Planning records
Showing 1-3 of 3 public recordsConstructing a 17m2 lobby extension and replacement of the existing single-storey entrance canopy as part of a localised renovation of the entrance to the production facility. Permission to include for the replacement of a localised area of the adjacent façade, replacement of surrounding paving, construction of new planter beds and relocation of existing gulleys
The removal of the existing Chiller 7 structure and its associated primary pumps and concrete plinth at the northeastern portion of the site and the construction of a new concrete plinth to facilitate the installation of a heatpump, two no. chiller’s, a dry air cooler, pressurisation unit and electrical panel. The development will also include associated pipe connections back to the Takeda Building; b) the provision of a new concrete plinth to the southeastern portion of the site to provide a new Battery Energy Storage System compound which will contain a BESS container and a HV switchgear Container and associated transformer and inverters, cabling, ducting, landscaping and ancillary infrastructure and site development works necessary to facilitate the development
For a Solar PV Energy Development within a site of 0.975ha at Takeda Ireland Ltd, Bray Business Park, Kilruddery, Bray, Co. Wicklow. The development will consist of “the erection of a 1,413 no. (636 kWp) Solar PV Energy Development within a site area of 0.975ha in the western car-park of the Takeda Facility. The Solar PV Arrays will be ground mounted on steel supported car-ports in 6 no. separate arrangements, covering part of the existing carparking spaces (201 no. spaces) and pedestrian walkway. The proposed development will also include the construction of an invertor building 13.5sqm to the north-eastern portion of the car park, a revised access barrier to the car-park, and all associated cabling, ducting, landscaping and ancillary infrastructure and site development works necessary to facilitate the development