Planning records
Showing 1-50 of 763 public recordsTo construct a new dwelling house, garage, effluent treatment system and polishing filter as well as all ancillary site works. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works: House - 149.00 sqm, Garage - 57.80 sqm
To (1) demolish existing side and rear elevation structures of the existing house and permission to construct new side and rear elevation extensions (2) proposed Velux roof windows as well as proposed alterations to existing dwelling house (3) new domestic garage (4) permission to replace existing septic tank and percolation area with new effluent treatment system with polishing filter as well as all ancillary site works. Gross floor space of proposed works: 346 sqm. Gross floor space of work to be retained: 115 sqm. Gross floor space of any demolition: 66.44 sqm
For the erection of a new 30m multi-user telecommunications support structure carrying 9 No. antennas. 6 No. communication dishes, 8 No. remote radio units, 3 No. lighting finials and 5 No. outdoor cabinets and all enclosed within a security compound by a 2.4m high palisade fence with a 4m access gate, site access and site works. The development will provide significant improvements in voice and broadband data services along the N59 National Road and the R340 and R344 Regional Roads
Chun athruithe a dhéanamh le mo theach cónaithe, chun síneadh nua a chuir leis, agus chun an sean chóras séarachais a uasgrádu chomh maith le gach obair eile a bhaineann leis an fhorbairt a dheanamh. Spás urláir comhlán na hoibre atá le coinneáil: 163 sqm
Chun athruithe a dhéanamh agus chun síneadh a chuir lena teach cónaithe, chun an seanchóras séarachais a uasgrádu agus garáiste a thógáil, chomh maith le gach obair eile a bhaineann leis an fhorbairt a thógáil. Tá Ráiteas Tionchar Nádurtha faoi bhráid maidir leis an t-Iarratas Pleanála seo. Spás urláir comhlán na n-oibreacha beartaithe: 47 sqm (H), 60 (G)
For the extension of an existing dwelling house, construction of a new site entrance with internal access road, installation of a new proprietary effluent treatment system and all associated site works. A Natura Impact Statement will be submitted with this application. Gross floor space of proposed works: 163 sqm
To construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works; This planning application is accompanied by a NIS. Gross floor space of proposed works 171sqm
To replace existing bay window to front elevation of existing dwelling, and replace gate and gate pillars at access driveway, and all associated site services and landscaping works
For single storey domestic garage to side and rear of existing dwelling house and all associated site services and landscaping works. Gross floor space of proposed works: 68.00 sqm(garage)
To construct a new agricultural shed as well as all ancillary site works and site services. This planning application is accompanied by a NIS. Gross floor space of proposed works: 354.09 sqm
Chun athruithe a dhéanamh agus Córas Séarachais agus Garáiste a thógáil chomh maith le gach obair eile a bhaineann leis an fhorbairt a thógáil. Tá me ag cuir Ráites Tionchair Nádurtha faoi bhráid. Spás urláir comhlán na n-oibreacha beartaithe: 140 sqm(h) 29 sqm (G).
To demolish an existing dwelling house and other associates structures and to construct a new dwelling house, domestic garage and sewage treatment system together with all associated site works on same site boundaries granted planning permission under ref 24/307. This application will be accompanied by an updated Natura Impact Statement
To construct a new dwelling house, effluent treatment system and polishing filter, vehicular access as well as all ancillary site works and site services. This planning application is accompanied by an NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended).Gross floor space of proposed works 179.00sqm.
To construct a new dwelling house, effluent treatment system and polishing filter, vehicular access as well as all ancillary site works and site services. Gross floor space of proposed works: 179 sqm.
For the existing single storey dwelling name above The Burrow to add a single storey extension of a bedroom and shower room
To construct a dwelling house, install a waste water treatment unit and polishing filter, and all ancillary site works and services. The application is accompanied by a NIS. Gross floor space of proposed works: 211.28 sqm
For extensions and alterations to dwelling house and to replace existing septic tank with a new waste water treatment system and retention permission is being sought for existing portable building for use as a home office with all associated works and ancillary services. Gross floor space of proposed works: 81.8 msq. Gross floor space of works to be retained:13.6 msq.
