Planning records
Showing 1-50 of 78 public recordsTo replace thatch roof covering to the existing cottage with a new corrugated metal finish (and slate finish to the roof of the sunroom), along with a new first floor rear bay window (extend existing bathroom), new rooflights to front roof and all other associated site works and services
To alter and extend the existing dwelling house & all other associated site and ancillary works
To construct a dwellinghouse, entrance, wastewater treatment system and soil polishing filter together with all associated site development works and services
For development which will consist of the construction of a slatted unit with machinery storage area and associated site works
For extension to existing dwelling along with new treatment septic tank system and site entrance, to include all associated site works
For development which will consist of the construction of a slatted unit and associated site works
To upgrade the wastewater treatment system
For a) to alter the house plans as granted under P24/60670 b) to alter the existing site entrance along with ancillary site works
Of the extension to the dwelling house and all other associated site and ancillary works
To construct a dwellinghouse together with all associated site development works and connections to public services
For development, the development consists of the construction of an agricultural loose house and associated site works
To construct farm entrance from public road to lands
To build a dwelling house, install a wastewater treatment system and all other associated site and ancillary works
Of a domestic shed ancillary to existing dwelling house
Of the building and associated works on site, and for permission to complete the building works for the provision of a one bedroomed residential unit, install a wastewater treatment system & all other associated site and ancillary works
For provision of extension to existing bonded warehouse and provision of new dry store, together with provision of stainless steel holding tank for pot ale waste
For the following; a) to alter and extend their existing house; b) construct a new shed; c) install a new proprietary waste-water system along with ancillary site works
Of existing unit on site and PERMISSION to convert same into staff accommodation including all ancillary works
Of the following a) enlarged family room with en-suite extension overhead, b) alterations to the fenestration of the dwelling, c) positioning of the wastewater treatment system and polishing filters and d) Permission to alter the site boundaries and associated site works
TO RETAIN the altered fenestration to the dwelling house, the revised site boundaries and septic tank location & all other associated site and ancillary works
For demolition of existing single storey extension to the rear of the existing storey & a half dwelling & construction of a new storey & a half extension to rear & side, including new contemporary corner window, lowering existing front windows & new blue bangor slates to existing dwelling & all site & ancillary and landscaping works
Of the extension and alterations to the dwelling, known as Flood's Cottage, which is a protected structure, RPS No. 420 and all other associated site and ancillary works
For development which will consist of construction of a single storey dwelling and detached garage, with site works and connections to public services
Of polytunnel structure (approximate floor area 27 sq.m, height 2.5 m)
To Extend the Appropriate period of Planning Permission P17/897 on the Grant of Outline Permission (P15-152 refers) for a dwelling house, garage, vehicular entrance, waste water treatment plant, percolation area and associated site works
To Extend the Appropriate Period of Planning Permission for P18/696 to extend the existing hotel, creating 8 additional guest bedrooms and all associated site and ancillary works
To construct a dwelling with on-site wastewater treatment, garage and new site entrance
The development will consist of (i) alterations, extension, and refurbishment of an existing dwelling, (ii) provision of a new wastewater treatment system and polishing filter, (iii) demolition of existing storage shed (iv) new storage shed (v) all associated site development and external works.
Of domestic shed as constructed together with all associated site development works and services
For development which will consist of the construction of a single storey house with a sewage treatment plant and percolation area, new stone boundary walls and a connecting driveway with a new road entrance and associated hard and soft landscaping
To replace the existing thatch roof covering existing cottage with a new slate finish along with all other associated site works and services
For change of use of existing guest house to residential dwelling house including all site services
To revise the house plans previously granted under reference P21/995 & all other associated site and ancillary works
Of changes to an existing building which was previously permitted under planning reference no. 14/377. PERMISSION is also sought to construct a new warehouse at the rear of existing building, along with PERMISSION for a portacabin office to be located at the front of the building. PERMISSION is also being sought at this time to provide for a new foul water treatment plant to replace existing system. This application is accompanied by a Natura Impact Statement.
