Planning records
Showing 1-50 of 33,605 public recordsRetention permission is sought for: Part (104 sq.m gross) of the first floor currently in light industrial use at Unit 5-9: Enlargement of ground floor window at Unit 5-9 on the north elevation enlargement of first floor windows at Unit 5-9 on the south elevation. Planning permission is sought for: (i)The change of use of Unit 4 (of 292.5 sq.m), including that part at first floor (104 sq.m) for which retention permission is sought, from light industrial use to office based industry use and amalgamation of Unit 4 with Unit 5-9 (1,505 sq.m gross) to provide a single office based industry unit of 1,797.5 sq.m gross together with all associated and ancillary works, including internal fit-out. (ii) At the south elevation of Unit 4: a. At ground floor, existing door, external shutter box, all supports and electrics to be removed and to be replaced with a new glazed door unit, and existing roller shutter door and all supports/electrics to be removed and replaced with new window unit. b. At first floor, 2 no. new aluminium/glass windows. (iii) 4 no. bicycle parking spaces, including provision for cargo bike.
Erection of a 6000mm high totem style site sign for the Turnpike Business Park; the totem will be 1800mm wide x 250mm deep in plan, including lettering/numerals and illuminated elements to it's north and south sides and will be located at the east boundary of the site near the site entrance; associated works.
The installation of a 1.62m x 0.87m x 0.5m (HxWxD) gas pressure reduction unit and 3.25m (H) vent stack, with all ancillary services and associated site works.
Amendment to previously permitted planning for change of use of part of existing industrial unit to motor showroom, Reg. SD19A/0199 (floor area of additional change of use 130sq.m).
A) Retention permission for the retention of the existing 45m high monopole telecommunications support structure together with all associated antennas, dishes, RRU’s, cabling and equipment to include ground based equipment all enclosed in security fencing. (Permission previously granted under SD12A/0152 on a 5 year temporary permission) and B. Permission for the addition of support steelwork at the top section of the 45m high monopole telecommunications support structure to accommodate ComReg receive antennas, dish, and radio receiver together with associated works bringing the overall equipment height to 48.44m (49.45m including lightning finial)
Extension to rear.
Extension to rear.
2 new signs at site entrance featuring company logo; 5 new signs on building facade featuring company logo and name; 2 Totem signs featuring company logo and opening times etc; all associated site works.
Provision of off licence subsidiary to the main retail use.
Erect 775.46sq.m or 289.80 kWp of photovoltaic panels on the roof of storage building with all associated site works.
Two side-facing Velux windows on the front dormer and a Velux window on the front roof slope. New front-facing fenestration on the front dormer. A new dormer to the rear at attic level. A flat-roof single storey extension to the rear.
(i) Demolition of existing ancillary outbuildings and removal of front boundary treatment to Turnpike Road; (ii) alterations to existing single-storey cottage including demolition of existing front porch, partial demolition to the side/south of the original building, partial demolition of non-original rear extension and replacement of rear pitched roof with a flat roof; (iii) change of use of the cottage from residential to commercial use providing a reception area, coffee shop, multi-purpose studio, changing rooms and associated facilities; (iv) construction of 3 no. enclosed padel courts within 2 no. single-storey structures to the rear of existing cottage; (v) provision of 17 no. car parking spaces (including 1 no. accessible space), 15 no. bicycle parking spaces and refuse/storage facilities; (vi) provision of a new 6.0m wide vehicular entrance via Turnpike Road; and, (vii) all associated works, including new boundary treatments, landscaping, SuDS and drainage necessary to facilitate the development.'
Conversion of attic with consequential alterations to existing rear roof to include a contemporary dormer to create a habitable bedroom with ancillary works.
The construction of a new single storey extension to the rear of existing truck and van test centre which will include the erection of a raised parapet and external cladding and external signage to the elevations and for all ancillary site works at Murphy's Truck Centre, Turnpike Road, Ballymount, Dublin 22.
Change of use of existing detached warehouse unit to vehicle service workshop including new internal works to from new staff canteen and toilet accommodation; new fire door exit doors; roller shutter door to existing elevations and attached illuminated building signage.
Construction of a single storey one bedroom dwelling attached to the existing dwelling with new vehicular entrance to both existing and proposed dwellings; new boundary walls and all associated works.
First floor extension over existing ground floor welfare facilities including changes to the elevations; erection of new cladding to the front (north east) elevation and part of the side (north west) elevation including for all associated signage and for alterations to the roof line of the existing porch at the main reception area; erection of 6.65m high totem signage structure located adjacent to the Turnpike road and for a 2.25m high totem signage structure located adjacent to the main reception entrance and for the erection of 3 x 6m high flag poles along the Turnpike Road; and for all ancillary site works.
