Construct a dwelling house and septic tank/proprietary effluent treatment system together with all ancillary site works and servicesDecision record indexed
REFURBISHMENT OF AN EXISTING HOUSE, DEMOLITION OF EXISTING REAR EXTENSIONS AND OLD SHED, CONSTRUCTION OF A PROPOSED NEW EXTENSION TO THE REAR AND SIDE OF THE EXISTING PROPERTY, SEPARATE GARAGE, UPGRADE TO EXISTING ENTRANCE, NEW WASTE WATER TREATMENT SYSTEM, CONNECTIONS TO SITE SERVICES, AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
NEW EQUESTRIAN TRAINING CENTRE INCLUDING INDOOR HORSE ARENA AND STABLES AS WELL AS ANCILLARY ACCOMMODATION, ASSOCIATED OUT BUILDINGS AND FACILITIES, EFFLUENT TREATMENT UNIT AND POLISHING FILTER, TOGETHER WITH ALL ASSOCIATED SITE WORKS AND CONNECTION INTO EXISTING SERVICESDecision record indexed
Convert garage to part of dwelling house and construct extension to dwelling house together with all ancillary site works and servicesDecision record indexed
The development will consist of the construction of a proposed new detached dwelling house, separate garage, new entrance, new boundary treatments, new waste water treatment system, connections to site services, and all associated site works and landscaping.Decision record indexed
Planning Permission to retain dwelling house and garage on revised location and permission to complete as previously granted under P23/105 all as per drawing documentation submitted together with all ancillary site works and services.Decision record indexed
Construction of a proposed new detached dwelling house, separate garage, new entrance, new boundary treatments, new waste water treatment system, connection to site services, and all associated site works and landscapingDecision record indexed
DEVELOPMENT WILL CONSIST OF A SOLAR PHOTOVOLTAIC (PV) PANEL ARRAY CONSISTING OF UP TO 34,352SQM PV PANELS ON GROUND MOUNTED STEEL FRAMES, 5 NO. ELECTRICITY CONTROL CABINS CONTAINING 5 NO. INVERTER UNITS, CABLE DUCTS, HARDSTANDING AREA, BOUNDARY SECURITY FENCE SITE ENTRANCE, ACCESS TRACK, LANDSCAPING, CCTV, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCT NEW DETACHED DWELLING HOUSE, SEPARATE GARAGE, UPGRADE OF EXISTING ENTRANCE, NEW BOUNDARY TREATMENTS, CONNECTION TO PUBLIC SEWERAGE SYSTEM, CONNECTIONS TO SITE SERVICES, AND ALL ASSOCIATED SITE WORKS AND LANDSCAPING.Decision record indexed
The development will consist of the construction of a new residential dwelling house together with a carport, a garden shed, new entrance/ gates, new boundary treatments, connection to public sewerage system and all other ancillary site works and services.Decision record indexed
CONSTRUCT A DWELLING HOUSE, GARAGE AND SEPTIC TANK/PROPRIETARY EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICES ON THIS SITEDecision record indexed
Construction of a proposed new detached dwelling house, separate garage, new entrance, new boundary treatments, connection to public sewerage system, connections to site services and all associated site works and landscapingDecision record indexed
CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE, CONNECTION TO PUBLIC SERVICES, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
Construct a dwelling house, garage and septic tank/proprietary effluent treatment system together with all ancillary site works and servicesDecision record indexed
Planning Permission to construct a residential housing development consisting of 26 number dwelling house units (as previously granted under P04/1928 and P05/2746), the development will consist of 5 detached houses, 10 semi-detached and 11 terrace houses, all as per drawing documents submitted together with all ancillary site works and servicesDecision record indexed
The development will consist of a change of house type from the previously granted Planning Permission 16/322 and Extension of Duration 16/3220, the construction of a single family detached dwelling with garage, ground floor external terrace, new entrance and boundary treatments, connection to public services and all associated site works.Decision record indexed
The development will consist of minor modifications to the previously approved application Ref 24/60137. The extent of these modifications are listed below and highlighted on the drawings enclosed in this application. • Additional stone cladding to South, West and North elevations as indicated on the elevations. • Addition of metal clad canopy to the south façade at main entrance door as indicated on the elevations.Decision record indexed