For the development including; material alterations to an existing single storey Health Centre, including outhouse & water storage tank area, & change of use from Health Centre to an ambulance base serving the wider Connemara area. The refurbishment works will include fabric & energy upgrades to the building. They will further include minor localised internal amendments to the floor plan to provide for the accommodation requirements of the ambulance base. This accommodation will include the provision of an office/radio room, kitchenette, universally accessible WC, locker/changing room, seating area & ancillary storage facilities. Associated site works will also include an upgrade to the on-site wastewater treatment plant with the inclusion of a tertiary treatment system & polishing filter, the provision of a single storey ancillary building, upgrades to the existing foul water & stormwater colection systems. Other associated - site works will include 2 number bays for ambulance parking, 2 number car parking spaces & footpaths, ramps & steps to serve the requirements of the building, including universal accessibility. The site is adjacent to the the Maumturk Mountains SAC & the Maumturk Mountains NHA. It is further adiacent to Connemara Bog Complex SAC/SPA & the Twelve Bens/Garraun Complex SAC. A Natura Impact Statement will be provided with the application
For construction of a new dwellinghouse with garage & wastewater treatment system
To erect a 21m high telecommunications monopole (including 3m high omni antenna with an overall height of 24m) together with antennas, dishes, and associated telecommunications equipment, all enclosed by security fencing and remove an existing 15m high monopole
For extension of existing single storey house, upwards and to the sides to create a two storey and single storey house. The proposal involves internal alterations and externally insulating the existing fabric, associated site services and landscaping works including replacement of metal shed. Gross floor space of proposed works: 162.06 sqm, Gross floor space of work to be retained: 101.43 sqm, Gross floor space of any demolition: 1.88 sqm
Chun foirgneamh talmhaíochta, bealach isteach agus clós feirme chomh maith le gach obair eile a bhaineann le tagairt WL/EN24/078 a choinneáil
For the construction of a single storey extension located to the rear (south) of the hotel to accommodate an accessible wc and 2 guest wc’s. Ballynahinch Castle Hotel is a Protected structure.
For the construction of an additional floor over the existing 1990’s River Wing to accommodate 4 bedroom suites with private terraces over looking the river and dormer windows within a mansard roof to the courtyard. Access will be formed via an opening through to the guest corridor constructed in 2017
For the construction of a 170 kW photovoltaic ground mounted solar array consisting of 432 Q-Cell 400 watt panels mounted on lightweight galvanised frames on lands north of the existing staff office. The works include the erection of a timber post and rail fence and a 140 meter long underground trench to connect the solar array to the existing above ground plant room. The works are within the curtilage of Ballynahinch Castle Hotel, a Protected Structure
For the development consisting of refurbishment and upgrading works [including (where necessary) replacement of existing poles along the existing overhead electricity line, minor ground works e.g. replacement or installation of stays, and maintenance or improvement works]; and all associated ancillary works including the provision of temporary accessways. Replacement poles will be constructed at, or immediately adjacent to, the existing structures that they will replace. Replacement poles will have a maximum height of 12m above ground; and be similar in appearance to existing poles. Planning permission is sought for a 10 year period. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
For the re-instatement of a simple gabled stone roof, glazed steel screens within existing openings and insertion of a viewing gallery to the late Medieval Tower House. Recorded Monument (GA036-001001), Recorded Monument (GA036-001002). The subject site is located within the designed landscape of Protected structure Ballynahinch Castle Hotel (RPS: 620). A Natura Impact Statement has been prepared with the application
At Ballynahinch Castle Tower House, Recorded Monuments GA036-00101 - Tower House located on GA036-00102 - Crannog in Ballynahinch Townland. The development will consist of the re-instatement of a natural slate pitched roof, glazed screens to external openings on internal face and stone floor to the single storey 19th Century Lodge under scholarly restoration and the insertion of a zinc flat roof and stone floor within the late Medieval Tower House by retaining the original ruined character using a policy of minimum intervention. A Natura Impact Statement has been prepared with the application. Gross floor space of work to be retained: 75 sqm
For a dwelling house, garage & private wastewater treatment system with all associated works & ancillary services
To construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works.
