to
to

Planning records

Showing 1-9 of 9 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/5110Granted

    Coolcaum Churchtown Mallow Co. Cork, P51TR63

    Permission to alter existing dwelling house, to include alterations to elevations of existing dwelling house, new dormer windows and an enclosed front porch, extension to the existing detached garage, provision of renewable energy type roof panels to the detached garage roof, modifications to the existing vehicular entrance, construction of a front boundary masonry blockwork wall to replace existing front boundary fence line and permission for retention of the location of the existing bored water well.Decision record indexed
    Decision11 December 2025View record
  2. © OpenStreetMap
    25/4063Granted

    Coolcaum Churchtown Mallow Co.Cork

    Permission for: a) Construction of single storey extension to the side of existing dwelling house. b) Demolition of existing entrance porch. c) Demolition of existing chimney. d) Removal of existing septic tank. e) Installation of new septic tank and associated percolation area. f) Construction of new vehicular entrance. g) All associated site works.Decision record indexed
    Decision23 May 2025View record
  3. © OpenStreetMap
    23/6099Granted

    Fiddane, Cooliney Coolcaum, Ballynoran, Ballynadrideen Ardnageehy, Charleville Co. Cork

    The development will consist of an application for a 10-year planning permission for the construction of, and 40-year operation and subsequent decommissioning of, a development consisting of a 92.75-hectare solar farm and underground grid connection route (red line boundary). The underground grid connection route will run underneath private lands and L5527, L5528 and L5529 public roads for 1km where it will connect the proposed development to the previously consented electricity grid interconnector (Cork County Council Pl. Ref 22/5933). The solar farm comprises of four separate land parcels divided by local roads. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas concrete shoes to protect possible underground archaeological features, together with electrical transformation enclosures, underground cabling, temporary construction compounds, the use of existing farm access tracks, existing site entrances, widening of 1 No. existing site entrance, inverters, CCTV poles and cameras, deer type security/boundary fencing with some areas of boundary development on concrete shoes to further protect possible underground archaeological features, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity and transmitting it. A Natura Impact Statement will also be submitted to the Planning authority with this application.Decision record indexed
    Decision01 July 2024View record
  4. © OpenStreetMap
    22/5681Granted

    Coolcaum Churchtown Mallow Co.Cork

    A 10 year planning permission for the construction of, and a 40 year operation and subsequent decommissioning of, a development consisting of a 42.6 hectare solar farm. The proposed solar farm will consist of a series of ground mounted solar photovoltaic (PV) panels, mounted on steel support structures and in some areas of potential archaeological remains on concrete blocks/shoes, together with 28 no. electrical transformation enclosures, a temporary construction compound, use of existing farm access tracks, existing site entrance, underground cabling, inverters, CCTV poles and cameras, deer type security/boundary fencing, landscaping and biodiversity measures and all associated ancillary development works, for the purpose of generating renewable energy electricity. A Natura Impact Statement will be submitted to the Planning Authority with this application.Decision record indexed
    Decision19 June 2023View record
  5. © OpenStreetMap
    22/5933Granted

    The Townlands of Fiddane, Cooliney, Ballynoran, Coolcaum & Ballyroe, Charleville, Co.Cork.

    The installation of two 33kV electricity grid interconnectors with a combined total length of 2,217m of underground cable with a joint bay and 1,146m of over head line supported by 8 triple pole sets and 5 double pole sets, a temporary construction compound and 4 transformer stations. The proposed development is to connect the permitted but not built solar farm development at Fiddane (pl.ref 17/05799 & ABP-308846-20) to the consented but not built Ballyroe solar farm (pl/ref. 20/04041), co.Cork and the proposed solar farm development at Coolcaum to the consented but not built Ballyroe solar farm (pl.Ref 20/04041), co.Cork. The cables will be under public road and private lands. The location of the proposed development is in the townlands of Fiddane, Cooliney, Ballynoran, Coolcaum, and Ballyroe near Charleville. A Natura Impact Statement will be submitted to the planning authority with this application.Decision record indexed
    Decision15 June 2023View record
  6. © OpenStreetMap
    22/6288Granted

    Coolcaum Churchtown Mallow Co.Cork

    Permission for retention of unauthorised developments consisting of the following: (a) dwelling and entrances as constructed including ancillary works, (b) stables, fowl house and agricultural machinery shed together with vehicular entrance, (c) straw and hay shed, (d) domestic garage and associated site worksDecision record indexed
    Decision03 April 2023View record
  7. © OpenStreetMap
    22/6889Granted

    Coolcaum Churchtown Mallow Co.Cork

    Retention of (i) conversion of attic of existing dwelling to storage area including roof lights and gable window and (ii) elevational alterations to existing dwellingDecision record indexed
    Decision27 February 2023View record
  8. © OpenStreetMap
    21/7246Refused

    Annagh North, Coolcaum, Fiddane Cooliney, Rathnacally, Farranshonikeen Ardnageehy and Clashganniv Co. Cork

    The development will consist of:. Construction of 6 no. wind turbines with a blade tip height of 175m, rotor diameter of 150m and a hub height of 100m;. Construction of turbine foundations and crane pad hardstanding areas;. Construction of new site tracks and associated drainage infrastructure;. Upgrading of existing tracks and associated drainage infrastructure where necessary;. Upgrade of entrance onto local road L1322;. All associated drainage and sediment control including the installation of new watercourse or drain crossing and the re-use or upgrading of existing internal watercourse and drain crossings;. Construction of 1 no. permanent onsite 38kV electrical substation to ESBN specifications including: - Control building with welfare facilities; - Electrical infrastructure; - Parking; - Wastewater holding tank; - Rainwater harvesting; - Security fencing; - All associated infrastructure, services and site works.. 1 no temporary construction site compound and associated ancillary infrastructure including parking;. Tree felling to facilitate construction and operation of the proposed development;. Installation of medium voltage (20/33kV) and communication underground cabling between the proposed turbines and the proposed on-site substation and associated ancillary works;. Erection of 1 no. permanent meteorological mast with a height of 100m above ground level and associated access track;. Installation of medium voltage (38kV) underground cabling and associated ancillary works between the proposed on-site substation and the existing Charleville Substation within the townland of Rathnacally. The proposed grid connection will be installed primarily within the public road and will include 2 no. watercourse crossings and the installation of 8 no. pre-cast joint bays;. All associated site development works;. A 10 planning permission and 35 year operational life from the date of commissioning of the entire wind farm. This application for planning permission is accompanied by an Environmental Impact Assessment Report and Natura Impact Statement.Grounds not yet categorised
    Decision22 December 2022View record
  9. © OpenStreetMap
    21/5390Granted

    Coolcaum Churchtown Mallow Co. Cork

    To construct a new garden equipment storage shed with all associated site and ancillary works.Decision record indexed
    Decision14 July 2021View record
Showing 1-9 of 9
PreviousPage 1 of 1Next