; store and laundry facilities; 1st to 9th floor accommodating 242 hotel bedrooms including 17 suites; 10th floor accommodating gym/yoga studio; plant, storage and a roof terrace; vehicular access from both the N7 slip road and Knockmeenagh lane with link street across the site; upgrade works to Knockmeenagh lane; landscaping; boundary treatment; wastewater pumping station; associated signage and all site development works and services; the site is located between Knockmeenagh Lane to the north, St. Brigids cottages to the east, the Nass Road (N7) to the south and the Nass Road Business Park to the west.
Installation of a new canopy roof to the south side of the existing Heiton Steel warehouse and all associated site works.
Garden shed with a canopy to be used for sunroom, gym area and storage.
The removal of the original lean-to porch roof & the addition of a single storey flat roof extension of c. 9 sq.m to the front (South) of the property. All internal & elevation alterations with 3 associated roof lights. The development will also include for the alteration of the original pedestrian access to the side (West) boundary & all associated site development & ancillary works.
(i) A Single-storey extension to the existing kitchen annex and (ii) A flat roof attic dormer extension. All works are to the rear of the house.
Removal of Condition No's 2 and 6 of Reg. Ref. SD18A/0289: operational times of the weight and fitness training building to be from 06.00 hours to 22.00 hours Monday to Friday and 8.00 hours to 21.30 hours Saturday and Sunday.
Demolition of existing 3.3sq.m rear kitchen lean-too and construction of new 12sq.m ground floor extension with flat roof; construction of new 4.1sq.m first floor rear extension with pitched roof; internal alterations.
Install a second cremator within the existing crematorium building to be powered with electricity; the new unit will be located beside the existing unit within the building (the building was originally designed and built for 2 units); internal alterations to the building including removal of non-load bearing block walls to facilitate the new unit; extension to the west side of the building to provide staff changing facilities and a cremulator room (20.2sq.m); extract system to be connected to the existing flue; partial demolition of existing boundary wall to facilitate a new sub-station/switch room, the laying of underground ducts for ESB connection, underground cabling and all ancillary works to facilitate the development.
The construction of a new single storey extension to the rear of existing truck and van test centre which will include the erection of a raised parapet and external cladding and external signage to the elevations and for all ancillary site works at Murphy's Truck Centre, Turnpike Road, Ballymount, Dublin 22.
First floor extension over existing ground floor welfare facilities including changes to the elevations; erection of new cladding to the front (north east) elevation and part of the side (north west) elevation including for all associated signage and for alterations to the roof line of the existing porch at the main reception area; erection of 6.65m high totem signage structure located adjacent to the Turnpike road and for a 2.25m high totem signage structure located adjacent to the main reception entrance and for the erection of 3 x 6m high flag poles along the Turnpike Road; and for all ancillary site works.
Demolition of the single-storey flat-roof extension and front wall with gate to the side of existing dwelling. Construction of a new two storey, three-bedroom pitched-roof dwelling with shared vehicular access and off-street parking from Monastery Drive, connection to public services, and all associated site development works.
The development consists of a first-floor extension to the side, a dormer roof and roof light to the front, a ground-floor extension to the rear, reconfiguration of ground and first floor plan layouts, a dormer roof to the rear, and all ancillary works necessary to facilitate the development.
Increased width drop kerb at the edge of the public road, in front of the house, for additional vehicular access to the off-road parking area in the front garden of the house.
(a) Demolition of existing rear single storey extension and construction of a new rear single storey flat roof extension in lieu; (b) construction of new dormer to rear in lieu of existing dormer; (c) internal alterations to existing dwelling to create a self-contained family unit accessed from main house; (d) construction of a new front porch extension with flat roof; (e) all associated site works.
Replace single storey front rooms & entrance porch with new face brick single storey rooms with rooflights; new position for main entrance; new opens to front ground and first floor; replacement of all other windows and solar panels to front roof.
Retention of as-built extensions to the fore, side and rear at ground floor existing two storey house with amendments to all elevations & ancillary site works.
Change of use of existing detached warehouse unit to vehicle service workshop including new internal works to from new staff canteen and toilet accommodation; new fire door exit doors; roller shutter door to existing elevations and attached illuminated building signage.
Change of use of the second floor of the subject building to a Dental Practice comprising of 2 surgery rooms, offices, waiting room/reception, sterilisation room and toilets and ancillary site works.
Planning permission sought for the construction of a first floor extension over existing single storey extension to front, side and rear of existing house, additional first floor extension consisting of proposed bedroom with dormer window to front and rear roofs and all associated site works.