Planning records
Showing 1-50 of 34,878 public recordsThe development consists of the construction of a new flat roof dormer to the rear of existing dwelling at roof level to allow for increased headroom to new converted attic storage space. The development is to include internal alterations, and all ancillary site works or drainage as required.
The development will consist of a new front porch to replace existing to the front and side elevation & a new dormer window to the rear roof slope to an existing converted attic and removal of existing roof lights.
The development will consist of a new dormer window to the rear roof slope to an existing converted attic and removal of existing roof lights.
A single storey extension to rear of existing dwelling and attic conversion to study with dormer window to rear roof plane and a rooflight to front roof plane.
Planning permission sought for single storey extension to front and side of existing house, new porch entrance and enlargement of sitting room and all associated site works.
PERMISSION & RETENTION: To retain a single storey Bay Window and canopy extending over hall door and removal of front garden wall & widening of vehicular access, and permission to erect fence along boundary with adjoining semi-detached house at No. 1
Permission for single storey extension to front of garage, garage conversion at side, and subdivision of the existing dwelling to create an independent dwelling unit for a family member with special needs.
RETENTION & PERMISSION: The development seeking permission will consist of narrowing the existing vehicular entrance to 3.5m wide. The development seeking retention permission consists of the provision of the vehicular entrance in the front boundary.
Planning Retention is sought for alterations of existing shared vehicular entrance, formation of new 3 M. wide private entrance and construction of walls & piers to front boundary and shared side boundary. Planning Permission is sought to dish public foothpath.
The development consists of the change of use of unit 4 the Timber Mill, Artane, Dublin 5 from a hairdressing and beauty salon to a centre of medical and related services and all associated refurbishment works.
Construction of new vehicular entrance, dishing of footpath, and associated site works.
Planning permission for an attic conversion to storage space with dormer window to the rear roof, a new window to the gable at attic level and conversion of landing window to doorway with fire escape to rear yard area.
RETENTION:Retention permission of single storey extension to rear garden.
The construction of a single storey extension to the front with projecting canopy over front door, removal of existing chimney stack, conversion of existing attic space to home office use with a dormer window to the rear roof plane, porthole window in the existing north east facing gable wall at attic level and alterations to existing front boundary wall to allow for a relocated and widened vehicular entrance onto Pinebrook Avenue.
Planning permission sought for change of use of former shop to a one bed apartment with a new bedroom added to rear to form a 2-bedroom apartment to a semidetached 2 storey premises with a 3-bedroom apartment above at first floor with attic space.
Planning permission for attic conversion with hip roof to gable and dormer to rear to accommodate stairs to allow conversion of attic as non habitable storage space, roof window to front all with associate ancillary works
The partition of the existing 5 bed semi-detached house into two separate dwellings comprising one 2-bed and one 3-bed dwelling with single storey extensions to the rear of both dwellings; general alterations to elevations including new front entrance porches, new/altered windows, new roof lights; the front vehicular entrance to be widened; and associated external works.
Permission for change of profile of existing hipped roof to pitched roof with side dormer, to create space within their attic for a playroom and storage area.
Alterations to the front boundaries of Nos. 53 and 54 to provide two separate vehicular entrances and associated off-street parking spaces, together with dishing of the public footpath to provide access, and all associated site works.
The proposed works include an alteration to the existing hipped roofs structure and construction of a new dormer window to the side roof plane to create space in the attic for access to a new storage and playroom area. Plus all associated site works.
Permission for the continuation of use as a single dwelling, originally approved under planning application Ref. 0973/93, and the removal of Condition 2 imposed under retention application Ref. 0194/97 which required the houses to be reverted to use as two separate single-family residences.
Storebox Self Storage Ireland Limited, intend to apply for permission for development at this site: Unit 3EB, Artane Business Park, Dublin 5. The development will consist of: Amendments to permission granted under Dublin City Council Reg. Ref. 4021/20 comprising internal alterations including change of stair location, filling of an existing void in the mezzanine floor of 12m2 for use for storage units, changes to bathroom facilities, inclusion of new fire doors, a new external fire escape stairway, new window at first floor level, additional signage, changes to the storage container layout in the rear yard area and all ancillary development.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear.
Planning permission for attic conversion with dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to front and gable window to side all with associated ancillary works
The creation of a new vehicular entrance in front boundary wall onto Maryfield Crescent.
