To construct serviced dwelling house and domestic garage/store. Gross floor space of proposed works: house 282 sqm, garage 60 sqmDecision record indexed
For the construction of a serviced dwelling with an effluent treatment system and a garage/shed. Gross floor space of proposed works 310 sqm.Decision record indexed
To operate a reception/temporary storage and recovery yard for scrap metal, including end of life vehicles. The Class(es) of Activity at the site, as specified in Part 1 of the third Schedule of the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended) will be as follows; Class 4: The reception, storage and recovery of scrap metal, including scrap metal arising from end-of-life vehicles (other than end-of-life vehicles) and WEEE where scrap metal from - (a) end-of-life vehicles shall be subject to appropriate treatment an recovery in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (b) waste vehicles (other than end-of-life vehicles) shall be subject to appropriate treatment and recovery having regard to the provisions of articles 14 and 15 of the Waste Management (End-of-Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (c) WEEE shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 20, 21 and 22 of the Waste Management (Waste Electrical and Electronic Equipment) Regulations 2005 (S.I. No. 340 of 2005) prior to acceptance at the scrap metal facility. Class 12: The collection and storage (including the temporary storage) and the appropriate treatment and recovery of end-of-life vehicles in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006).Grounds not yet categorised
For the construction of: 1. dwelling house and garage, 2. installation of a treatment system and percolation area, 3. to fill the site using inert materials (soil and stone) and all associated site worksDecision record indexed
Of extension to the rear of the existing shed (granted under historical planning Ref No 57783) on a site with revision of boundaries from that previously granted under historical planning Ref No 33420. For provision of a new site entrance, new front boundary wall set back 3m from the existing road edge along the entire frontage of the additional site extension, to operate a reception/temporary storage and recovery yard for scrap metal, including end of life vehicles. The Class(es) of Activity at the site, as specified in Part 1 of the third schedule of the Waste Management (Facility Permit and Registration) Regulations 2007 (as amended) will be as follows; Class 4: The reception, storage and recovery of scrap metal, including scrap metal arising from end-of-life veh2qAQicles (other than end -of-life vehicles) and WEEE where scrap metal from - (a) end-of-life vehicles shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 14 and 15 of the Waste Management (End-Of-Life Vehicles) Regulations 2006 (S.I No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (b) waste vehicles (other than end-of-life vehicles) shall be subject to appropriate treatment and recovery having regard to the provisions of articles 14 and 15 of the Waste Management (End-Of-Vehicles) Regulations 2006 (S.I. No. 282 of 2006) prior to acceptance at the scrap metal facility, and as appropriate, (c) WEEE shall be subject to appropriate treatment and recovery in accordance with the provisions of articles 20, 21 and 22 of the Waste Management (Waste Electrical and Electronic Equipment) Regulations 2005 (S.I. No. 340 of 2005) prior to acceptance at the scrap metal facility. Class 12: The collection and storage (including the temporary storage) and the appropriate treatment and recovery of end-of-life vehicles in accordance with the provisions of articles 14 and 15 of the Waste Management (End-of-Life Vehicles) Regulations 2006 (S.I. No. 282 of 2006). Treatment system / septic tank, percolation area and all ancillary site development works. Gross floor space of work to be retained: 78 sqmGrounds not yet categorised
To construct dwelling house, domestic garage, wastewater treatment system percolation area and all associated services. Gross floor space of proposed works: 248 sqm (house) & 50 sqm (garage)Decision record indexed
For a new dwelling house, domestic garage, on-site sewerage treatment system, along with all associated site works. Gross floor space of proposed works: 268 msq & 60 msqDecision record indexed
To erect dwelling house, domestic garage, wastewater treatment system, percolation area and all associated services. Gross floor area of proposed works: 243sqm (dwelling house) and 58.9sqm (domestic garage)Decision record indexed
To (1) retain alterations to first floor plans of previously permitted creche facility. (2) Retain alterations and a change of use to the ground floor plan of existing storage shed to an afterschool childcare facility. (3) For revised site boundaries to existing Child care facility at the above address. Previous PL. Ref. No.'s (03/4145 & 10610) refers.Decision record indexed
For the conversion of an existing detached garage to a one-bedroom granny flat. Planning ref no. 033066 refers. Gross floor space of work to be retained: 38.53 sqmDecision record indexed
To construct a dwelling house, domestic garage, effluent treatment system, percolation area and all associated works. Gross floor space of proposed works: 247.50 sqmDecision record indexed
For reduced width of the vehicular entrance, for removal of a septic tank and the installation of a wastewater treatment plant with polishing filterDecision record indexed
For the construction of a two-storey dwelling house, detached garage, entrance, boundary fence/wall, suitable on-site treatment system with polishing filter, and all ancillary site worksDecision record indexed
For existing community centre 'as constructed' including revised floor plans and elevations from that granted under previous planning ref. No's - (992904 and 995065). Gross floor space of work to be retained: 25 sqmDecision record indexed
Of existing dwelling house and wastewater treatment system, (b) alterations and extension of existing dwelling house, (c) demolition of existing domestic garage and construction of new domestic garage, (d) all on revised site boundaries & (e) all associated site worksDecision record indexed
To construct dwelling house, garage, treatment system and percolation area and associated services. Gross floor space of proposed works is; dwelling 199 sqm & garage 60 sqm.Decision record indexed
To construct a dwelling house with shed, sewerage system and associated site works at the above address. house - 220sqm, shed-54sqmGrounds not yet categorised
