to
to

Planning records

Showing 1-9 of 9 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2560087Granted

    Ballykilleen (Edenderry Rural Electoral Division) Kilcumber Cloncant Ballydermot Clonmel Clonbrown Clonroosk Little Clonroosk Big Coolygagan Clonbrock Upper Kilcloncorkry Kilnantoge Lower Kilnantoge Upper and Shean., Co. Offaly

    EirGrid plc, with the consent and approval of the Electricity Supply Board (ESB) is applying to Offaly County Council for permission for works associated with the proposed uprate of the existing 110 kV Overhead Line (OHL) between the existing Cushaling 110 kV substation in the townland of Ballykilleen, Co. Offaly and the existing Portlaoise 110 kV substation in the townlands of Clonminam and Kylekiproe, Co. Laois. The Proposed Development works across the functional area of Co.Offaly will comprise: Replacement (“restringing”) of the existing overhead line circuit conductor with a new higher capacity conductor including installation of a new fibre communication connection; replacement of the existing earthwire with new earthwire between structures 1 and 8; replacement of steel members at 3 no. towers; Full tower painting required at 3 no. locations; replacement of wooden poles only at 7 no. locations; replacement of wooden poles and crossarm at 2 no. locations; replacement of crossarm only at 3 no. locations; replacement of existing danger notices at various locations, as required; replacement of hardware and fittings, such as insulators, insulator hardware, earthwire hardware and anti-climbing guards at various locations, as required; replacement of suspension clamps, vibration dampers & compression assemblies at all locations, as required; All associated temporary site development works to gain access to the existing structures & other temporary associated & ancillary development works required for the purpose of the uprate of the existing circuit. No additional structures are proposed along the existing circuit. Structure 203 will be relocated approx. 101m back towards structure 202 due to its existing position on top of a gravel mound & the potential for subsidence of gravel in the long term. No alteration to the nature, extent, alignment, character or voltage of existing electricity infrastructure is proposed. A Natura Impact Statement (NIS) has been submitted with this application. Full description of all works within Site Notice.Decision record indexed
    Decision16 May 2025View record
  2. © OpenStreetMap
    24153Granted

    BALLYKILLEEN, EDENDERRY, CO. OFFALY

    (A) NEW SINGLE STOREY EXTENSION TO REAR AND SIDE OF EXISTING DWELLING (B) ALTERATIONS TO THE FRONT OF THE EXISTING DWELLING (C) INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM (D) NEW VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision30 January 2025View record
  3. © OpenStreetMap
    23288Granted

    BALLYKILLEEN, EDENDERRY, CO. OFFALY

    THE AS BUILT SIDE AND REAR SINGLE STOREY EXTENSION TO THE ORIGINAL COTTAGE INCLUDING ALL ANCILLARY SERVICES AND SITE WORKSDecision record indexed
    Decision20 March 2024View record
  4. © OpenStreetMap
    2360184Granted

    BALLYKILLEEN, EDENDERRY, CO. OFFALY

    A. New single-storey kitchen Extension to the rear of the existing house. B. All associated site worksDecision record indexed
    Decision16 January 2024View record
  5. © OpenStreetMap
    21291Granted

    BALLYKILLEEN, EDENDERRY, CO. OFFALY

    DEVELOPMENT AT EDENDERRY POWER PLANT. EDENDERRY POWER LIMITED CURRENTLY HAS PLANNING PERMISSION TO OPERATE EDENDERRY POWER PLANT AS A PEAT AND BIOMASS CO-FIRED POWER PLANT UNDER GRANT OF PLANNING PERMISSION (OFFALY COUNTY COUNCIL REGISTER REFERENCE - PL2/15/129, AN BORD PLEANÁLA REGISTER REFERENCE - PL 19.245295). THE PROPOSED DEVELOPMENT WILL CONSIST OF THE CONTINUED OPERATION OF EDENDERRY POWER PLANT FROM THE BEGINNING OF 2024 TO THE END OF 2030 EXCLUSIVELY USING SUSTAINABLE BIOMASS FUEL. THE APPLICANT PROPOSES TO INCREASE THE VOLUME OF BIOMASS CONSUMED AT THE FACILITY FROM A CURRENT MAXIMUM OF 300,000 TO 530,000 TONNES PER ANNUM. IT IS PROPOSED TO UTILISE THE EXISTING PERMITTED ELECTRICITY GENERATION STATION AND INFRASTRUCTURE, INCLUDING FUEL HANDLING SYSTEMS, UTILITIES, PROCESSING SYSTEMS AND ANCILLARY STRUCTURES AS PART OF THE PROPOSED DEVELOPMENT. THERE WILL BE NO CHANGE TO EXISTING INFRASTRUCTURE PRESENT ON-SITE. SITE ACCESS AND EGRESS WILL USE THE EXISTING PERMITTED SITE ENTRANCES TO THE R401 PUBLIC ROAD. THERE WILL BE NO CHANGE TO THE PERMITTED BOUNDARY OF THE FACILITY. EDENDERRY POWER PLANT IS LICENCED BY THE ENVIRONMENTAL PROTECTION AGENCY UNDER AN INDUSTRIAL EMISSIONS (IE) LICENCE [REF. P0482-04]. ACTIVITIES AT THE FACILITY AND ASSOCIATED ENVIRONMENTAL ASPECTS AND EMISSIONS WILL CONTINUE TO BE REGULATED AND CONTROLLED BY THE EPA. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR). THE PLANNING APPLICATION IS ALSO ACCOMPANIED BY A NATURA IMPACT STATEMENT (NIS)Decision record indexed
    Decision25 March 2022View record
  6. © OpenStreetMap
    21576Granted

