Planning records

Showing 1-17 of 17 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    2562241Granted

    COOL UPPER, CRANFORD, LETTERKENNY PO

    (1) CHANGE OF HOUSE DESIGN FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 21/50214 AND (2) CONSTRUCTION OF NEW VEHICULAR ACCESS TO THE SITE AND ALL OTHER ASSOCIATED SITE DEVELOPMENTDecision record indexed
    Decision24 April 2026View record
  2. © OpenStreetMap
    WEB5936/25Granted

    Unit 3, One Central Plaza (formerly known as The Central Bank Building), Dame Street, Dublin 2

    PROTECTED STRUCTURE: RPS: 8830: Unit 3 is located at ground level, with associated back of house located at basement -1, onto Fownes St Upper to the west and the Plaza and Dame St to the South. The proposed development relates to permission for internal signage for Unit 3, which is permitted as a restaurant, to consist of: • 1 no. banner sign, hanging internally within the unit and set back from the existing glazed facade on the southern elevation of 0.5m x 6.269m. The proposed sign is brushed stainless steel fascia panel, with low energy red LEDs for halo illumination. • 1 no. banner sign, hanging internally within the unit and set back from the existing glazed facade on the western elevation of 0.274m x 3.438m. The proposed sign is brushed stainless steel fascia panel, with low energy red LEDs for halo illumination. • 1 no. roundel sign, hanging internally within the unit and set back from the existing glazed facade on the western elevation of 1.45m x 1.45m. The proposed sign is brushed stainless steel fascia with coloured vinyl lettering and graphics, with low energy cool white LEDs for internal illumination. • 1 no. LED red light line, set back from the southern elevation and along the extent of the southern elevation profile.Decision record indexed
    Decision31 March 2026View record
  3. © OpenStreetMap
    2560931Granted

    Coole Lodge, Chapel Road Kindlestown Upper, Delgany

    Replacement single storey sunroom extension to the rear of the existing house and changing of first floor bedroom sliding doors into a window and all associated external worksDecision record indexed
    Decision14 January 2026View record
  4. © OpenStreetMap
    2560927Granted

    COOL UPPER, CRANFORD, LETTERKENNY PO

    DEMOLITION OF EXISTING SHED, CONSTRUCTION OF A NEW DWELLING HOUSE AND DOMESTIC GARAGE AND INSTALLATION OF A SEPTIC TANK SYSTEMDecision record indexed
    Decision24 July 2025View record
  5. © OpenStreetMap
    2462119Granted

    COOL UPPER, CRANFORD, LETTERKENNY PO

    DOMESTIC GARAGE AND PERMISSION FOR DEMOLITION OF EXISTING MICA DEFECTIVE DWELLING HOUSE AND ERECTION OF A REPLACEMENT DWELLING HOUSE WITH CONNECTION TO EXISTING SERVICES AND ALL OTHER ASSOCIATED SITE WORKSDecision record indexed
    Decision27 March 2025View record
  6. © OpenStreetMap
    2360134Granted

    Tawnaghmore Upper and Tawnaghmore Lower, Killala, Co. Mayo

    A nominal 50 megawatt electricity generating station, combusting woody biomass chips (domestic and imported) as well as a small proportion of fuel oil for boiler start-up. The total site area is 19.0 ha of which approximately 7 ha will be developed. The elements of the station are: weighbridges (2 no.), scale house, roundwood storage area, log deck, enclosed wood chipper, wood chip truck dump, wood chip receiving hopper, wood chip screen, wood chip hog, wood chip bins (2 no.), wood chip storage building, wood chip reclaimer, wood chip conveyors with associated magnetic separators, fuel oil storage tank and associated pumps, fuel oil generator, boiler house, baghouse, ash silo, induced draft fan room, boiler stack, combustion air and flue gas fans, boiler additive material receiving hoppers (3 no.), boiler additive conveyors with associated magnetic separators, boiler additive silos (3 no.), boiler water treatment tanks and associated pumps, ammonia tank and associated pumps, turbine hall (existing), control room (existing), cooling tower and associated pumps, water treatment building, waste water storage tank, fire water storage tank and associated pumps, compressed air system, high voltage transfer lines (3 no.), low voltage transfer lines (3 no.), GSU transformer, switchyard, switchyard MCC room (existing), storage and maintenance building (existing), garage, car park, HGV parking, flagpoles (3 no.), external lighting, CCTV cameras, internal road system, signage, construction compound, landscaping, foul and storm water disposal systems, storm water attenuation, wheel washes, gatehouses (2 no.), entrance gates, security fencing, and all associated site works and services. (See attached Description of Proposed Development document for more details.)Decision record indexed
    Decision20 February 2024View record
  7. © OpenStreetMap
    4975/23Granted

