Planning records

Showing 1-7 of 7 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/6426Granted

    Corracunna, Mitchelstown, Co. Cork, P67 KV27.

    Permission to construct a single storey extension to side of existing dwelling and ancillary worksDecision record indexed
    Decision13 January 2026View record
  2. © OpenStreetMap
    24/6272Granted

    Corracunna, Coolnanave Garrane Mitchelstown Co. Cork

    The application site comprises an area of c. 5.61hectares. The site is primarily located in the townland of Corracunna and is surrounded by agricultural lands to the North and East, with the N73 national route to the south, and the L90813 local road to the west. The site takes in lands at Coolnanave and Garrane, on the western side of the L90813, to the west and north west of the main site area, to provide woodland planting and an underground drainage pipe and outfall. The proposed development comprises the construction of an anaerobic digestion facility to produce renewable biomethane, CO2 (which will be captured) and a bio-based fertiliser from organic material. The total proposed gross floor area of the development (including internal plant areas and ancillary structures) will be c. 3,419.5 sq.m. Permission for the; (1) Demolition of existing single storey disused agricultural buildings, silos, and tank within the western portion of the site (total demolition gross floor area (GFA) of c. 1,781 sq.m). One single storey agricultural building (with GFA of c. 87.8 sq.m and height of c. 5.1m) will be stabilised and retained as a biodiversity building. (2) Construction of 3 no. digesters (c.15.6m in height), 2 no. digestates storage structures (c. 15.5m and 11m in height), 2 no. liquid storage tanks (c.12.2m in height) and a liquid feed tank (c. 8m in height), located in the southeast portion of the site. (3) 3 no. pasteurisation tanks (each c. 6m in height), a post-pasteurisation cooling tank (c.12.2m in height) and pre fertiliser manufacturing tank (c.12.2m in height), located in the centre of the site. (4) part single-storey and part two-storey reception hall (with a GFA of c. 2,112.6 sq.m and an overall height of c. 15.5m) to accommodate a laboratory, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to the reception hall, located in the central portion of the site, to the north of the digesters. (5) a single-storey solid digestate storage and nutrient recovery building (with a GFA of c. 879.9 sq.m and a overall height of c.12.4 in height) will be located to the west of the reception hall, in the central portion of the site. (6) Odour abatement plant (with a maximum height of c. 6m in height) and equipment, a digestate offtake area, and a fuel tank (c. 1.6 in height) will be provided to the north of the solid digestate storage and nutrient recovery building. (7) Construction of an ESB substation (c. 3.4m in height) 2 no. CO2 tanks and a CO2 loading pump (c. 14.5m in height), along with associated plant structures including CO2 auxiliaries, CO2 liqueufactor, a CO2 compressor and a CO2 pre-treatment skid (with an overall height of c. 6.7m), located in the southwest portion of the site. (8) Construction of a biogas treatment skid, a biogas compression system, a biogas upgrading module (with an overall height of c. 5.1m) and a grid injection unit within a fenced compound (c. 2.8m in height), located within the southwestern portion of the site. (9) Construction of an emergency biogas flare (c. 11.3m in height) 2 no. propane tanks (c. 1.3m in height) and a grid off take skid, located further to the west of the site. (10) Construction of O2 generation unit (c. 2.6m in height), a biomethane boiler (c. 5.6m to top of flue stack), a combined heat and power (CHP) unit and panel room (with a maximum height of c. 6m to top of flue), 2 no. pump houses (c. 2.6m in height, each with a GFA of c. 29sq.m) located in the southwestern portion of the site, south of biogas upgrading structures. (11) Construction of a two-storey ancillary office and administration building (with an overall height of c. 8.6m and GFA of c. 271.5 sq.m), located within the western portion of the site, adjacent to the main site entrance. (12) A discharge pipe route extending to the northwest of the main anaerobic digestion facility site, crossing the L90813 and through agricultural lands to the River Funshion. (13) Alterations to theDecision record indexed
    Decision27 November 2025View record
  3. © OpenStreetMap
    20/6223Granted

    Corracunna AGI (Above Ground Installation) Mallow-Dublin Road (N73) Corracunna Mitchelstown, Co. Cork

    The replacement of approximately 346m of existing 2.4m high chainlink fencing and associated access/emergency gates with 346m of new 2.4m high green palisade security fencing/gates and all associated site works at an existing above ground natural gas installation.Decision record indexed
    Decision23 November 2020View record
  4. © OpenStreetMap
    20/5631Granted

    Corracunna Mitchelstown Co. Cork

    Permission for alterations and extensions to an existing dwelling and permission for retention of an existing extension.Decision record indexed
    Decision23 September 2020View record
  5. © OpenStreetMap
    19/6089Granted

    Corracunna and Garryleagh near Mitchelstown Co. Cork

    The demolition of existing agricultural structures and construction of a Central Gas Injection Facility within a site area of ca. 1.8ha, comprising of; a concrete apron; 16 no. truck bays, a welfare/office facility; Medium Voltage substation; 8 no. pressure reduction skid units; 2 no. boiler units; network entry facility unit; flare unit; odorant injection unit; propane storage; compressed natural gas refuelling area, electrical and instrumentation kiosk; generator kiosk; transformer kiosk; 8 no. compressor container units; 4 no. gas chromatograph units; covered shelter for storage of gas bottles; compressed natural gas dispenser; compressor building; on site drainage; underground pipework; 1 no. new site entrance from the N73 and associated drainage to serve the proposed facility nad adjacent existing Corracunna Above Ground Installation facility and the removal of the existing Corracunna Above Ground Installation entrance and; all associated site development works. The Major Accident Regulations apply to this development; it is a lower tier development. Permission is sought for a period of 10 years.Decision record indexed
    Decision19 May 2020View record
  6. © OpenStreetMap
    19/5857Granted

    Corracunna Mitchelstown

    Permission for retention of the removal of a ditch and to construct a bell mouth vehicle entrance to woodDecision record indexed
    Decision02 April 2020View record
  7. © OpenStreetMap
    19/6985Granted

    Corracunna Mitchelstown Co. Cork

    The construction of a new dwellinghouse, detached domestic use garage, a waste-water treatment system, a new splayed vehicular access to the site and all other associated site works.Decision record indexed
    Decision13 February 2020View record
Showing 1-7 of 7