Planning records
Showing 1-5 of 5 public recordsRetention application consists of the following: 1) Provision of fenced turnstile & pedestrian gate to the main building entrance on the front (north-east) elevation; 2) Provision of external ramped access to ancillary Office Block B2 and separate stepped access/egress platform on the side (north-west) elevation; 3) Provision of additional fencing and new barriers to existing HGV access/egress gate plus new pedestrian entrance gate; 4) Provision of gatehouse to HGV gate, 23m2, 3m high; 5) Provision of new paladin fence & second pedestrian gate on the side (north-west) elevation; 6) Provision of car access/egress barriers in and out and directional arrow road markings; 7) Provision of 23no. EV charging for logistics vehicles and 3 no. EV rapid chargers for logistics vehicles; 8) Provision of Sprinkler Tank 10.70m diameter, 9.39m high, effective capacity = 657m3, to rear (south-west) yard; 9) Provision of Pump House 29m2, 3.2m high, adjacent to above referenced sprinkler tank; 10) Provision of 2no. location of new paladin fence and fire tender gates within the site.
Erect 3 no. company logo advertising signs, smoking shelter, sheltered cycle parking spaces, and compactor canopy at Block B, College Lane, Greenogue Rathcoole Co. Dublin. The application consists of the following: Proposed 3no. non-illuminated signage company logo lettering; total area of 24.78m2 located 13.70m above ground floor level on the front (north-east) and side (north-west) elevation; Proposed smoking shelter located at front north-east elevation, 3.90m2, 2.68m high; Proposed 20no. sheltered cycle parking spaces at front north-east elevation; Proposed compactor canopy, 48m2, located 3.51m above ground floor level on the side north-west elevation.
Subdivision of existing Block B, College Lane, Greenogue, Rathcoole, Co. Dublin (existing areas: 23,421sq.m single warehouse and 2,963sq.m ancillary office/staff facilities as granted under application Ref. SD19A/0265 into 2 warehousing units as follows: (1) Unit B1 to contain 13,719sq.m existing warehouse area, 2,905sq.m existing ancillary office/staff facilities area; (2) Unit B2 to contain 9,665sq.m existing warehouse area, 58sq.m existing ancillary staff facilities area, 37sq.m change of use of existing warehouse to ancillary office/staff facilities area at ground floor and 636sq.m additional 2-storey ancillary office/staff facilities on 1st & 2nd floor; the above proposal includes minor elevation adjustments to south & west elevation of Unit B2 to facilitate the additional ancillary office/staff facilities, subdivision of the rear HGV yard by internal fencing, provision of new HGV & car access gate to Unit B2 from the existing estate access road, provision of 36 carpark spaces including 2 disabled spaces and 24 bicycle spaces, pedestrian access & footpath from the new gate to the new ancillary office and associated drainage adjustments. (Note: this planning submission is one of two independent applications for subdivision options to Block B).
Subdivision of existing Block B, College lane, Greenogue, Rathcoole, Co. Dublin (existing areas: 23,421sq.m single warehouse and 2,963sq.m ancillary office/staff facilities as granted under application Ref. SD19A/0265 into 2 warehousing units as follows: (1) Unit 81 to contain 15,815sq.m existing warehouse area, 2,905sq.m existing ancillary office/staff facilities area and (2) Unit 82 to contain 7,569sq.m existing warehouse area, 58sq.m existing ancillary staff facilities area, 37sq.m change of use of existing warehouse to ancillary office/staff facilities area at ground floor and 636sq.m additional 2-storey ancillary office/staff facilities on 1st & 2nd floor; the above proposal includes minor elevation adjustments to south & west elevation of Unit 82 to facilitate the additional ancillary office/staff facilities, subdivision of the rear HGV yard by internal fencing, provision of new HGV & car access gate to Unit 82 from the existing estate access road, provision of 36 carpark spaces including 2 disabled spaces and 24 bicycle spaces, pedestrian access & footpath from the new gate to the new ancillary office and associated drainage adjustments, note this planning submission is one of two independent applications for subdivision options to Block B.
2 above ground firefighting water holding tanks and 2 integrated pumphouses plus ancillary works to serve the 2 industrial development sites currently under construction at Block A & B.