CONSTRUCTION OF A SINGLE STOREY REAR EXTENSION TO THE EXISTING DWELLING HOUSE, REPLACEMENT OF ONSITE WASTEWATER SYSTEM AND ANCILLARY WORKSDecision record indexed
Construction of a new residential dwelling house, shed and effluent treatment system together with all ancillary site works and servicesDecision record indexed
CONSTRUCTION OF A PROPOSED NEW DETACHED DWELLING HOUSE, SEPARATE GARAGE, NEW ENTRANCE, NEW BOUNDARY TREATMENTS, CONNECTION TO PUBLIC SEWERAGE SYSTEM, CONNECTIONS TO SITE SERVICES AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
CONSTRUCT DETACHED DWELLING HOUSE, DETACHED DOMESTIC GARAGE, BOUNDARY TREATMENTS, SITE ACCESS, A SEPTIC TANK AND PERCOLATION AREA AND ALL ASSICIATED SITE WORKS AND LANDSCAPING.Decision record indexed
CONSTRUCTION OF A NEW RESIDENTIAL DWELLING HOUSE, SHED AND EFFLUENT TREATMENT SYSTEM TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCT DETACHED DWELLING HOUSE, SEPARATE GARAGE, NEW ENTRANCE, NEW WASTE WATER TREATMENT SYSTEM, CONNECTIONS TO SITE SERVICES AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
Construct dwelling house with waste water treatment system and garage on site together with all ancillary site works and servicesDecision record indexed
INSTALLATION OF PROPOSED 6 METRE EXTENSION ON TO AN EXISTING 36 METRE TELECOMMUNICATIONS SUPPORT STRUCTURE WITH RELOCATED LIGHTNING FINIALS (OVERALL HEIGHT 43.5M) CARRYING ANTENNAS, DISHES, ASSOCIATED EQUIPMENT, TOGETHER WITH GROUND BASED EQUIPMENT CABINETS AND NEW FENCING FOR WIRELESS DATE AND BROADBAND SERVICESDecision record indexed
Construct a 31 unit housing development consisting of 6 no. 1 Bedroom Apartments, 6 no. 2 Bed Duplex Apartments, 16 no. 3 Bed Semi Detached Houses and 3 no. 4 Bed Detached Houses together with all ancillary site works and services.Decision record indexed
The development consists of the demolition of the existing single storey extension and shed at the rear of the house, construction of a new single storey extension to the rear of the house and the renovation and alteration of the existing house, widening of the front entrance gateway together with all associated ancillary works.Decision record indexed
CONSTRUCT EXTENSION TO EXISTING DWELLING HOUSE, AND DEMOLISH EXISTING STORAGE SHED ALL AS PER DRAWING DOCUMENTATION SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
The development consists of the construction of a new dwellinghouse, garage and septic tank system together with all associated ancillary site works.Decision record indexed
The development will consist of: (1) Construction of a housing development with a total of 27 no. dwellings in semi-detached & detached configurations, consisting of 1 no. 4-bed detached house, 1 no. 2-bed detached house, 3 no. 3-bed detached houses, 18 no. 3-bed semi-detached houses and 4 no. 2-bed semi-detached houses. (2) Associated development and works including the extension of granted pedestrian and vehicular access under planning reference P05/1282, all hard and soft landscaping, internal roads and footpaths, cycle and car parking, public and private amenities and open spaces, boundary treatments, public lighting, and all other ancillary works above and below ground including connections to water supply, surface water infrastructure, wastewater infrastructure and utilities.Decision record indexed
Construct extension and alterations to existing dwelling house and garage and to construct car port on site all as per documents lodged together with all ancillary site works and servicesDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE WITH GARAGE AND AN EFFLUENT TREATMENT SYSTEM, TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
THE DEVELOPMENT CONSISTS OF A NEW DWELLING HOUSE, GARAGE AND DIRECT ACCESS FOOTPATH TO CONVENT ROAD, WITH CONNECTIONS TO PUBLIC SEWER, WATER AND OTHER UTILITIES TOGETHER WITH ALL ASSOCIATED ANCILLARY WORKS.Decision record indexed
CONSTRUCT A TWO STOREY DWELLING HOUSE, DOMESTIC GARAGE, SEPTIC TANK ADN PERCOLATION AREA AND ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
DEMOLITION OF EXISTING DWELLING HOUSE AND ANCILLARY SHEDS AND THE CONSTRUCTION OF A PROPOSED NEW DETACHED DWELLING HOUSE, ATTACHED GARAGE, WIDENING OF EXISTING ENTRANCE, NEW BOUNDARY TREATMENTS, CONNECTION TO PUBLIC SEWERAGE SYSTEM, CONNECTIONS TO SITE SERVICES AND ALL ASSOCIATED SITE WORKS AND LANDSCAPINGDecision record indexed
DEMOLITION OF EXISTING REAR SHED, CONSTRUCTION OF NEW SINGLE STOREY REAR EXTENSION WITH LINK CORRIDOR TO EXISTING DWELLING HOUSE AND ALL ANCILLARY WORKSDecision record indexed