Planning records
Showing 1-2 of 2 public recordsRETENTION & PERMISSION:PROTECTED STRUCTURE: Development at No. 5 Saint Andrew Street, Dublin 2 (a four storey over basement Protected Structure - Register of Protected Structures Ref. no. 7568). The proposed development consists of: -Retention planning permission for: the change of use of the first, second and third floors from office to residential use (3 no. c. 50 sq.m apartments, one at first floor level, one at second floor level, one at third floor level); and internal alterations to the Protected Structure associated with the change of use of the upper floors from office to residential use; and -Planning permission for internal for fire safety related works at ground, first, second and third floor levels.
The development will consist of the following: the demolition of the existing six storey mixed use structure (c. 6,108 sq. m) known as 'Moira House' and 'Trinity Street Car Park', currently comprising a 171 no. space multi storey car park, 3 no. retail units at ground floor (c. 508 sq. m) and 5 no. self-contained offices suites (c. 292 sq. m) and the provision of a nine storey over basement office building with a restaurant at ground floor. The proposed building has a total height of c. 36.218m above ground (43.7m ODM, including lift overrun), stepping back at seventh and eighth floor levels with a gross floor area of c. 7,460 sq. m (including basement of c. 318 sq. m). The proposed building will accommodate office space at first to ninth floor levels with a reception lobby at ground floor accessed from Saint Andrew's Lane and a ground floor restaurant unit (c. 540 sq. m) accessed from both Trinity Street and Saint Andrew's Lane. The proposed building is set back from Trinity Street at ground and first floor levels providing for a pedestrian plaza/seating area (c. 53 sq. m) while the building is also set back from Saint Andrew's Lane to the south providing for a second entrance plaza (c. 32 sq. m). The proposed development includes terraces at seventh and eighth floor levels to the north elevation, PV panels at roof level, plant at roof level (including lift overrun) and at basement level, substation/switch room at basement level, 2 no. stair cores, 3 no. lift cores, a separate stairs from the restaurant to the basement, bicycle storage at basement level (c. 76 no. spaces), bike lift, ancillary facilities (including shower block) and all other ancillary site development works.