Planning records
Showing 1-50 of 23,374 public recordsRelocation of the existing entrance door and provision of an open porch to the front elevation. Demolition of an existing single storey extension and construction of new single storey extension to the rear. Replacement of the existing septic tank with a new secondary waste water treatment system and soil polishing filter and all associated ancillary site development works above and below ground.
Extensions to the rear and side of the existing single storey bungalow house. The existing house consists of 3 bedrooms and measures 59.3sq.m.The proposed extended house will have 5 bedrooms and will measure 149.2sq.m. The application will include a new site entrance, storage area, a new septic tank, polishing filter and all new service connections ancillary to the development.
A new single storey three bedroom end of terrace house measuring 96.8m2; an extension of 15.5m2 to the rear of the existing terrace house adjacent to the proposed new house; the subdivision of the property into two separate residential sites; two new waste water treatment plants with soil polishing filters to the rear of both houses; a new vehicular entrance for the new house and all new service connections ancillary to the development.
Conversion and modification of existing attached garage space comprising of 2no. bedrooms, bathroom and open plan kitchen and living area.
The proposed development includes the construction of: 6 no. Stage buildings (buildings 1,2,3,11,13 &14) ranging in height between c. 20m and c. 23 m and comprising 11 no. Internal sound stages with overhead catwalks and 2-storey ancillary production offices including office space, plant and switch rooms, toilets, ICT rooms, staff toilets and showers and rooftop plant (totalling c. 35,187 sq. m); 4 no. workshops (buildings 15,16,17 &18) ranging in height between c. 9m and c. 10.5 m and comprising internal workshop areas, staff toilets and showers, ICT, plant and switch rooms(totalling c. 18,244 sq. m); TV studio and reception (building 4) comprising 3 no. TV studios (c. 17.8m height) and various supporting spaces across 3 floors including backstage shooting area, green rooms, hair and makeup rooms, production suites with ancillary offices, wardrobe, laundry room, Technical support offices, vision dept, lighting dept, pro service, run and crew kit room, chief engineer office, studio manager office, scenic store, props store, cameras and grip room, lighting and electrical room, plant room, sound control rooms, vision rooms, recording rooms and toilets at ground floor level; standard dressing rooms, tv post production spaces, kitchen and crew area, toilets, mechanical/electrical room, technical offices, media store at first floor level; star dressing rooms, tv post production, lounge and kitchen and toilets at second floor level; Single storey reception building to include guest holding areas, VIP and Guest service, security offices, staff toilets, showers and locker rooms (c. 10,875sq. m); 2-storey Dining Hall with ancillary 100 seat theatre (building 6) comprising indoor and outdoor dining areas, kitchen, storage and mechanical rooms, toilets and 3 no. meeting rooms at ground floor level; office space and covered outdoor balconies at First floor level (c. 4,351sq. m) Standalone café (building 5) (c. 96 sq. m) 3 no. single storey production suites (buildings 7,8 & 9) comprising offices, conference room, kitchenette, communal areas and toilets (totalling c. 795 sq. m); 3-storey car parking deck (building 19) (c. 14,782.sq.m) to include 438 no car parking spaces ( including 100 no. EV and 27 no. disabled) with ancillary offices (building 20) (c. 4,307sq.m) refuse recycling area and rooftop plant; and Outdoor stage area associated with the TV Studio and Reception Building; Site landscaping to include: an amenity walkway and biodiversity area along the northern boundary of the site; public realm and planting areas in the vicinity of TV Studio and Reception Building and production suite offices; green roofs; and boundary treatments. Hard standing to include backlot area (c. 14,160 sq.m) and 'shooting lanes' (c.18,900 sq.m) to facilitate outdoor filming; Electrical Substation (c 236 sq. m); primary and secondary gate houses (buildings 10 & 12) (c. 19 sq. m each) The proposed development will include the provision of 516 no. surface car parking spaces (including 96no. EV, 13 no. disabled and 13 no. EV / disabled ); Basecamp area to provide 36 no. Large Vehicle parking spaces & 3 no. bus parking spaces to front of reception building as well as provision of Bicycle parking to include 274 no. covered spaces and 96 no. external spaces. Additional works to include removal of existing wall and vegetation at south western boundary; provision of bin store adjacent to the proposed backlot area and additional waste storage area adjacent to proposed dining hall; proposed pump station; rooftop PV panels (Buildings 17 & 18);rooftop plant; Building signage; LED video screen on eastern elevation of TV studio and reception building; public lighting; drainage and services provision; boundary treatments (including security fencing); piped site wide services; pedestrian and cycle links and all ancillary works and services necessary to facilitate construction and operation. The primary proposed vehicular, cyclist and pedestrian entrance from the newly constructed Grange Castle West Access Road will be located at the eastern boundary of the site with a secondary vehicular access at the southeastern corner of the site.