    The Pathology Block, at the National Concert Hall, Hatch Street Upper, Dublin 2

    PROTECTED STRUCTURE The development will consist of the conservation and refurbishment of the existing Pathology Block, one of the buildings included in the National Concert Hall (NCH) Complex, located on Hatch Street Upper. The development includes the change of use of the former UCD School of Medicine to the Learning and Participation function of the NCH. The total floor area of the development is approx. 1401 msq. The Pathology Block, link structure and adjacent Butler Wing (South) are designated Protected Structures within the NCH complex (Reference RPS 2425). The conservation and refurbishment works to the Pathology Block will include a new public entrance to the existing link structure on Hatch Street Upper to provide universal access, 2no. recital spaces, 5no. workshop spaces, offices, new sanitary facilities and additional ancillary support and plant accommodation. The existing sandstone facade and chimney stack to Hatch Street will be cleaned, repaired and conserved. Existing brickwork shall be repointed where necessary. Refurbishment work will include the conservation and repair of existing external windows, doors, roof lights and upgrading of the existing slate roof, including removal of some asbestos slates, and rainwater goods and all minor/repair work. The existing glazing will be retained where possible and works will include installation of slim-line glazing in the two recital rooms and percussion workshops. Secondary glazing will be installed internally to 5no. of the windows of the main recital space. 5no. casement windows will be replaced with new timber sliding sashes, to match the windows on Hatch Street Upper. New heating, ventilation and cooling plant is to be located internally in the first floor area of the West Range, with associated louvres to the roof lantern and condensers in the courtyard garden, new floor and removal of walls and staircase. 2no. window openings are to be adapted, and 2no. new opes to provide fire escape doors on the west elevation. The existing access gate will be relocated to the north. Walls and partitions to be removed to facilitate Workshops 3, 4 and 5 and office 2. Blocked up opes to be reused with new doors and windows to the courtyard. The existing flat roofed timber clad structure over the granite bridge linking the Pathology Block and the Butler Wing is to be removed and the bridge returned to its original condition. A lime render application is proposed on the east elevation facing the Butler Wing. The flat roof and north wall of the link structure to be removed and rebuilt, to accommodate new entrance space, toilet facilities. Internal steps and a platform lift will facilitate universal access to the existing ground floor of the Butler Wing South. The rear wall is to be rebuilt 2.4 meters to the north to accommodate 2 no. universally accessible toilets on the Pathology Block ground floor and the ground floor of the Butler Wing South. In order to facilitate the proposed development, the following demolitions are required: Block A - A 75sqm vacant repair workshop with a flat roof and pre cast concrete coping. Block B - A 9sqm vacant lock-up store of modern blockwork construction, partly rendered. Block C - A 33msq single storey lean-to structure and redundant plant and ducts located to the north side of the Pathology Block to re-instate two high level windows. Block D - An existing 5sqm concrete lean-to shed in the courtyard - housing redundant plant equipment. Block E - An existing 6sqm timber frame enclosure in the courtyard. Modern 1990s mezzanine 141sqm first floor and staircase housing vacant offices. 28sqm timber gallery and stairs. 109sqm Link Structure to include flat roof and rear wall. The external works will comprise hard and soft landscaping, including measures to protect the three mature lime trees, lighting, new steps and gently sloped inclines to facilitate universal access to the proposed new entrance, new folding gates to Hatch Street Upper to replace the existing section of infill railings, 4 bicycle stands (8 bicycles), replacement of existing drainage lines, provision of SUDS features and all associated ancillary drainage and site works on a site area of circa. 0.2628 hectares. The development has been screened for both Appropriate Assessment and Environmental Impact Assessment.Decision record indexed
    Decision16 February 2024View record
  8. © OpenStreetMap
    3749/23Granted

