Planning records
Showing 1-14 of 14 public recordsThe proposed development will consist of conversion and extension works to the existing garden centre facility comprising the following elements: 1. The construction of an extension (2160 m2 GFA) to the existing garden centre facility to facilitate the following: (a) The expansion of the garden centre sales area. (b) The relocation and expansion of the existing coffee shop/restaurant and associated kitchen, inclusive of the provision of new customer toilets. (c) The provision of new staff facilities comprising changing rooms, locker rooms, toilets, staff canteen and office at ground and first floor level. (d) The provision of an external landscaped garden to the rear of proposed coffee shop/restaurant. The proposed extension will consist of single and two-storey, flat and pitched roofs with heights varying between c.3.5 - 8.2 m high. 2. The conversion of the existing coffee shop/restaurant and associated kitchen to facilitate the further expansion of the garden centre sales area in its location. The total GFA of the proposed expansion of the garden centre sales area between this conversion and the proposed extension is 733 m2. 3. The construction of a 2.5 m high steel canopy sheltered area (228 m2 GFA) within the existing service yard located within the of the subject site. 4. The relocation of 2 no. existing polytunnels (578 m2 GFA) towards the eastern boundary of the subject site to facilitate the proposed extension works. 5. Alterations to existing car parking layout to provide 158 no. customer car parking spaces, inclusive of 9 no. accessible spaces, 16 no. electric vehicle parking spaces and 2 family parking spaces together with the addition of 15 no. new motorcycle parking spaces and 30 no. sheltered bicycle parking spaces. 6. Provision of new staff car parking area accessed via a new service road to the rear of the proposed extension comprising 27 no. new staff car parking spaces inclusive of 1 no. accessible space and 3 no. electric vehicle parking spaces together with the addition of 4 no. new motorcycle parking spaces and 20 no. sheltered bicycle parking spaces. 7. Provision of a new percolation area and provision of new surface water design including new detention basin to facilitate the proposed development. 8. All associated site and engineering works and landscaping works necessary to facilitate the development. Additional Information received 13/05/2026
We, Pat Hughes and Catherine Elliot, intend to apply for retention permission for development at 1 New Road, Donabate, Co. Dublin. The development consists of amendments to the development previously approved under Reg. Ref. F23A/0427. The amendments include; a) Internal reconfiguration of the extension to provide a new bedroom at first floor level, increasing the size of the dwelling from the previously permitted single-storey 4-bedroom house to 2-storey 5-bedroom house; b) Elevational changes and fenestration; c) Removal of the previous chimney; d) Blocking up of the original vehicular access and construction of a new vehicular access onto New Road; and e) Construction of a single storey, detached garage/boot room/laundry room located to the rear of the house.
The development will consist of re-design & some alterations to previously approved planning application F16B/0043/E1. New proposal is a 2 storey pitched roof extension to the side of the existing dwelling with dormer window at first floor level to the front elevation to match existing dormer. All new works are to the northern end of the site facing Portrane Road. The development is to include internal alterations, landscaping and all ancillary site works and drainage as required. AI received 22/11/24 SAI received 22/12/24
No1. The construction of 364 no. new residential dwellings consisting of 158 no. houses, 82 no. duplex units and 124 no. apartment units set out follows: • Construction of 158 no. 2-storey houses (54 no. 2-beds, 99 no. 3-beds, 5 no. 4-beds). • Construction of 82 no. 2 to 3 storey duplex units (8 no. 1-beds, 33 no. 2-beds, 41 no. 3- beds), with balconies on all elevations. • Construction of 3 no. apartment blocks, ranging from 3 to 6 storeys in height, with balconies on all elevations, green roofs, and external amenity courtyards, providing a total of 124 no. apartment units (48 no. 1-beds, 66 no. 2-beds, 10 no. 3-beds). 2. The scheme provides c. 17% public open space of the net site area comprising 2 no. small parks and 1 no. pocket park which total c. 13,646 sq.m. These parks are located centrally within the site providing a series of north-south linear spaces linking to permitted Ballymastone Phase 1 (FCC Ref. LRD0008/S3 & ABP Ref. 315288) to the south. 3. A total of 278 no. car parking spaces are provided (in-curtilage for the houses and in a mix of both on-street and communal car parking areas for apartment and duplex units). A total of 1,457 no. cycle spaces are provided for residential units (comprising 1,353 long-stay/ resident spaces and 104 no. short-stay/ visitor spaces). 4. The development provides for vehicular access from The Links Road, Donabate Distributor Road (DDR) and permitted Ballymastone Phase 1 (FCC Ref. LRD0008/S3 & ABP Ref. 315288). 5. A north-south pedestrian/ cycle route is proposed within the site connecting permitted Ballymastone Phase 1 (FCC Ref. LRD0008/S3 & ABP Ref. 315288) and future development lands to the north. A series of east-west pedestrian/ cycle routes are proposed connecting the site to permitted Ballymastone Recreational Hub to the east (PARTXI/004/21). 6. Proposed new foul pump station located to the north-east of the site. 7. The proposed application includes all site enabling and site development works, landscaping works, PV panels, bin stores, plant, boundary treatments, ESB Substations, lighting, servicing, signage, surface water attenuation facilities and all site development works above and below ground. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development. The application may also be inspected online at the following website set up by the applicant: www.ballymastonelrd2.ie AI - received 8/7/24
Permission sought to demolish existing games room (timber Construction), And to build new games room(masonry Construction), to rear. Retention permission sought for ground floor W.C. and utility room. New dormer extension to rear to extend existing bedroom 2, and provide new en-suite. New dormer extension to provide new extended bathroom and en-suite to existing bedroom 5.