Removal of the existing vehicular entrance, gates and driveway; new vehicular entrance to the east of the existing house with new gates and driveway and all ancillary site and landscaping works.
Part single storey, part two storey dormer extension of 170.43sq.m. to rear of an existing 49.57sq.m. house; a domestic garage, a wastewater treatment system and all ancillary works.
Planning permission is being sought by Peamount Healthcare CLG for part change of use from ancillary staff accommodation to laundry, and material alterations to include; (i) new door - front elevation (ii) new double doors - side elevation (iii) new double doors - rear elevation (iv) internal alterations and all associated site works at the Avenue Building, Peamount Hospital Campus, Newcastle, Country Dublin
Demolish the existing front porch; Demolish an existing single-storey rear Utility extension; Construct a dormer extension to the front of the existing house; Construct a single-storey and two-storey extension to the rear of the house; Convert the existing attic space, Carry out general alterations & refurbishment of the existing house; Construct a new entrance gate and walls to replace the existing entrance; Relocate existing external garden sheds and Carry out associated site works
A new part single/part two-storey dwelling, with new vehicular access off Peamount Lane, a proprietary wastewater treatment system, and all associated site and infrastructural works.
Alterations and additions to existing detached dormer dwelling; construction of new single storey extension to rear; construction of new dormer extension to north gable end; new playroom at ground floor level; guest bedroom at first floor level; new bay window extension to existing bedroom at ground floor level to the rear; 2 new dormer windows in lieu of existing 'Velux' rooflights to 2 existing first floor dormer bedrooms to the rear; construction of new detached carport to north gable end and front of existing dwelling; all ancillary site works.
Renovation of existing detached dwelling comprising of single storey peripheral extension. Removal of existing roof structure and remodel of internal layout, comprising of 2 no. bedrooms at first floor level and living room, office, WC and utility room at ground floor level. Construction of new one and two storey extension to the side of existing dwelling, comprising of 2 no bedrooms and en-suite at first floor and open plan kitchen, living and dining space and plant room at ground floor level. Upgrading of effluent treatment system and all associated ground works
Construction of a single-storey family flat to the front of the existing dwelling and associated site works.