Erect 1050sq.m of photovoltaic panels on the roof of existing warehouse unit with all associated site works.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached dormer bungalow in rear garden with partial 2 storey area, alterations to existing driveway, construction of new vehicular entrance with partial dishing of kerbs & all ancillary site work.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached dormer bungalow in rear garden with partial 2 storey area, alterations to existing driveway, construction of new vehicular entrance with partial dishing of kerbs & all ancillary site works.
Demolition of existing steel shed in rear garden. Construction of 2 bedroom detached Dormer Bungalow in rear garden with partial 2 storey area, alterations to existing driveway, constriction of new vehicular entrance with partial dishing of kerbs & all ancillary site works
Construction of single storey garden room. Consisting of home office & gym & all associated site works.
7 terraced, 2 storey dwellings (4 end terrace and 3 mid terrace) with attic level and dormer window and 'Velux' to the front roof and 'Velux' to rear roof, each dwelling has new vehicular entrance to the Ballymount Road, 2 car parking space each in front garden, landscaping and boundary walls, new footpath and all associated works.
7 terraced, 2 storey dwellings (4 end terrace and 3 mid terrace) with attic level and dormer window and 'Velux' to the front roof and 'Velux' to rear roof, each dwelling has new vehicular entrance to the Ballymount Road, 2 car parking space each in front garden, landscaping and boundary walls, new footpath and all associated works.
The installation of a 1.81m x 1.42m x 0.51m (H x W x D) gas pressure reduction unit with all ancillary services and associated site works.
Divide existing dwelling into two separate houses; 1 four bedroom bungalow and 1 three bedroom, two storey dormer type house. The new house will incorporate a previously approved ground floor granny flat extension and first floor games room (Reg. Ref. SD10B/0218) and will involve raising the existing ridge/roof level by 300mm and fitting 4 'Velux' rooflights; off-street car parking to both houses will be provided by existing vehicular entrances; all at front and side.
(a) the construction of a two storey mezzanine floor structure, (b) the installation of a new escape door to the rear elevation, and (c) all associated site works.
Installation of roof mounted solar panels over an existing Waste Transfer/Recycling building and all associated site works and services; the proposed development relates to an activity covered by an existing Waste Licence issued by the Environmental Protection Agency.
Construction of 3 no. enterprise / light industrial / wholesale outlet units (Units A, B and C), including ancillary office / administration areas over two levels, with a total GFA of 1,576 sq.m. The proposal includes 25 no. car parking spaces (which includes 2 no. van parking spaces), 20 no. cycle spaces, a Unit Substation, signage zones for the units delivery / loading areas, landscaping, boundary treatments, lighting, PV panels, foul and surface water drainage and all associated development. The proposal forms an extension to the development permitted under Reg. Ref.: SD22A/0099 and includes vehicular and pedestrian access off the permitted internal access road to the immediate south of the proposed units. The application site is located to the north west of, and will be accessed from, the development permitted under Reg. Ref.: SD22A/0099 (to be known as Apex Hub), and is located to the southeast of Crosslands Business Park, Ballymount Road Lower.
Design alterations to development permitted under ref. SD21A/0347 (extension to paint workshop) involving removal of existing 436sq.m store unit and enlargement of the permitted 980sq.m extension to 1,661.1sq.m (an increase of 681.1sq.m, bringing the total paint workshop unit to 3,216sq.m), together with new steel roof sheeting at the northern entrance to the permitted extension and the provision of 2 accessible parking bays and 2 electric vehicle parking bays and all associated site development works.
Construction of a single storey extension (980sq.m) to paint workshop with canopy; two access doors with roller shutters and all associated site development works.
Erect 728.41sq.m of photovoltaic panels on the roof of existing building with all associated site works.
The installation of 1 no. 4.8m x 8m x 2.9m high, Garden Room to contain a Home Office/Study, A home/personal gym and shower in the rear garden finished externally in timber/metal cladding.
Detached industrial unit comprising 960sq.m of workshop area plus 720sq.m stores/offices/staff facilities on two floors totalling 1680sq.m together with hardstanding area, diesel storage tanks, wash bay facilities, site boundary walls/fencing and all associated site development works.
Demolition of an existing single storey office building (total area of 647.62m2, 4.38m high) ancillary to the existing crane hire business with this area returning to yard area.
Demolish existing single storey extension at rear; construct a single storey extension at rear; construct a receded porch for front door at garage to tie in with existing.
To construct a new industrial building (412 msq) for maintenance of plant and machinery, with incorporated staff facilities, offices, meeting rooms and reception area along with a new connection to public sewers along with all associated services
Attic conversion for storage with rear dormer window and a singlestorey front extension with sloped roof.
Development of site (Containing 0.68 hectare) consisting of container storage area together with ancillary works including vehicular entrance, Parking area, drainage, Fencing and landscaping works
Single storey side extension to existing two storey dwelling and all associated works.
Change of use of the second floor of the subject building to a Dental Practice comprising of 2 surgery rooms, offices, waiting room/reception, sterilisation room and toilets and ancillary site works.