Planning permission for a mixed use development comprising a build-to-rent (btr) residential development, a hotel, office / enterprise space and enterprise units at a site circa 0.4073ha located and accessed from the kilmore road, artane, dublin 5, d05 c7x8 on the site of the old ‘novum’ building, part of the estate known as the artane business park, located east of the butterly business park and west of the access roadway through the estate. The development consists of the demolition of the existing single storey building (circa 2,752sqm) and sections of boundary walls (some subject to agreement with adjoining landowners); the construction of two building blocks a&b (block a to the south and block b the north), defining and separated by an urban square, block a (comprising of a hotel, enterprise units, btr apartments with associated communal residential amenities, with 2 no. Roof gardens; at 2nd floor podium level and 5th floor rooftop level) and block b (comprising of enterprise units, office/enterprise units, btr apartments with associated communal residential amenities and roof garden; 5th floor rooftop level, further detailed below; with a total gross floor area of circa 10,323sqm. Block a is a 2, 5 + 7 storey building, it faces kilmore road (to the south), the access road (to the east), the boundary of the butterly business park (to the west) and is designed as two blocks linked by a two storey podium with landscaped roof garden. The southern part of block a comprises a 77 bedroom hotel, including a ground floor restaurant (circa 187sqm) with associated external dining area and ground floor colonnade to the south west, café/bar (circa 83sqm), 4 no. First floor meeting rooms (circa 210sqm), gym and business center facilities (with shared usage by btr residential units), 77 bedrooms over second, third, fourth, fifth and sixth floors, plant/services room at seventh floor (roof level), with solar panels at 7th and 5th floor roof levels and extensive green roof at 2nd floor, all with a gross floor area of 3,950sqm the northern part of block a also includes a 2 storey podium with roof garden, ground floor colonnade to 3 no. Ground floor enterprise units with gross floor area of 194sqm, refuse areas, bicycle parking, a one-way vehicular and a pedestrian route under the block from the urban square, turning to link to the eastern access road, with car parking at ground and first floors, with associated car lift access from urban square, 20 no. Apartments btr over second, third and fourth floors (8 no. 1 bed units; 12 no. 2 bed units), all with balconies or terraces facing north, south and west), second floor associated community room (circa 37sqm), and external landscaped semi-private deck area, (circa 457sqm), fifth floor community room (circa 18sqm) and landscaped rooftop garden area, circa 267sqm, and extensive green roof, all with a gross floor area of 3,330sqm. Block b includes ground floor colonnade to 2 no. Ground floor enterprise units (circa 323sqm, refuse areas, secure bicycle parking, btr concierge/reception, first floor office / enterprise unit (circa 471sqm), btr common room (circa 85sqm), 21 no. Apartments over second, third and fourth floors (9 no. 1 bed units; 12 no. 2 bed units), all with balconies or terraces facing north, south and west), fifth floor community room (circa 18sqm) and landscaped rooftop garden area, circa 267sqm, and extensive green roof, all with a gross floor area of 3,043sqm. The development includes 4 no. Refuse stores, 3 no. Bicycle stores, 100 no. Cycle parking spaces, 48 no. Car parking spaces, including 3 no. Car club parking spaces, 2 no. Set down area for hotel, 1 no. Loading bay, 2 no. Car lift waiting spaces, community amenity open space at second floor podium level to block a (circa 457sqm), and at roof level / fifth floor of blocks a and b (circa 534sqm), boundary treatments and all associated site works including sustainable urban drainage systems, green roof systems, waste management areas, roof plant, associated hard and soft landscaping, and all other associated site excavation, infrastructural and site development works above ground including boundary treatments and associated site servicing (foul and surface water drainage and water supply). Access to the scheme will be via kilmore road.
A) Alterations to existing ground floor extension and further extension to same to allow for new single storey granny flat, b) all associated site works to of No 16 Maryfield Crescent, Artane, Dublin 5
RETENTION: Retention Permission is sought for existing 3 small sheds including wc and dog kennel which are over the Exempted Development limit of the existing larger shed that does not require Retention, all at 16 Maryfield Crescent Artane Dublin 5.
RETENTION: Planning permission for extended vehicular access with extended permeable driveway and ancillary works.
Planning permission for proposed new vehicular entrance to off street car parking to front garden and replacement of existing flat roof dormer with new flat roof dormer at attic level to rear and all associated site works.
RETENTION: The development to be retained consists of a Brams Gourmet Fries restaurant unit, which includes the sale of hot and cold food for consumption on and off the premises, and comprises 2 no. bespoke serving and storage containers picnic bench seating area with two parasols, terrace screens and all associated site works.
PERMISSION & RETENTION: For development at this c. 0.015 ha site, in the car park of Tesco, Artane Castle Shopping Centre, Kilmore Road, Dublin 5. The development will consist of/consists of: (i) retention permission for "Click and Collect" signage in the existing Tesco car park; and (ii) permission for the construction of a sheltered canopy (c. 50 sq.m) in the existing car park for the purpose of providing 2 no. dedicated "Click and Collect" spaces for the existing Tesco store, 2 no. pedestrian crossings and all associated site development works.
RETENTION: Retention permission for the continued use of Unit 3EB for self-storage use as granted for a temporary period under planning reg. ref. 3788/17. No internal or external works to the existing building are proposed. Retention permission is also sought for storage containers located to the rear of Unit 3EB and storage containers in an open yard area to the north of the property.