For retention of existing dwelling house on revised site boundaries well as all associated site services. Gross floor space of work to be retained: 124.00 sqm
To construct a new dwelling house, effluent treatment system and polishing filter as well as all ancillary site works. Gross floor space of proposed works 274.30 sqm
Chun teach cónaithe, garáiste, córas searachais agus gach obair láithreáin ag teastáil. Spás urláir comhlán na n-oibreacha beartaithe: Teach: 209sqm, Garáiste: 60sqm
For the demolition of the existing single storey detached house and the construction of a new single storey detached house, a single storey shed, associated hard and soft landscaping and the provision of a new wastewater treatment system and percolation area. Gross floor space of proposed works: 252.00 sqm. Gross floor space of any demolition: 125.00 sqm
For a ten-year development, this will consist of: i. The felling/removal of some 343 hectares of conifer plantation for the purposes of peatland restoration and the establishment of native woodland. ii. Measures to restore and rehabilitate approximately 281 hectares of Atlantic blanket bog and heathland that is currently planted with lodgepole pine and conifer forests and managed for productive forestry. iii. Conversion of 62 hectares of conifer forestry to native woodland. iv. Main peatland restoration measures will include tree removal, drain blocking (manual and mechanical) and surface smoothing. v. The control of existing invasive species on site and continued control during the restoration works to prevent their spread. vi. Drain-blocking all existing artificial drainage and artificial land drains currently existing within the peatland restoration areas in order to restore the highwater table which is necessary for blanket bog growth. vii. Provision of silt traps at outflows to block the pathway to the Twelve Bens/Garraun Complex Special Area of Conservation. viii. Deer fencing to protect 62 hectares of proposed native woodland. ix. Provision of a Harvest Management Phasing Plan for the proposed project. x. Provision of new internal access road extending to 1.58 km. xi. Across the site there will be 4 no. temporary water-crossings constructed in order to facilitate the harvesting of the timber at the site. xii. Provision of informational signage. xiii. Maintenance of up to 8.23 km of existing forestry roads. xiv. Resurfacing of existing car park to facilitate public access. xv. Installation of water monitoring stations for real time water monitoring during operations. xvi. Cutting of roadside trees to improved sightline visibility at site entrance. xvii. The application is supported by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)
For a ten-year planning permission consisting of: I.) The felling/removal of some 343 hectares of conifer plantation for the purposes of peatland restoration and the establishment of native woodland. ii.) Measures to restore and rehabilitate approximately 281 hectares of Atlantic blanket bog and heathland that is currently planted with lodgepole pine and Sitka spruce forests and managed for commercial forestry. iii.) Conversion of 62 hectares of conifer forestry to native woodland. iv.) Main peatland restoration measures will include tree removal, drain blocking (manual and mechanical) and ground reprofiling. v.) The control of existing invasive species on site and continued control during the restoration works to prevent their spread. vi.) Drain-blocking all existing artificial drainage and artificial land drains currently existing within the peatland restoration areas in order to restore the high water table which is necessary for blanket bog growth. vii.) Provision of silt traps at outflows to block the pathway to the Twelve Bens/Garraun Complex Special Area of Conservation. viii.) Deer fencing to protect 62 hectares of proposed native woodland. ix.) Provision of a Harvest Management Phasing Plan for the proposed project. x.) Provision of new internal access road extending to 1.58 km. xi.) Across the site there will be 4 no. temporary water-crossings constructed in order to acilitate the harvesting of the timber at the site. xii.) Provision of informational signage. xiii.) Resurfacing of up to 8.23 km of existing forestry roads. xiv.) Resurfacing of existing car park to facilitate public access. xv.) Installation of water monitoring stations for real time water monitoring during operations. xvi.) Cutting of roadside trees to improved sightline visibility at site entrance. xvii.) The application is supported by an Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS)
Chun cró beithioch agus chun umar sciodair I gcoir eisiltigh talmhaíochta a thógáil. Tá ráiteas tionchair nádurtha faoi bhráid, maidir leis an tIarratas Pleanála seo
Construct a new rear extension and a new side extension, including all associated site works. Gross floor space of proposed work: 33 sqm
A)partial demolition of existing house; b)single story extension to existing house; c)a new shed and d)all associated site works.Gross floor space of proposed works in 96.00sqm.
For a) demolition of existing porch, b) a single storey side extension to existing house c) all associated site works. Gross floor space of proposed works: 77 sqm. Gross floor space of any demolition: 2.5 sqm
For a) a new wastewater treatment system and b) all associated site works.
For the construction of new domestic garage and removal of enurement clause. Gross floor space of proposed works: 45 sqm
For retention of existing dwelling house.Gross floor space of work to be retained in 204.90sqm.
To (1) demolish existing dwelling house and permission for a replacement dwelling house on revised site boundaries (2) replace existing septic tank and percolation area with a new effluent treatment system and polishing filter as well as all ancillary site works and site services. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works: 229.00 sqm. Gross floor space of any demolition: 112.00 sqm
For dwelling House, Garage & Private Wastewater Treatment System with all associated works and ancillary services. A Natura Impact Statement will be submitted with this application. Gross floor space of works: 249.60 sqm(H), 60.00 sqm(G)
To install new post and wire boundary fencing as well as all ancillary site works. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations 2001 (as amended). Gross floor space of proposed works: 1554m of fencing
Chun sean teach cónaithe a leagan, agus teach nua, córas séarachais agus garáiste. Spás urláir comhlán na n-oibreacha beartaithe: 191 sqm. Spás urláir comhlán d'aon scartáil: 40 sqm
For the construction of a new agricultural shed as well as all associated site works and ancillary services
For extension and alterations to existing dwelling house, for a garage/shed, new residential vehicular access and to replace existing septic tank with a new wastewater treatment system with all associated works and ancillary services. Gross floor space of proposed work: 180.95 sqm
To construct a new dwellinghouse, storage shed & a new effluent treatment system including associated site works. There is a Natura Impact Statement included in this application. Gross floor space of proposed works: 105.94 sqm