to
to

Planning records

Showing 1-3 of 3 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    22394Granted

    BUNGLASHA SOUTH, GLENCAR, CO KERRY

    RETAIN THE EXISTING TELECOMMUNICATIONS EQUIPMENT ATTACHED TO AN EXISTING TELECOMMUNICATION SUPPORT STURCTURE. THE DEVELOPMENT WILL CONTINUE TO PROVIDE HIGH SPEED WIRELESS BROADBAND AND DATA SERVICESDecision record indexed
    Decision28 March 2023View record
  2. © OpenStreetMap
    211431Granted

    BUNGLASHA SOUTH, GLENCAR

    RETAIN ALTERATIONS AND EXTENSION TO HOUSE AND PERMISSION TO COMPLETE THE ALTERATIONS AND EXTENSION AND TO REPLACE THE EXISTING SEPTIC TANK WITH AN EFFLUENT TREATMENT TANK AND POLISHING FILTERDecision record indexed
    Decision15 February 2022View record
  3. © OpenStreetMap
    21635Granted

    CURRAFLUGH DROM EAST BUNGLASHA SOUTH, DROMDOORY CAPPYANTANVALLY DREENAGH AND KEEL, CO KERRY

    DEVELOPMENT ALONG A 4.6KM LONG SECTION OF AN EXISTING 20KV OVERHEAD ELECTRICITY LINE (REFERRED TO AS "THE GLENCAR LINE") LOCATED BETWEEN STRUCTURES 143 TO 196 INCLUSINVE. THE DEVELOPMENT CONSISTS OF REFURBISHMENT AND UPGRADING WORKS INCLUDING (WHERE NECESSARY) REPLACEMENT OF EXISTING POLES, AND THE PROVISION OF 2 NO. NEW POLES, ALONG THE EXISTING OVERHEAD ELECTRICITY LINE. REPLACEMENT POLES WILL BE CONSTRUCTED AT, OR IMMEDIATELY ADJACENT TO THE EXISTING STRUCTURES THAT THEY WILL REPLACE. REPLACEMENT AND NEW POLES WILL HAVE A MAXIMUM HEIGHT OF 12M ABOVE GROUND; AND BE SIMILAR IN APPEARANCE TO EXISTING POLES. ADDITIONAL UPGRADE WORKS WILL INCLUDE: INSTALLATION OF STAYS; REPLACEMENT OF EXISTING EQUIPMENT E.G. HEADGEAR, INSTALLATION OF ADDITIONAL EQUIPMENT; INSTALLATION OF A NEW 3 PHASE CONDUCTOR ALONG THE FULL LENGTH OF THE LINE; AND ALL ASSOCIATED ANCILLARY WORKS INCLUDING THE PROVISION OF TEMPORARY ACCESSWAYS. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED WITH THIS APPLICATIONDecision record indexed
    Decision05 August 2021View record
Showing 1-3 of 3
PreviousPage 1 of 1Next