1. Construction of 1,020 no. new residential dwellings on the Main Residential Development Site comprising: • 70 no. one-bed apartments (including 51 no. sheltered housing units), 64 no. two-bed apartments and 1 no. three-bed apartment arranged in 7 no. blocks. Apartment Blocks 1 to 6 range in height from 4 to 5 storeys and include balconies/terraces on all elevations. The Sheltered Housing Block is 3 storeys in height and has balconies/terraces on all elevations. • 30 no. two-bed and 9 no. three-bed, 2-storey apartments are proposed in terraced format throughout the scheme (Apartment M Type); • 63 no. one-bed apartments, 119 no. two bed apartments and 174 no. three-bed apartments are proposed, arranged in duplex and triplex format in terraces and corner blocks, ranging in height from 2 to 4 storeys; and • 38 no. two-bed houses, 300 no. three-bed houses, 141 no. four-bed houses and 11 no. five-bed houses (ranging in height from 2 to 3 storeys). 2. Provision of 2 no. childcare facilities (total GFA approximately 1,243 sqm) in stand-alone, 2 storey buildings, with capacity for in the order of 237 no. children. 3. Provision of 3 no. retail units (total GFA approximately 342 sq m), 2 no. café units (total GFA approximately 188 sqm), a community use unit (approximately 91 sqm) and a medical centre (approximately 200sqm GFA) at the proposed local centre area (located at ground floor level of Apartment Blocks 1, 2, 3 and 5). 4. A total of 902 no. car parking spaces are proposed (comprising 852 no. residential spaces; 11 no. childcare facility spaces (drop off only), 39 no. on-street visitor parking spaces (including 4 no. car-share spaces and 10 school drop off spaces), together with a total of 3,013 bicycle parking spaces (comprising 2,554 no. long stay spaces and 459 no. short stay spaces). 5. A series of public parks, open spaces, pocket parks and communal open spaces are proposed throughout the Main Residential Development Site. 6. Provision of the Corballis Nature Park (approximately 13.0ha) on lands to the south of the Donabate Distributor Road (DDR) to provide multifunctional natural amenity area including a cycle and pedestrian connection from the DDR to Corballis Cottages Road and Sustainable Drainage Systems (SuDS) features to serve the wider Corballis lands. 7. Vehicular access to the Main Development Site will be via two existing junctions from the DDR to the south and a new vehicular entrance to the north-east at New Road. The proposed development also provides for the extension of the existing footpath incorporating a cycleway by approximately 215m from The Strand to the proposed new entrance on New Road to the west, and 85 m of footpath incorporating 73 m of cycleway to the east of the new entrance on New Road, along the southern side of New Road, together with all associated works. 8. Modifications to Phase 1, permitted under FCC Reg. Ref. F20A/0204 (ABP-308446-20), to facilitate vehicular access to car parking associated with permitted Block 4 (34 no. units) via the proposed LRD Scheme together with all associated amendments to the Phase 1 layout, including minor reconfiguration of permitted Block 4 car parking spaces, and omission of vehicular access to Block 4 via the shared cycle street as originally permitted under FCC Reg. Ref. F20A/0204 (ABP-308446-20). Pedestrian and cycle connectivity will be facilitated between the proposed LRD Scheme and permitted Phase 1. 9. Proposed development facilitates future potential pedestrian, cycle and vehicular links to existing and proposed adjoining developments including a connection to the proposed Nature Park via an existing pedestrian crossing on the DDR, and the approved Broadmeadow Way proposal (ABP Ref. ABP-304624-19) (via the Nature Park). 10.All enabling and site development works, landscaping, boundary treatments, lighting, services and connections, including connection to permitted wastewater pumping station (FCC Reg. Ref. F19A/0472), omission/decommissioning of temporary pumping station and detention basin permitted under FCC Reg. Ref. F20A/0204 (ABP-308446-20), waste management, ESB substations, and all other ancillary works above and below ground on a site of approximately 41.9 ha. 11.A 10 year permission is sought. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal Development Plan 2023-2029 and the Donabate Local Area Plan 2016 (as extended). The Planning Application, including the EIAR and NIS, may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority (Fingal County Council, Fingal County Hall, Main Street, Swords, Fingal, Co. Dublin) during its public opening hours. The application, including EIAR and NIS, may also be inspected online at the following website set up by the applicant: www.corballiseastlrd.ie AI Received 21/12/2023