The proposals will comprise of amendments to Unit 7 (K78 V6TY) constructed under Reg. Ref.: SD23A/0301 (as amended by Reg. Ref.: SD24A/0224W and SD25A/0011W). The proposed amendments will consist of: • Change of use from logistics/warehousing to logistics/warehousing/light - industry to accommodate a manufacturing use; • Reconfiguration of the layout of the unit resulting a slight increase in the total GFA from 12,650 sqm to 13,333 sqm. The warehouse floor area of the unit will decrease from 11,509 sqm GFA to 10,652 sqm of manufacturing floor area for the new use and the associated office space will increase from 994 sqm to 2,518 sqm; • Amendments to the elevations to accommodate the changes to the layout of the unit; • Provision of a canopy at the entrance of the building on the southern elevation and a new outdoor terrace (c. 110 sqm) to the south of the unit; • Reconfiguration of the car parking spaces to the south of the unit and provision of a new overflow car parking area to the west of the service yard; • A total of 213 no. car parking space will be provided to serve the development; • New entrance to overflow car park from internal link road to the south; • Provision of 10 no. van spaces to the south west corner of the service yard; • Installation of a containerised generator within the service yard area; • Provision of new tenant signage on south elevation: • Relocation of existing signage on the south elevation to the east elevation; • Provision of carpark totem to overflow parking; • Provision of additional PV panels at roof level and; • All associated site development works and landscaping works
The proposed development will consist of: Reconfiguration of the layout of Unit 5 resulting a slight decrease in the total GFA from 13,348 sqm to 12,650 sqm. The warehouse floor area of the unit will increase from 11,137 sq.m to 11,509 sq.m GFA and the associated office space will decrease from 1,689 sq.m to 994 sq.m; Reconfiguration of the service yard area including: Decreasing the service yard area to the north and west of the Unit 5 building; Relocation/reconfiguration of the service yard entrance; Omission of the permitted outbuildings in the service yard; Provision of updated landscaping with attenuation pond to the north of the building and service yard; Amendments to the western elevation to accommodate the changes to the layout of the unit; Reconfiguration of the bicycle parking area resulting in a reduction from 70 no. spaces to 64 no. spaces; Omission of the permitted tenant signage to Unit 5 and; All associated site development works.
Erection of a single storey extension to the front and side; Conversion of the existing garage to a kitchen dining room.
Permission is sought for a single storey Office Extension with a flat roof for Ground Investigations Ireland Ltd.
Two storey office extension with a flat roof for Ground Investigations Ireland Ltd.
The development will consist of two storey extension to side / front of existing dwelling ( north end ) together with single storey extension to side ( south end ) and porch area to front of existing dwelling. The development also includes revised internal ground floor plan layout and modifications to existing elevations, together with all associated site works.
Construction of a detached single storey bungalow; vehicular entrance; secondary effluent treatment system; all associated site works.
The development will consist of the reconfiguration and extension of an existing semi-detached bungalow. The proposed works will modernise the residence from a simple two bedroom set up to a four bedroom home with open plan living. Entry gates and driveway configuration will remain as is. The aesthetics of the original house will be retained to the street.
Extension to existing Hynestown House to provide for new kitchen, dining room, games room, bathroom, plant room at ground floor level and one additional bedroom at first floor level. Conversion and extension of farm building C to two-bedroom holiday home accommodation. Demolition of farm building D and replacement with a two-storey building with store, bathroom and utility room at ground floor level and two-bedroom holiday home at first floor level. Conversion of farm buildings E and F into two no. two-bedroom holiday homes. The installation of wastewater treatment plant, the carrying out of hard and soft landscaping and all ancillary site works.
Construction of a new Battery Energy System Storage (BESS) and Power Trunk building and all associated elements; Demolition of all existing structures on site associated with the current golf centre - including main clubhouse and a number of ancillary structures (total 1,009.84sq.m); Construction of a two storey power trunk building (maximum height 10.3m) over basement of 1,982.61sq.m containing MV switchgear; Construction of a BESS to reach a total capacity of 186.3 MWe; The facility will be within an open three storey structure (maximum height of 17.3m), totalling 18,560.9sq.m in area, containing 63 battery containers, & 63 no containers containing power invertors, step up transformers and electrical switchgear and roof level array of 1384 PV panels; 1 two storey administrative welfare buildings (298.26sq.m) associated with the BESS facility; It will be provided with a pre-cast wastewater treatment plant (up to 6 P.E.) discharging to percolation area with polishing filter for foul effluent; 1 single storey Fire Pump and Water Service Plantroom of 174.1sq.m, with associated water tank -associated with the BESS facility; 1 underground rainwater harvesting tank (volume 125 cubic meters - associated with the BESS facility of 35sq.m; 9 car parking spaces (including 3 disabled and 2 electric vehicle charging parking spaces) and 8 cycle spaces; The removal of an existing 15m high telecommunication support structure; Internal road network and new servicing access road from an entrance on Peamount Lane - with amendments to the existing entrance, comprising widening the entrance, provision of new security checkpoint, setting back of the boundary to achieve sufficient visibility splays, and reinstatement of appropriate boundary treatment along the Peamount Lane frontage; Site landscaping, planting, berms and retaining walls along site boundaries and security fencing; and all associated site services, lighting, infrastructural works and attenuation (SUDS features, underground storage and an above ground pond).
