to
to

Planning records

Showing 1-6 of 6 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    24/5503Granted

    Polnareagha, Ardskeagh, Tullacondra, Croughta Kilmaclenine, Ballyclogh, Knockaunavaddreen, Copestown, Ballybeg, Baltydaniel East Twopothouse, Caurraghakerry, Co. Cork

    The Applicant is seeking permission for the construction, operation and decommissioning of a wind energy development including: • 9 wind turbines each with a blade tip height of 175 metres, rotor diameter of 150 metres, hub height of 100 metres and a rated output of 4.5 megawatts. • Turbine Foundations, crane pad hardstanding areas and associated drainage. • Upgrade of existing site tracks and construction of new site tracks and associated drainage. • Access from the local road L5302 at Crought, Ballyclogh including a new site entrance for the construction phase and upgrading of an existing entrance for the operational phase. • An on-site 38 kilovolt electrical substation to Electricity Supply Board Networks specification to include control building with electrical infrastructure, welfare facilities supplied by rainwater harvesting and storage tank, a wastewater holding tank with high level alarm, car parking, security fencing and lighting, and all associated infrastructure, services, and site works including a temporary construction compound. • All associated underground electrical and communications cabling connecting the turbines to the proposed electrical substation. • A temporary site construction compound and associated ancillary infrastructure including welfare services, office accommodation, parking, fencing, lighting etc. • Areas for temporary storage of excavated materials. • A permanent meteorological mast of 100 metres height above ground level on a concrete base. • Installation of approximately 13.5 kilometres of 38 kilovolts underground electrical cabling, mainly within the public road, between the proposed wind farm substation to the boundary of Mallow 110 kilovolt substation at Saint Joseph’s Road Mallow. • All associated site works including site clearance and ancillary development including site drainage/Sustainable Drainage System, security gates, fencing, permanent and temporary signage, and biodiversity mitigation and enhancements, including hedgerow planting. The Applicant is seeking a 10-year duration planning permission and 35-year operational period from the date of overall commissioning of the entire wind farm. The Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.The wind farm development is proposed on a site in the townlands of Polnareagha and Ardskeagh (Templemary E.D.); and Tullacondra and Croughta, (Kilmaclenine E.D.), County Cork. The proposed grid connection will be installed underground mainly within the public road from the wind farm site at Croughta, Ballyclogh to the boundary of the 110 Kilovolts substation at Saint Joseph’s Road, Mallow passing through the townlands of Kilmaclenine, Croughta, Knockaunavaddreen, Copestown, (Kilmaclenine E.D.), Ballybeg (Buttevant E.D.), Baltydaniel East, Twopothouse, and Caurraghakerry (Caherduggan E.D); and Cloghlucas North, Curraghphadeen, Ballyviniter Upper, Ballyviniter Middle, Ballyviniter Lower, Parkadallane, Carrigoon More and Carrigoon Beg Mallow Rural E.D.).Decision record indexed
    Decision22 May 2025View record
  2. © OpenStreetMap
    23/6213Granted

    Ballybeg Buttevant Co. Cork

    The development consists of an existing telecommunication support structure (previously granted permission under An Bord Pleanála Ref. PL04.235069) together with antennas, dishes, equipment cabinets, fencing and all associated site development works. The development will continue to provide high speed wireless broadband and data services.Decision record indexed
    Decision08 January 2024View record
  3. © OpenStreetMap
    22/5083Granted

    Ballybeg East Buttevant Co Cork

    (A) Demolish existing extension to original dwelling house along with existing outbuildings and hay barn, (B) Construct an extension to the existing dwelling house with elevational changes, (C) Decommission existing septic tank system and install new mechanical aeration unit with percolation system and all associated site works.Decision record indexed
    Decision19 September 2022View record
  4. © OpenStreetMap
    21/4784Granted

    Ballybeg Middle Buttevant Co. Cork

    Permission for Retention of existing dwelling house (change of layout from that previously granted under Planning Reg. No. 75/245), rear extension and revised vehicular access location and permission for decommissioning existing septic tank and installation of new packaged wastewater treatment system and polishing filter.Decision record indexed
    Decision24 March 2022View record
  5. © OpenStreetMap
    21/6287Granted

    Ballybeg Buttevant Co. Cork

    To construct a detached two storey dwelling, domestic garage, site waste water treatment unit with percolation area, new vehicular entrance and all associated site works.Decision record indexed
    Decision07 December 2021View record
  6. © OpenStreetMap
    21/6532Granted

    Ballybeg West Buttevant Co. Cork

    Retention of existing telecommunications support structure (previously granted permission under Pl. Ref. 06/9098) together with antennas, dishes, equipment cabinets, fencing and all associated site development works. The development will continue to provide high speed wireless broadband and data services.Decision record indexed
    Decision05 November 2021View record
Showing 1-6 of 6
PreviousPage 1 of 1Next