A new dwelling house, provision of a new entrance, provision of a driveway, provision of an effluent treatment system to comply with current EPA requirements, provision of a well and associated worksDecision record indexed
For a new dwelling with attached garage, new entrance, wastewater treatment unit and soil polishing filter, new well and associate worksDecision record indexed
For a new side extension to side of existing dwelling, removal of existing septic tank, install a new wastewater treatment unit, soil polishing filter and associate worksDecision record indexed
Installation of a 40ft metal shipping container with 3.2m high earth mounding to all sides for the safe and secure storage of pyrotechnics (class 1 hazardous goods) along with a 4m2 timber packing shed and all associated site development worksGrounds not yet categorised
Installation of a 40ft metal shipping container with 3.2m high earth mounding to all sides for the safe and secure storage of pyrotechnics (class 1 hazardous goods) along with a 4m2 timber packing shed for the packing and unpacking of pyrotechnics, underground fire water storage tanks, security fencing and all associated site development worksGrounds not yet categorised
An existing single storey extension, domestic garage and sheds ancillary to the dwelling along with retention of a gated boundary opening. Planning permission is also being sought for the replacement of the existing septic tank system with a new wastewater treatment unit along with all ancillary site worksDecision record indexed
(A) Modifications to existing entrance to improve sightlines. (B) Construction of an agricultural building to include cubicles and underground slatted slurry tank. (C) Construction of an agricultural building to include milking parlour, livestock handling facilities, waiting yard, underground slatted slurry tank, dairy and ancillary rooms. (D) Construction of an underground rainwater harvesting tank. (E) Erection of a Meal Bin, Water Tank and all associated site worksDecision record indexed
Construction of a proposed new single storey dwelling, effluent disposal system to current EPA standards, bored well, new entrance onto existing access road together with all ancillary site worksDecision record indexed
1 no. agricultural slatted unit of 67.5sqm with underground effluent storage tank, for the housing of cattle. The structure is mono-pitched with a maximum height of 4m and the effluent storage tank is 2.4m (8ft) deep. The shed is constructed of poured concrete base and rising walls, rolled steel joist (RSJ) beams and galvanised sheet claddingDecision record indexed
1. Demolition of existing single storey extension 2. Construction of a single storey extension to side and rear of existing dwelling and 3. all ancillary site worksDecision record indexed