Planning records
Showing 1-50 of 924 public recordsTo construct a new dwelling house and garage complete with an access road, sewage treatment system and ancillary works
To construct a dwelling house, entrance, driveway, wastewater treatment system and all associated site works
To RETAIN both the first floor development and the private domestic garage as constructed with associated ancillary site works and PERMISSION to construct an extension to the side of the existing dwelling
To construct a new dwelling house, outbuildings and garage, new entrance, access road, and install a new wastewater treatment system along with all associated works
For change of use of Kilmurry McMahon Parochial House from residential use to community space use featuring a meeting room, kitchen and multi-purpose rooms and all other necessary ancillary services. The application site is within the curtilage of a protected structure, RPS No 893 St. Mary's Church. The subject application does not propose any changes or alterations to the protected structure or its curtilage
For (a) the construction of an extension to the rear of an existing derelict dwelling house and (b) permission to carry out alterations to the existing dwelling, (c) upgrade the existing sewage treatment system, permission to construct a new garage and a new site entrance along with ancillary works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To construct a new dwelling house, granny flat and garage complete with a new entrance, sewage treatment system and ancillary works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To extend and renovate an existing derelict cottage, relocate an existing entrance along with all necessary ancillary work
To construct a slatted beef house with an underground slurry tank with internal and external feeding passages
For development to construct a Livestock Slatted Unit with associated ancillary site works
To construct an extension to the rear of an existing dwelling house along with alterations to the existing house and ancillary works
To construct a new dwelling house, access road, entrance, and install a new wastewater treatment system along with all associated works
To construct agricultural slatted unit, plus machinery/storage shed, silage slab, concrete yard plus all ancillary site works
For development to extend existing livestock slatted unit with cubicles and manure pit with associated ancillary siteworks
To construct a machinery shed, manure pit/ dungstead, extend the existing easy feed slatted house to include slatted tank and straw bedded loose house at eastern side and straw bedded loose house at western side, ancillary concrete and all ancillary site works.
To construct a new dwelling house, private garage, site entrance, on-site wastewater treatment system and all associated site works and services. The planning application will be accompanied by a Natura Impact Statement (NIS)
For development in the townlands of Ballyartney, Ballygeery East, Ballygeery West, Cloonkerry West, Cullenagh, KilKerin, Killofin, Knockphutteen and Lakyle North, Co Clare. The proposed development will include; (1) An extension of the existing Kilkerin Point 220 kV Line Cable Interface Mast (LCIM) compound, to facilitate new electrical equipment for the connection of two new 220 kV cable circuits, including: (a) A new control cabin (approximately 13.4sqm floor area by 3.5m high, which includes 0.85m ground clearance) and 2 no. parking spaces; (b) Associated 220 kV electrical equipment including, cable sealing ends, insulators, overhead conductors, surge arrestors and lightning masts measuring 15m high (tallest compound structure); (c) 220 kV underground cabling from the associated underground transition pits to the cable sealing end equipment; palisade fencing (approximately 2.6m in height, up to 3.5m in height, including anti-climb device) and gates; and associated landscaping. The development will also comprise; (2) A new fibre optic cable measuring an approximate length of 8.9km routed between Kilkerin Point LCIM compound (townland of Lakyle North) and Prospect 220 kV substation (townland of Ballygeery West); (3) Decommissioning of existing 220 kV electrical equipment, security fencing and gate at Kilkerin Point 220 kV compound; and (4) All ancillary site development works including site preparation works, site clearance and levelling, hardstanding, internal access tracks and temporary construction compound. This planning application is accompanied by a Natura Impact Assessment (NIS)
For a new machinery shed
Of the construction of an extension to an existing dwelling along with all associated works
To erect a 30m high telecommunications lattice mast carrying antennas and dishes together with associated ground based equipment all enclosed in security fencing and to remove the existing 24m high telecommunications support structure
To construct a storage shed/private garage with a solid fuel storage area along with all associated works
To construct a private garage with solid fuel storage area along with all associated works
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
To build a new dwelling house, a private garage with new on-site sewage treatment system and all necessary ancillary services.
For development which will consist of: 1 No. enclosed battery energy storage system compound on a total of c. 6.2 hectare site, to include: 1 no. 220kv GIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 220kv transformer and four no. auxiliary transformers, up to 192 battery storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), 16 transformer and 32 inverter units. Including access tracks and site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV system, landscaping works and all associated ancillary infrastructure. The proposed development will have a projected life span of 35 years. A Natura Impact Statement has been prepared to accompany this application
For the construction of a slatted unit and associated site works
To RETAIN excavation works carried out on site and PERMISSION for the construction of a milking parlour and associated site works
To apply for a 10 year planning permission for development on a c. 1 ha at Ballygeery West, Co Clare. The development will consist of the development and operation of a 250 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare behind the existing ESB substation for the purpose of stabilising the electricity grid will consist of the following elements; Compound building, within which the synchronous condenser generator and flywheel will be located (540m2c.7m high), Synchronous condenser, with a 250-500 MVA (electrical rating); Cooling equipment (c.160sqm., c. 3m high); 6 No. modular containers to house electrical and Control equipment (total area of c. 195sqm., c. 5m high), A generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker (c.8m high); 1 No. firefighting water tank and pump, An above-ground oil separator and collection pit, Boundary fencing (c.3m high), palisade security entrance gate and CCTV, c.100m of underground cabling ducts and cable to the neighbouring ESB substation, All other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of area of hard standing including a maintenance lay-down area. Planning PERMISSION is being sought for a duration of 10 years
To construct a dwelling house, domestic garage, car port, entrance, effluent treatment system including all ancillary site works and services
To RETAIN extension works to existing dwelling and site entrance also permission to complete works including all ancillary site works.
For the Construction of a Single Storey Detached Studio Building to rear of dwelling site include Lobby, Office, Toilet & Open Plan Studio area including connection to services, Also for permission for RETENTION of Garden Room Building with raised deck & also Extension and alteration to existing outbuildings to create Storage Shed Including
For the construction of an extension to the rear and front of an existing dwelling house along with alterations to the existing house and ancillary works
To retain and widen existing farm entrance plus all ancillary site works
To RETAIN the developed attic space, additional velux roof lights and front boundary wall as constructed
For a machinery/storage shed & planning PERMISSION to construct a slatted shed incorporating a calf creep along with all associated works
Of the construction of an extension to an existing dwelling and extension to existing sheds along with all associated works
To construct a new dwelling house, access road, entrance, private garage and install a new wastewater treatment system along with all associated works
For development, the development consists of the construction of a slatted unit and associated site works
To decommission the existing septic tank and install new wastewater treatment system with all necessary ancillary services
To demolish part of the existing dwelling house and to construct an annex extension to the dwelling house to include minor elevational changes and the upgrade of the existing wastewater treatment system along with all other associated site works and services.
Of existing structures and site boundaries
For construction of an easy feed slatted house comprising underground slatted slurry tanks, feed area for cattle, agitation point, calf penning area, central passage, walled in manure pit, and cattle crush on site of old cubicle house to be demolished and all ancillary site works
To demolish existing side extension and construct a replacement side extension to the existing dwelling house along with all associated site works
To construct a dwelling house, shed and proprietary waste water treatment system along with ancillary site works
To extend and refurbish an existing house along with all associated works
To construct an additional entrance to dwelling property and construct a new front wall with railing, planning permission to relocate the existing percolation area and planning permission to revise their site boundaries as granted under P09-634 along with all associated works
To construct a new dwelling house and garage complete with a sewage treatment system and ancillary works
To demolish existing house & garage damaged by fire and the construction of a new dwelling house and garage along with all associated works