Retention of 15 metre high telecommunications support structure carrying telecommunications equipment, together with existing equipment container and associated equipment within a fenced compound as previously granted under local authority reference SD12A/0045. The development will continue to form part of Meteor Mobile Communications Ltd's existing and future telecommunications and broadband network.
The proposed development will consist of: The construction of five logistics / warehousing units (Units 1 - 5) with associated office accommodation, service yards, ancillary structures/areas, and substations. The overall floor area of the proposed logistics / warehousing units is c. 56,932 sq.m (Gross Internal Area (GIA)) with a total of c. 4,336 sq.m of office space. See following breakdown of each unit: Unit 1 will comprise GIA c. 10,432 sq.m (including c. 579 sq.m of associated office space) and measures c. 17.9m from finished floor level (FFL) to roof ridge; Unit 2 will comprise GIA c. 18,065 sq.m (including c. 1,005 sq.m of associated office space) and measures c. 18.4m from FFL to roof ridge; Unit 3 will comprise GIA c. 6,325 sq.m (including c. 579 sq.m of associated office space) and measure c. 17.4m from FFL to roof ridge; Unit 4 will comprise GIA c. 8,762 sq.m (including c. 484 sq.m of associated office space) and measures c. 17.6m from FFL to roof ridge; Unit 5 will comprise GIA c. 13,348 sq.m (including c. 1,689 sqm of associated office space) and measures c. 17.8m from FFL to roof ridge; Access to the site will be from the existing roundabout to the south of the site; Provision of no. 419 car parking spaces and 172 bicycle spaces to serve the proposed development; Associated works for the diversion of the existing foul sewer within the site; The provision of attenuation basins / wetlands across the site; Associated works for re-routing of the existing ESB overhead wires which traverse the site to underground cables within the site; The formation of plateaus on the site with surplus excavated material to allow for the future Phase 2 development and; All ancillary landscaping, boundary treatments, internal roads and roundabout, cycle / pedestrian paths, associated infrastructure, and site development works to support the development
Construction of 6 two storey, 3-bedroom terraced dwellings; all associated site development works, car parking, landscaping, open spaces, public lighting and connections to fouls and surface water drainage/attenuation systems and mains water supply; the proposed development represents an amendment to the existing partially completed development as it relates to the above-mentioned plots for which planning permission was granted under Register Reference SD19A/0040 granted on the 181h November 2019. The application provides for and planning permission is sought for an amendment to the scheme as set out in the compliance layout submitted on the 14th July 2020 and approved by South Dublin County Council on the 18th August 2021 on foot of condition No. 2a, 2b & 2c of SD19A/0040 by making provision for a vehicular access and footpath to the boundary of the lands to the rear (northern boundary) of the existing development; the development is on a site area of c. 0.15ha known as Site No's 10 - 15 Cornerpark Rise, Cornerpark Town land, Peamount Road, Newcastle, Co. Dublin.
Planning permission for the construction of 1 No. two-storey end of terraced house, comprising of 3-bedrooms with a private rear garden. The proposed development will also include associated landscaping, boundary treatments, drainage, and all ancillary site works, to be carried out within the side gardens.
Construction of a dormer window in the main roof to the rear of the property as well as the construction of a dormer window in the main roof to the side of the property and all associated site works.
