to
to

Planning records

Showing 1-5 of 5 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    24/111Granted

    Ballylicky Bantry Co. Cork

    Permission for split-level dwelling, detached domestic garage, wastewater treatment system and associated siteworksDecision record indexed
    Decision03 October 2024View record
  2. © OpenStreetMap
    24/265Granted

    Gortagarry Ballylicky Bantry Co. Cork

    Permission for retention of relocation of vehicular entranceDecision record indexed
    Decision09 July 2024View record
  3. © OpenStreetMap
    23/581Granted

    Ballylicky Bantry Co. Cork

    (i) Permission for retention of commercial storage shed, internal access road and hardstanding constructed in lieu of permitted shed under Planning Ref. No. 20/428, (ii) Retention of two side entrances and (iii) Permission for construction of retaining wallDecision record indexed
    Decision15 April 2024View record
  4. © OpenStreetMap
    23/424Granted

    Ballylicky Bantry Co. Cork

    Permission for 1.) Retention of Construction of garage to replace previous garage, demolition of existing rear extensions, construction of a rear extension and roof dormers, alterations to elevations and site works including new access road to provide for parking. 2.) Permission for new site entrance to L-97109-0 and to close off existing entrance to N71 serving dwelling along with all associated site worksDecision record indexed
    Decision10 April 2024View record
  5. © OpenStreetMap
    21/737Granted

    Derreenacrinnig West, Barnagowlane West, Glanareag Ards Beg, Ardrah, Laharanshermeen, Maulraha, Maulikeeve, Derryarkane, Cappanaboul, Skahanagh, Gortroe, Shandrum Beg, Shandrum More, D

    Development will consist of; The application will seek permission to remove the existing grid connection works and for the development of the full length of a new grid connection over a distance of approximately 14.8km, between the existing Ballylicky ESB substation and the permitted Derreenacrinnig West Windfarm. The proposed development involves the following works: (a) removal of approximately 9.5 km of 20 kV overhead line (OHL) along the route, the OHL to be removed consists of 138 wood poles (ranging from 9m to 12.5m above ground), supporting electrical conductor lines and ancillary structures and equipment (b) following removal of the OHL, it is proposed to construct approximately 10.8 km of 20 kV overhead line (OHL) along the route, the OHL to be constructed consists of c. 157 wood poles (ranging from 9m to 12.5m above ground), supporting electrical conductor lines and ancillary structures and equipment. (c) installation of approximately 4 km of underground cable ducting and associated electrical cabling, and all other ancillary works including joint bays, culverts, marker posts and all associated developments. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the planning authority with the application.Decision record indexed
    Decision18 October 2022View record
Showing 1-5 of 5
PreviousPage 1 of 1Next