The proposed development will consist of a.) a full decommissioning and removal of existing 0.8MW Wind Turbine b.) Construction of a new 2.35MW Wind Turbine with a hub height of 58.9 metres, a rotor diameter of 82 metres and an overall tip height of 99.9 metres c.) wind turbine foundation d.) hardstanding area e.) underground electrical cables and f.) all associated site works. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with application the application.Decision record indexed
The development will consist of the construction of 2.99acres/1.21ha or 1.6MW of Photovoltaic panels on ground mounted frames within a site area located to the south of the main production facility, associated ancillary cabling and ducting, electrical infrastructure, LV/MV Skid, transformer cabin and internal access tracks together with all associated site works.Decision record indexed
CONSTRUCT 80 NUMBER DWELLINGS CONSISTING OF FOUR 4 BEDROOM TWO STOREY SEMI-DETACHED HOUSES, SIXTY 3 BEDROOM TWO-STOREY SEMI-DETACHED HOUSES, TEN 2 BEDROOM TWO-STOREY TERRACED HOUSES IN TWO BLOCKS OF FIVE, AND SIX 2 BEDROOM SINGLE STOREY BUNGALOWS, AN ESB SUBSTATION AND ALL ASSOCIATED SITE WORKSDecision record indexed
(A) DEMOLISH FRONT PORCH AREA AND REAR SHEDS (B) CONSTRUCT EXTENSIONS TO THE FRONT AND REAR OF THE DWELLING HOUSE INCLUDING ELEVATIONAL CHANGES (C) CONVERT EXISTING ATTACHED GARAGE TO DWELLING SPACE (D) CONSTRUCT A DOMESTIC STORAGE SHED/GARAGE(E) CONSTRUCT NEW ENTRANCE PILLARS AND WINGWALLS (F) RELOCATE EXISTING AGRICULTURAL ENTRANCE AND (G) ALL ASSOCIATED SITE WORKSDecision record indexed
RETAIN DWELLING HOUSE AND GARAGE AS CONSTRUCTED AND PLANNING PERMISSION TO (A) DEMOLISH EXISTING GARAGE AND PERMISSION TO CONSTRUCT A NEW GARAGE (B) CONSTRUCT A TWO STOREY EXTENSION TO THE SIDE OF THE EXISTING HOUSE (C) INSTALL A MECHANICAL TREATMENT UNIT, INTERMITTENT FILTER AND POLISHING FILTER (D) CONSTRUCT CAR PARKING AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCT A NEW RECEPTION EXTENSION AT GROUND FLOOR, NEW EXTENSION AT FIRST FLOOR ON THE EAST ELEVATION OF THE EXISTING FACILITY, INFRASTRUCTURE INCLUDING CAR PARKING AND ALL ASSOCIATED SITE WORKSDecision record indexed