To erect four number 8m high floodlight poles, associated fittings, including ancillary site works
Of Boiler House, Storage shed and Green House
For development at a site at lands at Lisnanard Townland, Ballyvaughan, Co. Clare (no Eircode available). The site measures circa 1.126 hectares and is principally bounded by the R477 road to the north; residential dwellings, agricultural buildings, and agricultural lands to the east, an un-named lane and a residential dwelling beyond to the west; and agricultural lands to the south. The site also includes a section of the R477 Regional Road that is within the Lisnanard Townland. The development will consist of: (1) The construction of a new Wastewater Treatment Plant (WwTP) comprising of: an inlet pumping station; a below ground storm tank (c.168m3); a storm overflow flow meter; an outfall manhole and emergency pumping station; a hose reel; inlet works; washwater kiosk; a sludge pumping station; a flow splitting chamber; a picket fence thickener (c.3.51m diameter); a return liquors pumping station; 2 no. settlement tanks (c.4.97m diameter); a final effluent flowmeter chamber; sample point and kiosk; a concrete hardstanding area for emergency mobile dewatering unit; a control building; a standby generator; 2 no. solar panels (c.20m [L] x 15m [w] x 3m [h]); 2 no. site parking spaces and associated ESB charge point; task lighting; internal access roads; new direct access from the R477; new signage; a paladin boundary fence (c.2.4m high), with a main access gate to the north, and landscaping maintenance access points to the south and east. (2) The installation of new sewers comprising of: a combined final effluent and storm sewer, storm overflow / return, sludge / return liquors, scum and dirty drain, foul pumping main, surface water drainage and potable watermains within the WwTP site; the installation of c.266m of new gravity sewer that will intercept the flow east of the existing septic tank and transfer these flows to the new WwTP; and c.240m of a new final effluent gravity sewer to convey the treated effluent from the new WwTP to the existing outfall. The emergency overflow pipe from the inlet pump station will connect to this sewer before leaving the WwTP. Installation of this effluent sewer will terminate at the existing manhole junction on the R477. (3) Landscaping works within the site boundary comprising of: earth embankment works; a proposed wildflower and biodiversity enhancement area; screen planting to supplement existing trees and hedgerows; removal of a section of the existing stone wall and trees / hedgerow to the north to facilita
To (a) construct new single storey Clubhouse and Community recreation facility, (b) construct new vehicular and pedestrian site entrance and access road, (c) install new wastewater treatment system (d) minor modifications of public road and ancillary site works. A Natura Impact Statement (NIS) has been prepared and accompanies this application
For development, the development consists of the construction of a calving unit and associated site works
For to Change of house design to that previously permitted under planning reference P21-1172
To build a new dwelling house, install a waste treatment system, create a new entrance onto the public road & all other associated site and ancillary works
To Extend the Appropriate Period of Planning Permission P17-897 on the Grant of Outline Permission (P15-152 refers) for a dwelling house, garage, vehicular entrance, waste water treatment plant, percolation area and associated site works
To erect a modular art studio
To Extend the Appropriate Period of Planning Permission for P17-808 for development which will consist of the construction of a new part two-storey, part single-storey house, with a sewage treatment plant and percolation area, new stone boundary walls and a connection driveway, with a new road entrance and associated hard and soft landscaping
Of the conversion of the attached garage, the extension and the first floor office area to the private dwelling house & all other associated site and ancillary works
For the construction of a Multi Use Games Area (MUGA), with associated site fencing, netting, artificial surface, floodlighting and all associated ancillary site development works
For the following development: 1. to demolish existing aviary units, existing rc wall / recycling area, existing shed and existing visitor seating; 2. for new Aviary Units, new RC boundary wall and associated fencing; 3. RETAIN existing Birds of Prey reception building and adjacent toilet block, including ancillary site works
To a) construct an entrance, dwelling house and detached domestic garage b) Install a wastewater treatment system and soil polishing filter c) Install a bored well together with all associated site development works and services
To construct a new dwelling house, a proprietary wastewater treatment system connected to the main sewer and all associated site works
To build a new dwelling house, install a waste water treatment system & all other associated site and ancillary works