The construction of a new dwelling house, new garage, new effluent treatment system and all associated site development worksGrounds not yet categorised
The construction of a new dwelling house, double garage, car port, wastewater treatment system, stormwater soakaways, new vehicular entrance and all associated site worksDecision record indexed
A CHANGE OF USE FROM A DOMESTIC GARAGE TO A DWELLING HOUSE SERVICED BY AN EXISTING ON SITE EFFLUENT TREATMENT SYSTEM PREVIOUSLY APPROVED ON FOOT OF PLANNING FILE REFERENCE PL2/00/672 AND PL2/01/1224. PERMISSION FOR A USE OF AN EXISTING VEHICULAR ENTRANCE PREVIOUSLY APPROVED ON FOOT OF PLANNING REFERENCE PL2/00/672 AND PL2/01/1224 WHICH IS PROPOSED TO BE USED AS A SHARED ENTRANCE WITH ADJACENT HOUSE TO THE EAST AND TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS CARRIED OUT TO FACILITATE DEVELOPMENTDecision record indexed
AN EXISTING SEPTIC TANK ON THE PROPOSED REVISED & REDUCED SITE WHICH SERVES THE EXISTING TWO STOREY DWELLING HOUSE. PERMISSION TO REVISE SITE BOUNDARIES, REDUCE SITE AREA & ALTER SITE ENTRANCE TO PROVIDE FOR A SHARED ENTRANCE WITH ADJACENT SITE TO THE WEST, WHICH PROPOSED REVISIONS ALL DIFFER FROM THAT PREVIOUSLY APPROVED ON FOOT OF PLANNING FILE REFERENCE PL2/00/672 & PL2/01/1224 & TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS REQUIRED TO FACILITATE DEVELOPMENTDecision record indexed
An existing glazed porch to the front (north) elevation of the existing dwelling house, retention of an existing glazed porch to the rear (south) elevation of the existing dwelling house, retention of existing standalone metal clad ancillary and fuel storage shed and retention of all associated site development works.Decision record indexed
HOUSE AS CONSTRUCTED AND PERMISSION TO COMPLETE HOUSE TO INCLUDE A SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS. THE DEVELOPMENT WILL ALSO CONSIST OF RETENTION PERMISSION FOR GARAGE AND FUEL STORE AS CONSTRUCTED AND PERMISSION TO INSTALL ROOF LIGHTS AND ALL ASSOCIATED SITE WORKS. PREVIOUS GRANTED PLANNING PERMISSION REFERENCE PL2/05/537Decision record indexed
THE CONSTRUCTION OF A SINGLE STOREY DWELLING HOUSE, SINGLE STOREY GARAGE, SEPTIC TANK WITH PERCOLATION AREA, NEW ENTRANCE AND ALL ASSOCIATED SITE WORKSDecision record indexed
(A) DOMESTIC STORAGE SHED AS CONSTRUCTED (B) DOMESTIC GARAGE AS CONSTRUCTED AND FOR PLANNING PERMISSION FOR NEW SITE BOUNDARY AND ASSOCIATED SITE WORKSDecision record indexed
REAR EXTENSION TO DWELLING HOUSE, DOMESTIC GARAGE, SITE ENTRANCE AND ASSOCIATED SITE WORKS AS CONSTRUCTED. PERMISSION FOR CONSTRUCTION OF EXTENSION TO EXISTING DWELLING HOUSE AND ASSOCIATED SITE WORKSDecision record indexed
(1) demolition of 2 no. existing agricultural farm buildings; (2) change of use of 2 no. stone outbuildings into 2 no.1-bed self catering tourist accommodation cottages, (3) change of use of a disused agricultural building to accommodate plant, laundry, amenity building and private workshop & storage (4) Change of use of a disused agricultural building into a Sauna & Changing Places Accessible toilet (5) Change of use of disused agricultural building to bike shed (6) relocation of existing farm entrance to provide entrance for tourist accommodation cottages; (7) car-parking; (8) new wastewater treatment system & percolation area; (9) soakaways and (10) all associated refurbishment, landscaping and all ancillary site works.Decision record indexed
THE CONSTRUCTION OF A NEW SINGLE DWELLING CONSISTING OF A SINGLE STOREY AND STOREY-AND-A-HALF BUILDING, SEPARATE GARAGE, A NEW ENTRANCE AND DRIVEWAY, NEW HEDGE AT BOUNDARY, NEW SEPTIC TANK, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, SOAKAWAYS, BORED WELL AND ALL ASSOCIATED SITE WORKSDecision record indexed
THE CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING, DOMESTIC OUTBUILDING, A BORED WELL, A PROPOSED SEPTIC TANK WITH PERCOLATION AREA, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCEGrounds not yet categorised
KILLINA PRESENTATION SECONDARY SCHOOL KILLINA, RAHAN, CO. OFFALY
A TWO-STOREY EXTENSION TO THE REAR OF THE EXISTING SCHOOL BUILDING, CONSISTING OF A SPECIAL NEEDS UNIT, SIX ADDITIONAL CLASSROOMS AND ANCILLARY ACCOMODATIONS. THE PROPOSED DEVELOPMENT WILL ALSO CONSIST OF A NEW HARD PLAY AREA OVER AN EXISTING BASKETBALL COURT, TWO BALLCOURTS IMMEDIATELY TO THE NORTH OF THE MAIN SCHOOL CARPARK, ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
I. A STEEL-FRAMED METAL SHED AS CONSTRUCTED, AND PERMISSION FOR THE CONSTRUCTION OF NEW INTERIOR PARTITION WALLS AND TOILETS THERIN. II. PERMISSION FOR THE CONSTRUCTION OF A NEW STEEL-FRAMED COVERED WALKWAY LINK. III. ALL ASSOCIATED SITE WORKSDecision record indexed