Demolition of existing two storey dwelling of 'Bulmer' and associated outbuildings and demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of single storey stable building on the overall site; construction of 2 two storey Information Communication Technology (ICT) facilities each with three storey plant levels and associated ancillary development which will have a gross floor area of 30,518sq.m on an overall site of 8.2 hectares; 1 two storey ICT facility (building A) will be located to the south-east of the site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); 1 two storey ICT facility (building B) will be located to the north-west of Building A and centrally within the overall site and will have a gross floor area of 15,196sq.m including 18 emergency generators located at ground and first floor level within a compound to the north-eastern side of the ICT facility with associated flues that will be 25m in height and will be grouped in four groups of four and 1 group of two flues (18 flues overall); each of the two ICT facilities will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas; 2 pump rooms of 25sq.m each (4 overall - 100sq.m) plus water storage tanks and plant as well as a separate house generator that will provide emergency power to the admin and ancillary spaces; each generator will also include a diesel belly tank with a single refuelling area to serve the proposed emergency generators; 1 temporary and single storey substation (26sq.m); ancillary site development works including attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables; other ancillary site development works will include hard and soft landscaping throughout the site, lighting, fencing, signage, central services road, security gate, sprinkler tank house and 80 car parking spaces and 17 sheltered bicycle parking spaces; the development will be enclosed with landscaping to all frontages including a wetland to the south-east and will be accessed from the Peamount Road (R120) located within the townland of Milltown on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer' as well as agricultural lands and buildings which are located to the north of the Peamount Road and the lands to the north and within the overall site are subject to a concurrent application for a Power Generation Facility under Reg. SD20A/0058; An Environmental Impact Assessment Report (EIAR) is included with the application.
Demolition of the existing single storey house of 'Little Acre' and its associated garage and other buildings; demolition of the single storey stable building on the overall site; construction of a gas powered Power Plant with all its associated elements; the part single and part two storey property of Bulmer and an agricultural building to the east of the overall site will not be demolished; The Power Plant compound of 14,475sq.m will contain 2 Power Units each with 1 25m height stack (2 overall), transformers, air intakes and electrical modules; the Power Plant compound will also contain a two storey administration and workshop building (427sq.m) and LV switchgear building (140sq.m) (567sq.m in total) plus an AGI connection, gas compressor, water tank, water treatment, firewater tank and pumps, fuel skids, fuel tank and 1 emergency diesel generator; the proposal also includes a battery energy storage system compound of 3,300sq.m containing 15 battery containers and 15 inverters that will be linked to the Power Plant; the development will be accessed from a new vehicular entrance from Peamount Road that will provide access to the Power Plant at the rear of the site; all ancillary site development works, including attenuation pond and dry swales to connect to existing infrastructural services and network as well as fencing, signage, services road entrance gate and 8 car parking spaces; the development will be enclosed with landscaping to all frontages; an EPA-Industrial Emissions Directive (IED) licence will be applied for to facilitate the operation of the proposed development for a period of 10 years on a site of 8.2 hectares on lands that contain the 2 residential properties of 'Little Acre' and 'Bulmer'.
Permission to upgrade and relocate existing floodlighting system on a training pitch consisting of 4 number 18.2 metre high columns and all associated ducting, column bases and light fittings.
Two storey dwelling; garage and effluent treatment plant located to north west side of existing dwelling and for effluent treatment plant serving existing dwelling.
For the raising of the existing gable wall and forming a new dutch hip roof with dormer structure to the rear, new gable window and associated works. The space will consist of new bedroom with en-suite.
Single storey side extension. Comprising of a one bedroom family apartment and location of new effluent treatment plant to north west side of existing dwelling at Hazelhatch Road, New castle, D22, HD34.
Construction of a storey and a half extension to the rear; new pitched roof will tie into the existing roof at ridge level; installation of skylight windows.
New dormer window to rear to convert existing store to bedroom with 3 roof lights to the front of existing two storey dwelling and all ancillary site works
The construction of a storey and a half extension to the rear of the dwelling, the new pitched roof will tie into the existing roof at ridge level, development also consists of the installation of skylight windows.
Demolition of existing garden sheds to the rear and the construction of a single storey extension to the side and rear comprising of a kitchen, living and dining area and 2 no. ensuite bedrooms including internal modification works to the existing dwelling.