    BALLYKILLEEN, EDENDERRY, CO. OFFALY

    CONSTRUCTION OF A TWO-STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKSDecision record indexed
    Decision10 March 2022View record
  7. © OpenStreetMap
    2088Granted

    BALLYKILLEEN CROSS BALLYKILLEEN, EDENDERRY, CO. OFFALY

    (A) A GARAGE FOR DOMESTIC USE AND (B) FRONT BOUNDARY WALL AND ENTRANCEDecision record indexed
    Decision29 June 2020View record
  8. © OpenStreetMap
    19527Granted

    BALLYKILLEEN, EDENDERRY, CO OFFALY

    (A) (I) SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING HOUSE COMPRISING OF 61.4 SQ/M (II) PORCH AREA TO FRONT OF DWELLING COMPRISING OF 3.9 SQ/M (III) EXTERNAL GYM AREA COMPRISING OF 24 SQ/M (IV) EXTERNAL STUDY/ LIBRARY AREA COMPRISING OF 33 SQ/M (V) EXTERNAL UTILITY ROOM COMPRISING OF 2.8 SQ/M (VI) EXTERNAL TOILET ROOM COMPRISING OF 1.6 SQ/M (VII) UPGRADING OF EXISTING WASTEWATER TREATMENT SYSTEM & PERCOLATION AREA (B) PLANNING PERMISSION FOR SINGLE STOREY EXTENSION TO THE SIDE OF THE EXISTING DWELLING HOUSE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision24 February 2020View record
  9. © OpenStreetMap
    19606Refused

    BALLYKILLEEN SHEAN KILCUMBER CLONCANT & CUSHALING, EDENDERRY, CO OFFALY

    A 10-YEAR PLANNING PERMISSION WITH A 30-YEAR OPERATIONAL LIFE FOR DEVELOPMENT ON A SITE AREA OF 60.674 HECTARES. THE DEVELOPMENT WILL CONSIST OF UP TO 8 (EIGHT) WIND TURBINES WITH A TIP HEIGHT OF UP TO 187 METRES, AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS; APPROXIMATELY 4,750 METRES OF NEW INTERNAL ACCESS ROADS, ASSOCIATED DRAINAGE AND TURNING AREAS; UPGRADE OF APPROXIMATELY 3,500 METRES OF THE EXISTING L50062 PUBLIC ROAD INCLUDING UPGRADE OF THE EXISTING BRIDGE; A NEW BRIDGE CROSSING OF THE FIGILE RIVER TO PROVIDE ACCESS BETWEEN TURBINE 3 AND TURBINE 4; A 2,950-METRE RECREATION TRAIL AND ALL ASSOCIATED DEVELOPMENT TO INCLUDE GRAVEL PATHWAYS, A FOOTBRIDGE ACROSS THE FIGILE RIVER, A PARKING AREA, SIGNAGE, INFORMATION BOARDS AND OUTDOOR FITNESS EQUIPMENT; AN OFF-SITE ELECTRICAL SUBSTATION AND A BATTERY ENERGY STORAGE FACILITY; ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING TO CONNECT THE TURBINES TO THE SUBSTATION INCLUDING APPROXIMATELY 1,550M ALONG THE R401 REGIONAL ROAD; A SPOIL STORAGE AREA; A PERMANENT METEOROLOGICAL MAST UP TO 110.5 METRES HIGH; 2 NO. TEMPORARY CONSTRUCTION COMPOUNDS; 2 NO. TEMPORARY BLADE ADAPTER SET-DOWN AREAS WITHIN THE WIND FARM SITE AND AT THE JUNCTION OF THE R402 AND R401 AT RATHMORE, EDENDERRY, CO. OFFALY; TURBINE DELIVERY ROUTE WORKS INCLUDING WIDENING OF THE JUNCTION OF THE R420 AND R402 AT BALLINA, GEASHILL, CO. OFFALY AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE OVERALL DEVELOPMENT IS FOR A NINE (9) TURBINE WIND FARM, WITH A SEPARATE PLANNING APPLICATION BEING SUBMITTED TO KILDARE COUNTY COUNCIL FOR ONE (1) TURBINE LOCATED IN THE TOWNLAND OF TICKNEVIN, CARBURY, CO. KILDARE. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED IN RESPECT OF THE APPLICATIONGrounds not yet categorised
    Decision21 February 2020View record
Showing 1-9 of 9