    114 Grafton Street, Dublin 2, D02 NH21

    PROTECTED STRUCTURE: (RPS Ref. No. 3262). The site is located within the Grafton Street and Environs Architectural Conservation Area. The proposed development will comprise: -Removal of existing escalator between ground floor, mezzanine and first floor levels and associated works; -Removal of ramped access at ground floor level to be replaced by a disabled access lift from lower ground floor level to upper ground floor level; -Removal of double doors to the front facade and replacement with shopfront window; -Installation of partitions to provide changing rooms at ground floor level; -Installation of partition to provide additional storage space at second floor level; -Installation of partition to provide additional storage space at fourth floor level; -Removal of internal glazed wall panel and instatement of masonry wall in stairwell at mezzanine level; -Upgrading of building services including new energy efficient heating and cooling systems; -Refurbishment of windows to front facade and other general repair and conversation works; -All associated works and infrastructure to facilitate the development.Decision record indexed
    Decision06 July 2023View record
  9. © OpenStreetMap
    2349Granted

    The Maltings, Athy, Co. Kildare

    For the development consisting of an energy decarbonisation project that will include the installation of associated equipment including: a (2No containerised heat pump structures, each 13.7m x 7.3m x 5.77m high b)1No containerised switchroom 12.2m x 4.8m x 3.0m high c)1No containerised heat pump structure 13.7m x 4.6m x 8.7m high d) Transformer bund containing 5No transformers e) 2No hot water buffer tanks 14.7m high x 3.7m diameter f)1No waste water storage tank 21m high x 8m diameter g) 1No cooling tower and associated basin 4.5m x 14.85m x 8.2m high h) A stainless steel hot air recovery duct 7m wide x 4m high to be located along the top and north side of the Seeger Kiln Building. I) Repairs to the stone wall along the William Street Upper site frontage and the replacement of the existing fencing with a metal railing J) Replacement of the existing metal gates along the William Street Upper site frontage with painted hardwood timber gates and signage. The site activity is subject of an Industrial Emissions Licence application. Following a requirement by the Planning Authority, a Natura Impact Statement has been submittedDecision record indexed
    Decision06 June 2023View record
  10. © OpenStreetMap
    22/6367Granted

    Coole Upper Fermoy Co.Cork

    Alterations to existing agricultural/ domestic vehicular entrance and all ancillary works to achieve sight linesDecision record indexed
    Decision12 December 2022View record
  11. © OpenStreetMap
    2250073Granted

    COOL UPPER, CRANFORD, LETTERKENNY PO

    MOBILE HOME AND PERMISSION FOR REFURBISHMENT OF DERELICT DWELLING HOUSE, CONNECTION TO EXISTING SEPTIC TANK INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
    Decision26 May 2022View record
  12. © OpenStreetMap
    21/6582Granted

    `Former Shirt Factory' Cappagh Kinsale Co. Cork

    (i) Demolition of the existing annexes to the front elevation and side elevation of the `Former Shirt Factory’ (which is to become the production hall), in addition to demolition of the steel ruin frame structure on site, (ii) Modernisation of existing building elevations (the proposed production hall), comprising alterations to the building façade, including revised material finishes to the roof and elevations incorporating fenestration changes allowing for a brewery and distillery at ground floor level, (iii) Construction of extension to the front elevation of the existing building on site (the proposed production hall) consisting of ancillary office space, retail space at first floor level with lower and upper terraces and associated signage, (iv) A storage hall, (v) The upgrading of the existing access into and through the site including a swale incorporating the length of the site with drainage to Commogue Marsh, (vi) Ancillary on-site car and bicycle parking provision, (vii) Beer storage tank farm, (viii) Malt grain storage silo farm, (ix) Plant including steam boiler unit and cooling ventilation unit, (x) Delivery yard permitting open storage, (xi) Landscaping including fencing, new boundary treatments, lighting, and pedestrian linkages to nearby footpath, and (xii) Pumping station, ground level changes with all other associated site works and ancillary services.Decision record indexed
    Decision26 January 2022View record
  13. © OpenStreetMap
    211323Granted

