For a period of 10 years for a development at this site situated in the townlands of Acragar, Ballyconra, Ballycuddihy, Ballyroe, Ballyroe (Grace), Ballyroe (Maher), Baunaniska, Boherkyle, Briskalagh, Brittas, Clone, Coolnapisha, Curraghduff, Freshford, Freshford Lots, Graigueswood, Grange, Huntstown, Kilmanagh, Knockeenglass, Knockown, Moatpark, Monabrika, Monavadaroe, Moneenaun, Oldtown, Oldtownhill, Parksgrove, Picketstown, Rathealy, Sart, Sweethill, Tobernapeastia, Tullaroan, Upperwood Demesne, Co. Kilkenny. The development will consist of the provision of the following: i. 7 no. wind turbines with an overall turbine tip height of 185 metres; a rotor blade diameter of 163 metres; and hub height of 103.5 metres, and associated foundations and hard-standing areas; ii. A permanent 38kV substation compound (control building with welfare facilities, all associated electrical plant and apparatus, security fencing, underground cabling, storage containers, wastewater holding tank, site drainage and all ancillary works); iii. Permanent underground electrical (38kV) and communications cabling to the existing Ballyragget 110kV substation in the townland of Moatpark (including joint bays, communication and earth sheath link chambers and all ancillary works along the route). This cabling route is primarily located within the public road corridor which includes a Protected Structure (Kilkenny RPS Ref. C886); iv. Underground electrical (33kV) and communications cabling connecting the wind turbines and meteorological mast to the on-site substation; v. 3 no. temporary construction compounds (including site offices and welfare facilities); A meteorological mast with a height of 30 metres, security fencing and associated foundation and hard standng area; vii. A new temporary site entrance on the L1009; viii. A new gated site entrance on the L5024; ix. Upgrade of existing site tracks/ roads and provision of new site access roads, junctions and hardstand areas; x. A borrow pit; xi. Spoil Management; xii. Tree felling and hedgerow removal; xiii. Biodiversity Management and Enhancement Plan measures (including establishment of a riparian buffer and hedgerow enhancement); xiv. Site Drainage; xv. Operational Stage site signage; and xvi. All ancillary works and apparatus. A thirty five-year operational life from the date of full commissioning of the wind turbines and subsequent decommissioning of the wind turbines is being sought. An Environmental IGrounds not yet categorised
For the construction of a lean-to-type shed with slatted tank, conversion of an existing loose house to a cubicle house and associated site worksDecision record indexed
For a single storey private residence, detached garage, vehicular entrance and driveway, wastewater treatment system and polishing filter and all associated site works on lands locatedDecision record indexed