Amending the existing main hip to a gable with small hip and attic level (frosted) window in the gable wall, along with the provision of rooflights in the main roof to the front and rear of the house.
Construction of a single storey detached shed (25.5sq.m) located to the northwest of the dwelling.
Demolition of 2 sheds and the construction of 30 dwellings; 1 vehicular and pedestrian link with Main Street, Newcastle; vehicle and pedestrian link with Glebe Square, Newcastle and all associated and ancillary site development works.
The conversion and extension of the existing garage shed with construction of a new garden room/outhouse to the rear garden consisting of a home office, WC, storage room and all ancillary associated site works.
Planning permission is sought for change of use of existing creche facility to domestic dwelling house, and associated site works to include internal alterations to accommodate same
Erect two new flat roof dormer extensions to the rear roof at second floor level. Installation of a new opaque roof-light to the front roof, and all internal alterations to the proposed attic layout and associated external works.
A flat dormer extension to the rear roof at second floor level; A new roof light to the front roof; Internal alterations to the proposed attic layout and associated external works.
Partial demolition (c.114.3 sq m) of existing single-storey, detached, 5-bedroom bungalow (c.216.7 sq m), refurbishment (c.102.4 sq m) and single-storey, double-pitched and flat roof extension (c.219.9 sq m), to accommodate the primary dwelling (4 bedrooms and ancillary living and welfare areas) and an attached secondary, semi-independent annexe (1 bedroom and ancillary living areas), for integrated use as a multi-generational, fully accessible, family dwelling. And all associated and ancillary site development, landscaping and boundary works, including localized site reprofiling (max. 500mm increase) to match existing ground floor level, new access ramps and covered walkway connecting entrance of house to existing driveway.
The proposals will comprise of amendments to Units 2, 3 and 4, permitted under Reg. Ref.: SD23A/0301. The proposed development will consist of: Unit 2 Reconfiguration of permitted substation; Reconfiguration of car parking layout; Unit 3 Reconfiguration of the layout of the unit resulting in a reduction of floor area from 6,325 sq.m GFA (including 579 sq.m of associated office space) to 4,386 sq.m GFA(including 831 sq.m of associated office space); Reconfiguration of the car park area to provide an increase in the total number of car parking spaces from 50 no. spaces to 68 no. spaces including 14 EV charging spaces. Reconfiguration of the service yard area including: Increasing the service yard area to the east of the Unit 3 building. Relocation of the service yard entrance from east side of plot to south side of plot; Provision of 132 no. delivery van spaces with EV charging for all van spaces. Relocation of external facilities including bin store, water tank, condensers and PV battery area. Relocation of the bicycle parking area and a reduction from 32 no. spaces to 22 no. spaces; The unit will be served by 2 no. dock level loading bays and 1 no. level access loading bay; Amendments to the elevations to accommodate the changes to the layout of the unit and the provision of signage on the elevations; Omission of internal roundabout and revisions to the internal road layout; Provision of a new pedestrian crossing; Relocation of permitted substation; Amendments to the permitted attenuation ponds; Omission of the permitted fire tender access along the western boundary of the plot and; Increase in unit's finished floor level from 67.800m to 68.200m Unit 4 Relocation of permitted substation; Reconfiguration of carpark and bike parking layout (no change to permitted number of parking spaces). All associated infrastructure, road markings, totem signs, signage, Corten wayfinding, boundary treatments, landscaping and site development works.
The development will consist of a single storey self-contained family flat side extension and all associated site works
Planning Permission is sought for first floor dormer extensions to each side of an existing detached dormer dwelling, ancillary alterations to all elevations including additional side windows and roof window, removing the door from the front elevation and all ancillary site works.
The erection of 1 no. single storey 3 bedroom dwelling house circa 122 m2 nett internal area (circa 153 m2 gross external area) to include new vehicle access, car parking, new service & drainage connections & other associated site works including partial removal of existing boundary wall & fence, on overall site comprising 0.0752 hectares (circa 752 m2)