Showing 1-9 of 9 public recordsDemolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Demolition of the existing single storey house of 'Erganagh' and the construction of a two storey data centre and delivery bays with associated three storey office block and services that will have a gross floor area of 35,426sq.m on an overall site of 9.2 hectares. The two storey data centre facility and delivery bay (32,419sq.m) will be separated into two adjoined blocks over two floors with a single data hall on each floor of each data centre with service and technical space around each data hall (4 data halls overall) with a two storey delivery bay attached to the east of the data centre block. A three storey office block and delivery bay (2,882sq.m) is attached to the west of the data centre block. The data centre will be served by services and plant to the north of the data centre blocks that will include 32 standby generators with 2 associated flues per generator (64 in total) and grouped into 16 towers of flour flues each (each 20m high). There are proposed to be 32 acoustically attenuated chillers located on the upper level plant gantries to the north of the data hall blocks (eight on each gantry). The development will also include a new substation with associated transformer yard and single storey transformer building (125sq.m) that will be located to the northeast of the site. The development will be accessed from the Grange Castle South Access Road from the north via the Baldonnel Road and will also include ancillary site development works, including 2 attenuation ponds, to connect to existing Grange Castle infrastructural services as well as fencing, signage, services road, entrance gate, 70 car parking spaces including 3 disabled car parking spaces, and 30 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west all on a site (9.2ha) located within lands in the Grange Castle Business Park South and the residential properties of Erganagh, Kent Cottage and Weston Lodge on land with the townlands of Aungierstown and Ballybane; Ballybane; and Milltown and bounding Baldonnel Road to the west and south and Grange Castle South Access Road to the north, Baldonnel, Dublin 22. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.
Change of house plans of two storey private dwelling in side garden of existing family home; Re-Arrangement of existing entrance to provide required access to public road; Installation of waste water treatment system to required detail as granted under Reg. Ref. SD20A/0200; Building of private garage - floor area 49sq.m on western side of proposed dwelling.
The provision of an amended junction and new link road from the existing Clonlara Road to the currently undeveloped lands with Enterprise and Employment zoning objective South of the Camac River and Nort of the N7 National Route. Interim measures are included within the application to block access to the new road until such time as the undeveloped lands are developed. All associated landscaping, infrastructure and site development works to facilitate the development.
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Two storey dwelling in side garden of existing family home using existing entrance to provide access to public road. Installation of waste water treatment system to required detail.
Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215.
The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application.