Planning records
Showing 1-3 of 3 public recordsFor the removal of the existing flagstone paving and access steps to the Cathedral entrance plaza; the construction of a new reconfigured stepped stone access together with new stone paving to the entrance plaza; the refurbishment of the existing Marian shrine; and all associated site development works and services necessary to facilitate the proposed development at St. Peter & Paul Cathedral, Upper O'Connell Street, Ennis, Co. Clare. The proposed development is located within the curtilage of the protected structures of St. Peter & Paul Cathedral (RPS No.781) and the Parochial House (RPS No 782)
To upgrade existing Cathedral heating system which will provide for a new gas boiler plant room outside existing scout hall, block up existing window and relocate stone plaque to scout hall, together with underground ducting to connect to existing gas supply and existing underground boiler house and all associated site development works and services necessary to facilitate the proposed development. The proposed development is located within the curtilage of the protected structures of St. Peter & Paul Cathedral (RPS No.781) and the Parochial House (RPS No 782)
For development works at Cathedral House, Station Road, Ennis. The works will consist of the following: a. Replacement of roof coverings. b. Replacement of windows. c. Extension of first floor over kitchen area. d. Demolition of rear shed and construction of replacement shed. e. New side entrance to house and modification of entrance to chapel. f. Internal works including installation of lift. installation of new bathrooms, upgrade to mechanical and electrical services and all associated drainage and site works. The Cathedral House is a Protected Structure, ref E82, NIAH # 20001096.