Extension of the existing depot to provide additional bus parking facilities comprising a total of 221 bus spaces (including 45 electric bus parking spaces), 33 car parking spaces (including 15 electric car parking spaces), 5 motorcycle parking spaces and 30 bicycle parking spaces; revisions to the layout and configuration of the existing bus and car parking areas; the installation of electric vehicle charging units and associated infrastructure; new vehicular entrance/egress arrangement (including barrier and ramp) to Ballymount Avenue on the north-eastern site boundary; the provision of 4 pedestrian entrances located on the south-eastern, south-western and north-eastern site boundaries; internal roads and pedestrian pathways; minor elevational amendments to the existing transport depot building (relocation and addition of roller shutter doors and relocation of signage); hard and soft landscaping; boundary treatments; changes in level; lighting; surface water drainage; piped infrastructure and ducting, and all associated site excavation and development works above and below ground. (The development will also include the underground diversion of the existing ESB power line traversing the south-eastern corner of the site.)
Retention of 3 standalone coated steel prefabricated units comprising of 2 single storey prefabricated units (each c.31sq.m GFA) and associated entrance ramps used for canteen and welfare use respectively; 1 single storey prefabricated modular unit (c.199sq.m GFA) and associated entrance ramp used for office use; all site development works are proposed on a site of c.0.245ha.
The relocation of the use of the existing apprentice joinery workshop training centre for young apprentices from its existing location on site to warehouse unit 2 involving the change of use from warehouse to apprentice joinery workshop training centre and all ancillary internal and external works including the extension of the first floor mezzanine of 747sq.m, minor modifications of the front entrance and provision of a canopy with integrated signage and provision of a waste wood store for recycling as fule for the boiler 29sq.m and dust containment at the rear, the overall GFA is 2,319sq.m; The use of the existing joinery workshop training centre will remain as a training centre for Sisk employees use and include general storage area at ground floor and minor internal and external works will be carried out comprising internally the extension of the first floor level mezzanine by 291sq.m from the existing mezzanine of 234sq.m to 525sq.m and externally the upgrading, cladding and improvements to fenestration of the external elevations, the overall GFA is 1346sq.m.
Retention of 2 single storey extensions to the industrial use at Plant Area 2 including a 124sqm extension with a sliding door entrance and a sloping lean to roof to the east and a 34sqm extension with a rolling shutter and a sloping lean to roof at the south west; and all associated site works.
Planning permission is sought for the following alterations: • Internal alterations at the ground floor level of the permitted warehouse/logistics unit, including a change of use of 310 sq.m, to provide additional ancillary staff welfare facilities and ancillary office accommodation; • Provision of an additional 158 sq.m at first floor level for ancillary office accommodation; • Amendments to façade treatment including signage and louvres; • Repositioning of the roof mounted Solar PVs; • Other associated alterations including to the landscaped areas; and • All associated development works Retention permission is sought for the following: • Reconfiguration of car parking layout, including amendments to circulation arrangements adjacent to the building entrance. No change is proposed to the overall number of car parking spaces; • Repositioning of the bicycle shelters; • Amendments to façade treatment, including: o Reconfiguration of glazing mullion centres and incorporation of additional opening sections; o Provision of a first-floor opening vent window to Staircore 2; o Minor adjustments to the cladding arrangement at parapet level; • Repositioning of the roof mounted AOVs; and • All associated site development works. The proposed alterations result in an overall increase of 158 sq.m in the total GFA of the warehouse/logistics unit from 3,026 sq.m to 3,184 sq.m (including ancillary office and staff welfare facilities).
(i) Alterations to existing roofs to include increasing roof height of one bay to match adjoining bay; (ii) new wall & roof cladding including louvred ventilation panels and translucent panels over existing cladding and to altered areas of buildings and extensions; (iii) provision of new roller-shutter doors to three existing opes and three new opes; (iv) demolition of three ancillary structures attached to the north side of the building and provision of four new single storey pitched roof structures attached to the north side of the building; (v) demolition of some existing wall and roof structures to the eastern end of the building, and the provision of new walls & roofs to form new areas of the high-bay plant/fabricating area with raised roof on parapet levels; (vi) demolition of a detached single storey plant building on the north-west of the site and storage buildings on the east of the site and construction of 3 new single storey detached plant and storage buildings; (vii) provision of new signage to the west facing elevation of the building at high level; (viii) all other associated siteworks & services to facilitate the development.
Retention permission for the construction of a single storey side and rear extension to existing detached single storey house as constructed and all associated site works.
Construction of a single storey side and rear extension to existing detached single storey house and all associated site works.
Extension to existing dwelling consisting of extension to rear of 57sq.m; conversion of attic into 2 bedrooms and ensuite bathroom with 3 dormer windows facing into garden of dwelling by raising the roof by 1.375m and extending the building to rear by 5.45m resulting in an increase of the area of the building from 52sq.m to 162sq.m.