to
to

Planning records

Showing 1-6 of 6 public records
PreviousPage 1 of 1Next
  1. © OpenStreetMap
    25/6052Granted

    Dereenacreenig West Wind Farm Ltd., Dreenacreenig West, Drimoleague, Co. Cork

    Permission for a windfarm development at this site within the townland of Derrenacrinnig West. The proposed Grid Connection traverses the townlands of Derreenacrinnig West, Barnagowlane West, Glanareagh, Gortnacowly, Ards Beg, Ardrah, Laharanshermeen, Maulraha, Maulikeeve, Derryarkane, Cappanaboul, Skahanagh, Gortroe, Shandrum Beg, Shandrum More, Dromloughlin, Ballylickey, Crossoge. Temporary works will be required to accommodate the delivery of the turbine components. These temporary works are included as part of this application and are located in the townlands of Castledonovan, Derreenacrinnig East, and Derreenacrinnig West. The development will consist of: Construction of 3 no. wind turbines with an overall ground to blade tip height of 119.3m with a rotor diameter of 82m and a hub height of 78.3m. Construction of 1 no. permanent 20 kV Electrical Substation, all associated electrical plant and equipment, all associated underground cabling, and all ancillary structures and works. Construction of one Temporary Construction Compound with associated temporary site offices, parking areas and security fencing. Upgrade and reuse of existing hardstands. Upgrade and reuse of existing internal site access roads. Provision of Biodiversity Enhancement Area. All associated underground electrical and communications cabling connecting the wind turbines to the wind farm Electrical Substation. Construction of approximately 10.75 km of 20kV overhead line (OHL) Grid Connection, the OHL to be constructed consists of c. 157 wood poles (ranging from 9m to 15m above ground) supporting electrical conductor lines and ancillary structures and equipment. Installation of approximately 3.3km of underground cable ducting Grid Connection and associated electrical cabling, and all other ancillary works including joint bays, culverts, marker posts and all associated developments. Construction Haul Route works along the L-8767, L-4711 and L-8765. A 10 year permission and a 40 year operational period from the date of overall commissioning of the entire wind farm is being sought. However, part of the substation and all of the Grid Connection will be owned and operated by ESB networks and as part of the national grid infrastructure, their life can extend beyond the life of the windfarm. Accordingly, permission is sought for the Grid Connection and substation in perpetuity. The development is covered by the provisions of the Renewable Energy Directive III (Directive 2023/2413). This planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. apply. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted with the application. The planning application and EIAR may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority, Norton House, Cork Road, Skibbereen, Co. Cork. P81AT28 during its public opening hours, I.e. 9.00am to 4.00 p.m. Monday to Friday (excluding public holidays). A submission or observation in relation to the application and EIAR may be made in writing to the Planning Authority on payment of the prescribed fee, €20, within the period of 5 weeks, beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.Decision record indexed
    Decision14 April 2026View record
  2. © OpenStreetMap
    2560759Granted

    Crossoge, Dunlavin, Co. Wicklow

    Agricultural shed with slatted unit and underground storage tank and all ancillary site worksDecision record indexed
    Decision12 November 2025View record
  3. © OpenStreetMap
    2461569Granted

    CROSSOGS, NEWMILLS, LETTERKENNY

    EXTENSIONS TO AND THE CHANGE OF USE OF GRANTED DOMESTIC GARAGE TO A SMALL CAR REPAIR, PREPARATION AND STORAGE UNITDecision record indexed
    Decision16 January 2025View record
  4. © OpenStreetMap
    2460553Granted

    CROSSOGS, GLENSWILLY, CO DONEGAL

    ERECTION OF A NEW AGRICULTURAL SHED AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
    Decision12 June 2024View record
  5. © OpenStreetMap
    D23B/0473Granted

    Crossogs, 32 Glenart Avenue, Blackrock, Dublin, A94T1W6

    Development of an existing two storey detached property including removal of a single storey garage to the side, shed to the rear and previous single storey attached extension to the rear of house, the construction of a new single storey kitchen to the eastern side, a new single storey addition to northern rear side including living room, bedroom and toilet along with internal circulation reconfiguration, conversion of existing attached garage into study, the addition of a hipped roof on existing eastern side with consolidation of existing windows, widening of bedroom windows on first floor on southern and northern facades, the construction of a detached single storey workspace and shed in rear garden, landscaping to the front and rear and all associated site works.Decision record indexed
    Decision08 December 2023View record
  6. © OpenStreetMap
    211113Granted

    Crossoge, Dunlavin, Co Wicklow

    Construct a single storey dwelling house, onsite secondary sewerage system, bored well, alterations to existing entrance and all ancillary site worksDecision record indexed
    Decision27 October 2021View record
Showing 1-6 of 6
PreviousPage 1 of 1Next