For the construction of a side and rear extension to an existing dwelling including elevation alterations. Permission is also sought for the replacement of the existing septic tank with a new proprietary treatment system and percolation area and for all ancillary services and site works. Gross floor space of proposed works: 72 sqmDecision record indexed
To replace existing conservatory with a new sun room and to create a en-suite overhead at the first floor level. Gross floor space of proposed works: 26 sqm. Gross floor space of any demolition: 12.96 sqmDecision record indexed
To retain an existing dwelling and garage / shed and an extension and alterations to an existing dwelling and upgrade of an effluent treatment system. Gross floor space of proposed works: 160 sqm. Gross floor space of work to be retained: 178 sqm (dwelling) & 64.7 sqm (garage)Decision record indexed
For development consisting of (1) to construct a dwellinghouse and domestic garage/garden store. (2) New sewage treatment system and (3) all associated site works and services. Gross floor space of proposed works: House: 262 sqm, Garage: 60 sqmDecision record indexed
For alterations to an existing dwelling house, to consist of: (1) demolition of a 2 storey stone shed, rear single storey extension and front porch, (2) construction of a two storey side extension (plaster or timber clad finish), rear single storey extension, front porch, replacement sewerage treatment system and minor elevational changes to include external insulation to the existing dwelling and replacement roof tiles, (3) change of use of existing outbuilding/shed into playroom/gym and minor elevational changes and all associated workDecision record indexed
To construct a private dwelling house, proprietary effluent treatment system, percolation area and domestic garage along with all associated site works. Gross floor space of proposed works: 243.09 msq.Decision record indexed
To construct a private dwelling house, proprietary effluent treatment system, percolation area and domestic garage along with all associated services. Gross floor space of proposed works: 268.5 sqm.Decision record indexed
To renovate existing thatched cottage (Protected Structure RPS 4008), demolish existing extension to cottage, construct a new extension to rear of existing cottage and a new treatment plant and associated site services. Gross floor space of proposed works: 51.00 sqm(extension), 78.00 sqm(house). Gross floor space of demolition: 27sqmDecision record indexed
For the construction of dwelling house, domestic garage and proprietary treatment system. Gross floor space of proposed works: 200.6 sqm (house) and 60 sqm (garage)Decision record indexed
To construct a dwellinghouse, garage and associated services. Gross floor space of proposed works: Dwelling: 64 sqm, Garage: 25.50 sqmDecision record indexed
And continuation of quarrying activities for the extraction, by mechanical means only (wire and chainsaws), of dimension stone that includes: extraction within an area of 2.4 hectares; processing and storage of quarried material; provision of a wheel wash; provision of a hardstand area and hydrocarbon interceptor; all ancillary siteworks; for a period of 7years and all within an application area of 4.5HaGrounds not yet categorised
And continuation of quarrying activities for the extraction, by mechanical means only (wire and chain saws), of dimension stone that includes: Extraction within an area of 2.4 hectares; Processing and Storage of quarried material; Provision of a wheelwash; Provision of a hardstand area and hydrocarbon interceptor; all ancillary siteworks; for a period of 7 years and all within an application area of 4.5 Ha.Grounds not yet categorised
For the expansion to an existing sawmills to include for Permission for new automated timber handling facilities/buildings, water storage tank and ancillary services. Gross floor space of proposed works: 2,260.00 sqmDecision record indexed
To construct dwelling house, garage, private treatment system with all associated works and ancillary services. Gross floor space of proposed works: Dwelling: 158sqm, Garage: 60sqmDecision record indexed
To construct Dwelling house, Garage, Effluent Treatment Tank and Percolation Area and all associated site services. Gross floor space of proposed works: House 205.50 sqm, Garage 60 sqmDecision record indexed
To construct a fully serviced dwelling house, garage and a treatment plant system. Permission is also sought to relocate relevant front boundaries walls so that the required sight lines can be obtained. Gross floor space of proposed works: 168 msq (house) & 63 sqm (garage)Decision record indexed
For the construction of a new private dwelling house, proprietary effluent treatment unit, percolation area and domestic garage along with all ancillary site works. Gross floor space of proposed works: 249 sqm (house) & 38 sqm (garage)Decision record indexed
To construct serviced dwelling house and domestic garage/store. Gross floor space of proposed works: house 176 sqm, garage 60 sqmDecision record indexed
For the construction of a serviced dwelling with an effluent treatment system and a garage/shed together with all associated servicesDecision record indexed
For development consisting of the construction of a new two storey dwelling house and garage with proprietary treatment system and percolation area along with all associated site works. Gross floor space of proposed works: 279 sqmDecision record indexed
For a private domestic garage at the rear of the existing house along with all associated services. Gross floor space of works to be retained: 47.2 msq.Decision record indexed
To construct dwelling house, garage, treatment plant and polishing filter and associated services. Gross floor space of proposed works: Dwelling: 216sqm, Garage: 60sqm.Grounds not yet categorised
For retention permission of an extension to a slatted shed, part construction of a water storage tank and permission to complete the construction of the water storage tank along with associated site works. Gross floor space of work to be retained: 199.91 msq.Decision record indexed
And completion of dwelling house with amendments to design granted under pl. ref. 21/856, (2) relocation of proposed garage granted under pl. ref. 21/856, (3) temporary mobile home with temporary connection to existing wastewater treatment plant along with all ancillary worksDecision record indexed