THE CONSTRUCTION OF 1 NO. TEMPORARY ACCOMMODATION PREFABRICATED CLASSROOM BUILDING COMPRISING OF 3 NO. CLASSROOMS TO THE CENTRAL COURTYARD OF EXISTING SCHOOL, CONNECTIONS TO EXISTING SITE SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF EXISTING SINGLE STOREY DERELICT COTTAGE, THE CONSTRUCTION OF A NEW SINGLE DWELLING CONSISTING OF A SINGLE STOREY AND STOREY-AND-A-HALF BUILDING., SEPARATE GARAGE, REFURBISHMENT OF AN EXISTING STONE SHED, NEW ENTRANCE AND DRIVEWAY, NEW HEDGE AT BOUNDARY, NEW SEPTIC TANK, WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREA, SOAKAWAYS, BORED WELL AND ALL ASSOCIATED SITE WORKSDecision record indexed
A proposed new single storey dwelling, new vehicular entrance, proposed new well, waste water treatment system, storm water soakaways and all associated site worksGrounds not yet categorised
CONSTRUCTION OF ONE NUMBER DETACHED DWELLING AND ONE NUMBER DETACHED GARAGE AND TO INSTALL A NEW ENTRANCE TO PUBLIC ROAD, A PRIVATE WELL AND A PACKAGED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKSDecision record indexed
Alterations and part demolition to existing dwelling and construction of new extension to side of existing dwelling as well as all associated site worksDecision record indexed
Alterations and part demolition to existing dwelling and construction of new extension to rear requiring demolition of existing rear extension as well as all associated site worksDecision record indexed
Construction of a single storey extension to an existing school comprising classroom accommodation together with additional parking, upgraded drainage & related worksDecision record indexed
RECONSTRUCTION AND EXTENSION TO THE EXISTING COTTAGE AND INSTALLATION OF TERTIARY TREATMENT SYSTEM AND INFILTRATION/TREATMENT AREA AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
THE CONSTRUCTION OF A TWO STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKSGrounds not yet categorised
THE CONSTRUCTION OF A TWO STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKSDecision record indexed
Withing the townlands of Agall and Glaskill, Screggan, Co. Offaly
For development at this site Agall Quarry, currently permitted under planning references ABP 19.SU.0131 and ABP 19.QD.008 which is located within the Townlands of Agall and Glaskill. The development will consist of further quarry development concerning an authorised quarry, registered as QY28, authorised under substitute consent ABP Ref. 19.SU.0131 and extended under ABP Ref. 19.QD.0008 to include: 1. Extension of the area of the quarry into known aggregate reserves by circa 6.96ha to a depth of 63mAOD. 2. Provision of boundary berms, planting and landscaping generally to the north-west of the proposed extension area together with security fencing; 3. Provision of an access route to the new extraction areas; 4. Re-commencement of quarrying works within circa 3.81ha of the lands subject to substitute consent under ABP Ref. 19.SU.0131 to a depth of 63mAOD, 2m deeper than existing quarry floors permitted under ABP Ref. 19.QD.0008; 5. Continuance of use of existing established pit infrastructure (including mobile processing plant, machinery, fixed plant and associated sheds, vehicular entrance, office/welfare facilities, stockpiling areas, water supply, carpark, wheel wash, haul routes and other ancillary infrastructure); 6. Phased restoration of the site; 7. All associated and ancillary works, including dry screening and short-term stockpiling of aggregates, over an application area of 17 ha; 8. A planning permission of 30 years is being sought for the completion of the proposed development. Accordingly, this permission also seeks to amend Condition 3 of ABP Ref. 19.QD.0008 to facilitate the continuation of use of established pit infrastructure for a period of 30 years from the date of any permission for the proposed development. An Environmental Impact Assessment Report (‘EIAR’) will be submitted to the Planning Authority with the applicationGrounds not yet categorised
THE CONSTRUCTION OF A NEW THREE BEDROOM ONE STOREY DWELLING HOUSE, NEW VEHICULAR ENTRANCE, NEW EFFLUENT TREATMENT SYSTEM, EXISTING DERELICT HOUSE TO BE DEMOLISHED AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
Construction of a new cattle shed with loose bedding area, underground slatted slurry storage, ancillary concrete and associated site worksDecision record indexed
CONSTRUCTION OF A NEW SINGLE STOREY DWELLING, NEW VEHICULAR ENTRANCE, DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS, AND ALL ASSOCIATED SITE WORKSDecision record indexed
The construction of a dwelling house, detached domestic garage, new site entrance, installation of wastewater treatment system with percolation area and all associated site worksDecision record indexed