To view details of this application please visit www.BallymastoneLRD1.ie A ten-year permission for a Large Scale Residential Development (LRD) at this site at Ballymastone, Donabate, County Dublin. The application site, of 15.02ha, comprises a land parcel dissected by the Donabate Distributor Road (DDR). The site is bounded by existing residential development of The Links and St. Patrick's Park to the west, the wider undeveloped Ballymastone lands and The Priory to the north, greenfield residential development lands (as permitted under F17A/0373 and F20A/0510) and New Road to the South, and St. Patrick's GAA Club and Donabate Golf Club to the east. The proposed development will consist of the construction of a residential development, which represents Phase 1 of the wider development of the Ballymastone Lands (as identified in the Donabate Local Area Plan 2016 (as extended)), ranging in height from 2 to 6 storeys to accommodate 432 no. residential dwellings (including a mix of apartments, duplexes and houses), a crèche and public open space. The site will accommodate 554 no. car parking spaces, 831 total no. bicycle parking spaces, new pedestrian/cycle links, road improvements, storage, services and plant areas. Landscaping will include communal amenity areas, and a significant public open space provision. The development is set out as follows: 1. The Construction of 432 no. new residential dwellings consists of 93 no. Apartment units, 126 no. Duplexes and 213 no. Houses set out as follows: - Construction of 2 no. Apartment blocks, ranging in height from 3 to 6 storeys, with balconies on all elevations, green roofs, and external amenity courtyards, providing a total of 93 no. units (42 no. 1-beds, 41 no. 2-beds & 10 no. 3 beds). - Construction of 213 no. 2-storey houses (75 no. 2-beds, 130 no. 3-beds & 8 no. 4-beds). - Construction of 126 no. 2 to 3 storey duplex units, with balconies on all elevations (10 no. 1-beds, 55 no. 2-beds & 61 no. 3-beds). 2. The scheme provides 15.6% public open space of the net site area comprising of two small parks and two pocket parks which total c. 15,417 sq.m. The two small parks, referred to as Baile Uisce Park and Ballisk Park are located centrally within the scheme, either side of the DDR, and are organized around existing archaeological features. 3. Provision of 1 no. crèche, located to the south of the site of c. 909 sq.m and will cater for c.182 no. child places with an external play space of c.430 sq.m. 4. A total of 544 no. car parking spaces are provided (in-curtilage for the houses and in a mix of both on-street and communal courtyard parking areas for apartments/duplexes and visitor parking) and a total of 10 no. spaces for the crèche. A total of 791 no. cycle parking spaces are provided for the residential units (comprising 717 no. long stay/resident spaces in secure locations and 74 no. short stay/visitor spaces at surface level) and 40 no. spaces for the crèche. 5. The development provides vehicular access from New Road via the Donabate Distributor Road, Portrane Road via The Links Road and directly from the Donabate Distributor Road as well as pedestrian links to all surrounding access points. Upgrade of the existing junction at the Portrane Road/The Links Rd is included for. An east-west pedestrian cycle route is proposed, with associated landscaping, connecting the DDR to the Links Road to the north of the site. The site also connects, via the DDR, to the proposed Ballymastone Recreation Hub. The development includes for the proposed alterations of the permitted routing of the connection from New Road to the Links Road, within the site boundary, as permitted under F17A/0373 (PL06F.249206). 6. The proposed application includes all site enabling and development works, landscaping works, PV panels, bin stores, plant, boundary treatments, ESB substations, lighting, servicing, signage, surface water attenuation facilities and associated and ancillary works, including site development works above and below ground. An Environmental Impact Assessment Report and a Natura Impact Statement have been prepared in respect of the proposed development.