Permission for the subdivison of the previously combined Units 1 and 2 Artane Place (formerly Butterly Business Park), Kilmore Road, Artane, Dublin 5 into two separate Units to be known as Unit 1, Artane Place, Kilmore Road, Artane, Dublin 5 and Unit 2, Artane Place, Kilmore Road, Artane, Dublin 5 respectively including a change of use from previous retail for the current combined unit to proposed retail/cafe/take away for each of the subdivided units. The insertion of a new shop front in the north west elevation of the new Unit 1. The removal of existing roller shutter from the south west elevation of Unit 1 and the blocking up of that opening. The insertion of a single escape door in the south west elevation of Unit 1 and in the south east elevation of Unit 2.
Single storey extension to front, extending entrance hallway and living room.
The development will consist of demolishing an existing 13.5 sq.m detached storage shed and buiding a 30.5 sq.m detached playroom and w.c. in the rear garden of the dwelling house.
Proposed alterations and change-of-use of existing Credit Union Office to Dental Surgery, new signage and all associated works at Unit 5, Artane Castle Shopping Centre, Kilmore Road, Dublin 5, D05 VA02.
Planning permission for an attic conversion to a non – habitable storage space with roof windows to front of existing house and ancillary works
RETENTION. The development consists of use of a previously vacant light industrial unit of 807.5m2 for self storage use. The storage consists of 34 no. 160 sq. ft. internal container units and 2 no. 12 sq. ft. wooden storage units, signage to the front of the building and all ancillary development.
CHANGE OF USE. (i) The change of use from office use to medical use; and, (ii) all associated internal reconfiguration works and ancillary works necessary to facilitate the development.
Planning permission is sought for development comprising: the change of use of vacant offices at first floor level of unit 35A to use as artist studios. A total of 10 no. artist studios will be provided, all at first floor level. The existing reception (at ground floor level), kitchen (at first floor level) and WC (at first floor level) will serve the proposed studios. The development also includes any ancillary works necessary to facilitate the development.
The development consists of construction of a single storey extension to the existing takeaway at the rear and pedestrian access to side onto laneway and all associated site works.
The development will consist of (i) change of use from existing restaurant on the 1st floor of an existing 3 storey mixed use block (previously approved under planning ref: 4609-08) to 3 No. residential apartments (ii) alterations to the existing (east) rear elevation to include removal of existing external escape stairs, alterations to existing window opes and provision of 2 new balconies (iii) alterations to the existing (south) side elevation to include provision of new window & door opes and provision of 1 new balcony (iv) all associated site development works.
RETENTION and PERMISSION: (i)Retention permission for the relocation of the existing "Click and Collect" signage, (ii) Planning permission to extend the existing canopy (as permitted under Reg. Ref. 3571/21) by c 25.61sq. m to provide a total of 3 no sheltered "Click and Collect " car parking spaces for the existing Tesco store; and (iii) all associated site development works.
The change of use and amalgamation of Units 33 & 35 Artane Place from commercial to retail use. Planning permission is also sought for alterations/demolition to the units comprising: a) Partial demolition of the front (southwest) elevation in order to create a new shopfront; b) The creation of 3 no. new openings (entrance door and 2 no. glazed windows) on the southwest elevation and 2 no. new openings (exit door and roller door) on the northeast elevation; c) The removal and blocking up of existing roller shutters, windows and access doors on the southwest and northwest elevations; d) The removal of the existing roof coverings to be replaced with a new insulated metal profile roof sheeting; e) The erection of internally illuminated signage on the southwest elevation and f) Internal works to configure the units and all ancillary works necessary to facilitate the development.
Permission for (i) a part single storey (flat roof) and part two storey (pitched roof) extension to the rear; (ii) Rooflights; (iii) Widening of vehicular entrance; (iv) Minor alterations to side and rear elevations & all associated works to facilitate the development at 9 St. Brigids Close, Killester, Dublin 5 D05 K293.
Development will consist of demolishing existing chimney. A proposed new ground floor only extension to the front & rear of the existing house. A proposed new first floor only extension to the side of the existing house extending the Dutch hip gable roof across. A proposed new dormer roof to the rear of the existing house roof and all ancillary works.
The proposed alterations consist of: (i) provision of 1 no. en-suite bedroom at attic level of house types B and C; (ii) installation of a dormer window on the north facing roof-slope and an additional velux window (resulting in a total of 2 no.) to the south facing roof-slope of house types B and C; (iii) reconfiguration of first floor layout of house types B and C to accommodate stairs to additional attic level bedroom; and (iv) all associated ancillary works necessary to facilitate the development.
The development consists of the conversion of the existing attic with provision for a dormer extension to the rear at attic level and for 1no. window at attic level to the gable side and to alter the existing hipped roof profile to a gable wall profile and for all associated site works.
The development seeking permission will consist of the provision of a 3m wide vehicular entrance to the front of the property.