The development will consist of a change of house design and all associated site development works. Previous Planning Reference No.: 21/655Decision record indexed
CONSTRUCT A DWELLING HOUSE AND SEPTIC TANK/PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
RETENTION OF EXISTING CAR PORT AS CONSTRUCTED TO EXISTING DWELLING HOUSE TOGETHER WITH REVISIONS TO DWELLING GRANTED UNDER P93/1157 AND AS SHOWN ON PLANS AND ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
Construct a dwelling house, garage and septic tank/ foul effluent treatment system, all as per drawing documentation submitted together with all ancillary site works and servicesDecision record indexed
Planning Permission to 1.) Construct a four-bay slatted shed incorporating a creep area, cattle crush and feed passage, 2.) construct a farm machinery storage shed, and 3.) construct a silage slab incorporating mass concrete walls, all as per drawing documents submitted, together with all ancillary site works and services.Decision record indexed
Planning Permission to construct a dwelling house, garage and septic tank with percolation area all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Construct dwelling house with waste water treatment system and garage on site together with all ancillary site works and servicesDecision record indexed
Construct a private dwelling house, proprietary effluent treatment unit, percolation area and domestic garage along with all associated servicesDecision record indexed
CONSTRUCTION OF AN AGRICULTURAL BUILDING FOR HOUSING BOVINE LIVESTOCK AS SHOWN ON PLANS INCLDUING ALL ANCILLARY SITE DEVELOPMENT WORKS. THE AGRICULTURAL BUILDING WILL BE LOCATED IN A WORKING FARMYARD WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE (NO. 0092 CAPPAGH HOUSE)Decision record indexed
Alter the front elevation of existing house including new windows, porch and pitched roof as per documents lodged together with all ancillary site works and servicesDecision record indexed
Planning Permission to retain dwelling house and garage on revised location and permission to complete as previously granted under P23/105 all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Construction of a proposed new detached dwelling house, separate garage, new entrance, new boundary treatments, new waste water treatment system, connection to site services, and all associated site works and landscapingDecision record indexed
Construct dwelling house and garage with waste water treatment system and demolish existing derelict shed on site together with all ancillary site works and servicesDecision record indexed
The habitat restoration works along approx. 800 meters of river will involve the construction of low level deflectors, the creation of pools and the addition of random boulders and spawning gravel. Livestock access to the river will be closed by the erection of fencing, and alternative water supply provided.Decision record indexed
Planning Permission to construct a dwelling house, garage and septic tank with percolation area all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
CONSTRUCTION OF A DWELLING HOUSE WITH GARAGE AND AN EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCT NEW DETACHED DWELLING HOUSE, SEPARATE GARAGE, NEW ENTRANCE, NEW WASTE WATER TREATMENT SYSTEM, CONNECTIONS TO SITE SERVICES AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
MOVING THE PROPOSED DEVELOPMENT BACK 6 METERS FROM ORIGINALLY GRANTED AND RAISING THE FINISHED FLOOR LEVEL TO 81.400 TO MATCH NEW SITE POSITION.Decision record indexed
The development will consist of the construction of a new dwelling house, garage, carport, on-site wastewater treatment system together with all ancillary site development worksDecision record indexed
REFURBISHMENT OF AN EXISTING HOUSE, DEMOLITION OF EXISTING REAR EXTENSIONS AND OLD SHED, CONSTRUCTION OF A PROPOSED NEW EXTENSION TO THE REAR AND SIDE OF THE EXISTING PROPERTY, SEPARATE GARAGE, UPGRADE TO EXISTING ENTRANCE, NEW WASTE WATER TREATMENT SYSTEM, CONNECTIONS TO SITE SERVICES, AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
CONSTRUCTION OF A NEW HOUSE, GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, AND CONNECTION TO EXISTING PUBLIC SERVICES TOGETHER WITH ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
Construct a dwelling house and septic tank/proprietary effluent treatment system together with all ancillary site works and servicesDecision record indexed
Retention of attic conversion, the construction of bathroom at first floor and the retention of domestic garage, previous planning ref. P03/3501Decision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, AND CONNECTION TO EXISTING PUBLIC SERVICES TOGETHER WITH ALL ANCILLARY SITE DEVELOPMENT WORKSGrounds not yet categorised
CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, ON-SITE WASTEWATER TREATMENT SYSTEM, AND CONNECTION TO EXISTING PUBLIC SERVICES TOGETHER WITH ALL ANCILLARY SITE DEVELOPMENT WORKSDecision record indexed
Construct a private dwelling house, proprietary effluent treatment unit, percolation area and domestic garage along with all associated servicesDecision record indexed
CONSTRUCT MILKING PARLOUR BUILDING WITH COLLECTION/DRAFTING AREA, SLATTED TANK, MEAL BIN, OFFICE, STORAGE AREA, PLANT ROOMS, DAIRY, CUBICLE HOUSE WITH SLATTED TANK AND ALL ASSOCIATED SITE WORKSDecision record indexed
Planning Permission to construct dwelling house, garage and foul effluent treatment system all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
THE REPLACEMENT OF APPROX. 291M OF EXISTING 2.4M HIGH CHAINLINK FENCING AND ASSOCIATED GATES WITH 291M OF NEW 2.4 HIGH GREEN PALISADE SECURITY FENCING/GATES AND ALL ASSOCIATED SITE WORKS AT AN EXISTING ABOVE GROUND NATURAL GAS INSTALLATIONDecision record indexed
To establish the use of the current portal frame structure, constructed prior to 2005, as a coffee processing unit, together with an effluent treatment unit and all ancillary site works and servicesDecision record indexed
ESTABLISH USE OF A CURRENT WAREHOUSE AS A COFFEE PROCESSING UNIT TOGETHER WITH THE INSTALLATION OF AN EFFLUENT TREATMENT UNIT AND ALL ANCILLARY SITE WORKS AND SERVICES.Grounds not yet categorised
Planning Permission to: 1. Retain the existing extension and the current first-floor layout to the dwelling house 2. Install Two new fire-escape windows at first-floor level of dwelling house 3. Retain the existing extension to the domestic garage all as per drawing documents submitted, together with all ancillary site works and servicesDecision record indexed
Planning Permission for change of use from domestic garage to residential unit all as per drawing documentation submitted together with all ancillary site works and services.Grounds not yet categorised
WORKS TO REFURBISH THE EXISTING CASTLEBAR-CLOON 110kV OVERHEAD LINE WHICH IS APPROXIMATELY 57KM LONG, AND COMPRISES 252 NO. WOODEN POLESETS AND 40 NO. STEEL ANGLE MASTS BETWEEN THE EXISTING CASTLEBAR 110kV SUBSTATION IN THE TOWNLAND OF AGHALUSKY, AND THE EXISTING CLOON 110kV SUBSTATION IN THE TOWNLAND OF CLOONASCRAGH, CO. GALWAY. APPROXIMATELY 20KM OF THE EXISTING CIRCUIT IS LOCATED WITHIN THE FUNCTIONAL AREA OF GALWAY COUNTY COUNCIL AND APPROXIMATELY 37KM IN THE FUNCTIONAL AREA OF MAYO COUNTY COUNCILDecision record indexed
Construct dwelling house with waste water treatment system and garage on site together with all ancillary site works and servicesDecision record indexed
Demolish existing derelict dwelling house and construct a private dwelling house, proprietary effluent treatment unit and percolation area along with all associated servicesDecision record indexed