    Tinock Upper, Ballingarry, Thurles

    Construction of a concrete pad 4m X 4m in area, to accommodate the installation of a stainless-steel milk cooling tank with aluminium cladding together with attached ladder. The overall unit measures 5.94m in height, with a capacity of 31,480 litresDecision record indexed
    Decision09 November 2021View record
  14. © OpenStreetMap
    206368Granted

    Kilshallow, Upper Coole, Co Westmeath

    Permission to construct a one storey dwelling house (170m2) and an accompanying garage (22m2). Permission is also sought for a new domestic entrance on to public regional road and for the installation of a wastewater treatment plant and polishing filter and all associated site worksDecision record indexed
    Decision18 August 2021View record
  15. © OpenStreetMap
    2150214Granted

    COOL UPPER, CRANFORD, LETTERKENNY PO

    ERECTION OF A DWELLING HOUSE WITH SEPTIC TANK / SEWAGE TREATMENT SYSTEM, DOMESTIC GARAGE AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision29 July 2021View record
  16. © OpenStreetMap
    20/5501Granted

    Coole Upper Coolagown Fermoy Co. Cork

    To alter and extend the existing cottage, so as to; (1) construct dormer extension to rear, (2) construct dormer room in existing cottage roof, (3) construct projecting canopy to existing front door with sundry alterations to side elevations as well as, development to existing site entrance and installation of domestic waste water treatment unit with all associated site development works.Decision record indexed
    Decision03 November 2020View record
  17. © OpenStreetMap
    20318Granted

    Moneypoint Generating Station, Carrowdotia North and Carrowdotia South, Kilimer

    For development on a c. 2.7 ha site located within Moneypoint Generating Station, Carrowdotia North and Carrowdotia South, Kilimer, County Clare (Eircode V15 R963) which is licenced by the Environmental Protection Agency (EPA) under an Industrial Emissions (IE) Licence (Ref. P0605-04) and an Upper Tier COMAH site and therefore falls under the requirements of the Control of Major Accident Hazard Regulations(COMAH) Regulations, 2015. The development, which will be located within a fenced compound c. 0.4 ha, will consist of a up to 400 MVA (electrical rating) synchronous condenser which shares the existing 400 KV/17 kV transformer and 400kV underground cable belonging to the existing coal fired unit 2. The following plant will be included within the compound: (a) main building (c. 420sq.m., c. 15m high) to house equipment including the synchronous condenser, flywheel, lube oil skid, air compressor and pumps. (b) supporting items of plant including; cooling equipment (c. 690sq.m., c. 3m high); c. 7m high modular containers to house electrical and control equipment (total area of c. 384sq.m.); auxiliary transformer (c. 48sq.m., 7m high) and electrical plant including an external circuit breaker (c. 66sq.m., c. 9m high); connections to existing site services networks including electrical, water and wastewater and an underground surface water attenuation tank connecting to existing surface water drains. (c) all other ancillary and miscellaneous site works including site clearance, site access, internal roads and development of areas of hard standing including a maintenance laydown area. (d) the development will be bounded by a c. 3m high chainlink fence. Site access will be by means of a new c. 2.7 m high palisade gate accessed from a new internal road within the station site. PERMISSION is also sought to continue the use of the existing underground cable grid connection, including the 400kV/17kV transformer and 400 kV underground cable belonging to the existing coal fired Unit 2 for use by the synchronous condenser into the future. Planning PERMISSION is being sought for a duration of 10 years. This application represents a relocation within Moneypoint of a similar application permitted by Clare County Council under Reg. Ref. P19/746. A Natura Impact Statement (NIS) has been prepared and accompanies this planning application.Decision record indexed
    Decision16 July 2020View record
Showing 1-17 of 17
PreviousPage 1 of 1Next