Part change of use of existing off sales & bar to a new coffee/ice cream shop & new restaurant & takeaway; the proposed works consist of the following: (1) A new 10.2 sq.m rear extension consisting of 2 no. new staff toilets, (2) Fit new retractable awning to the southwest (front) elevation, (3) 5 no. new illuminated associated signage to the southwest (front) elevation, (4) 5 no. new LED display lights to the southeast elevation with internal alterations & all associated site works. AI received 2/3/2022 CAI received 22/4/2022
The development will comprise:- (i) Construction of 36 No. houses, comprising of 10 No. four-bedroom, 2-storey, semi-detached houses; 18 No. three-bedroom, 2-storey, semi-detached houses; and 8 No. two-bedroom, 2-storey, terrace houses. Each dwelling will feature a private rear garden and roof mounted solar panel or photovoltaic panels; (ii) Construction of 28 No. apartment/duplex units, comprising of 14 No. two-bedroom apartments and 14 No. three-bedroom duplex units, in 3 No. 3-stoey blocks. Each apartment/duplex unit is provided with a private balcony or terrace. The 3 No. blocks proposed are served by 430sqm of communal amenity space and roof mounted solar panel or photovoltaic panels. The proposed development includes 111 No. car parking spaces, inclusive of 64 No. on-curtilage car parking spaces serving the houses (2 No. spaces per 3 and 4 bedroom house and 1 No. space per 2 bedroom house), 41 No. car parking spaces serving the apartments/duplex units and 6 No. visitor car parking spaces, and 72 No. bicycle parking spaces (36 No. provided in 3 No. secure bicycle storage areas and 36 No. provided throughout the development); (iii) Construction of a 1,800sqm public open space area, featuring a playground, in the north-western corner of the site; (iv) Creation of new vehicular entrance from New Road along the site's southern boundary; (v) Alterations to existing site levels through the importation of clean, uncontaminated soil and stones to the site; and (vi) All associated site, landscaping and infrastructural works, including tree planting, boundary treatments; street lighting; ESB substations; internal roadways, footpaths and shared surfaces; and foul/SuDS drainage, necessary to facilitate the development. Temporary permission (5 years) is also sought for; (i) the erection of 3 No. advertising signs (totalling 42sqm), for the purposes of marketing, on the sites eastern and southern boundaries. AI received 01/04/21 CAI received 15/07/21 CAI deemed significant 27/07/21 Revised public notices for CAI received 30/07/21
Permission for construction of new detached dwelling house, new carparking provision for proposed dwelling, with revised, shared vehicular access from New Road, and revised carparking provision for existing dwelling (No. 5 Ballalease West) and associated site works.
Retention of an as constructed attic conversion, including alterations to the works as granted under Reg Ref F16A/0534, as follows:- 1) Changing of the existing hipped roof to a gable end roof. 2) Removal of the as granted rear dormer window. 3) A velux rooflight to the front. 4) A window to the new gable wall. All at roof level. 5) Attic use to be storage.
Permission for (i) demolition of existing boundary wall (ii) construction of two number detached storey and a half houses (iii) provision of vehicular entrances for each house onto New Road, to provide access to 2 no. on curtilage car parking spaces per house; (iv) construction of a public footpath on the site's western boundary; and (v) all ancillary works necessary to facilitate the development including SuDS surface water drainage, site works, landscaping and boundary treatments.
The development will consist of:- (i) Demolition of existing boundary wall; (ii) Construction of two-storey apartment building, comprising 6 no. apartments (4 no. one-bedroom apartments and 2 no. two-bedroom units). Each apartment is provided with private open space in the form of a balcony at first floor level or garden / terrace at ground floor level. Each apartment has access to a communal open space area (147sq.m), bicycle storage area and bin storage area to the rear (North) of the site; (iii) Provision of 1 no. vehicular entrance on St Patrick's Park and 2 no. new vehicular entrances on New Road to provide access to 6 no. on curtilage car parking spaces which serve the apartments; (iv) Construction of a public footpath on the sites Western boundary; and (v) All ancillary works necessary to facilitate the development including SuDS surface water drainage, site works, landscaping, tree planting and boundary treatments.
Permission for development on a 0.353 ha site, a former builder's yard, that will consist of: (a) Demolition of 3 no. sheds; (b) Blocking up of disused access gate to Benson Close; (c) Construction of 9 no. 2 storey houses with attic accommodation; consisting of (i) 2 no. 5 bedroom detached houses, (ii) 3 no. 3 bedroomed terraced houses; and (iii) 4 no. 4 bedroomed semi-detached houses, (d) Widening of existing entrance to provide a new access road and footpaths off Beaverstown Road, (e) Provision of open space; (f) All associated site works and boundary treatment works. Add Info received 30th January 2020. Add Info deemed Significant 4th February 2020. Revised Public Notices received 7th February 2020.