WEB2236/24Granted
39 Mountjoy Square, Dublin 1
PROTECTED STRUCTURE. PERMISSION & RETENTION. The development will consist of restoration and preservation works to the brick facades including repair, re-pointing, and consolidation of the brickwork, rendering in lime plaster to the rear return, the cleaning and the re-pointing of the front steps, the repair of the railings to the front, retiling of the entrance hall and replacement of rainwater goods and doors to basement. Retention permission is sought for the installation of internal linings to the basement and ground floor level return walls and ceilings, including breathable insulation and plasterboard to basement walls internal walls.Decision record indexedDecision17 January 2025View record