The Church of St. Paul, Church Street Townparks, Cahir
The construction of a single storey structure ancillary to the existing Church building located at the south east boundary wall to facilitate (a) a new universally accessible toilet (b) a storage room (c) the relocated oil tank and all associated site works within the curtilage of a protected structureDecision record indexed
The existing dormer window on the rear elevation of my building and planning permission for change of use of the building from commercial to residential, make modifications to the existing elevations and all associated site development worksDecision record indexed
Existing first floor rear extension and permission to complete construction of first floor apartment, modifications to the existing building and all associated site development worksGrounds not yet categorised
A canopy structure to the rear of the existing shop as well as planning permission to erect photovoltaic cells on the existing roof of the existing shop and all associated site worksDecision record indexed
An extension to Dolan's Supervalu in 2 separate phases. Phase 1 - retail extension to the north side of the existing facility and Phase 2 - to extend the north entrance such that it reflects the entrance to the south and all associated site worksDecision record indexed
(i) signage, (ii) 2 no. benches, (iii) 2 no. canopies and (iv) the alteration of a window to provide a service hatch - all to the Castle Street elevationDecision record indexed
Change of use of part of the stable building into residential and the reinstatement of the facades and fenestration to its original condition and for permission for change of use of the remaining part of the stable building to residential, including all associated site development works. This property is within the curtilage of a Protected Structure, RPS Reference No. 1284Decision record indexed
Retaining indefinitely the change of use of part of stable building to residential unit and PERMISSION for change of use of remaining stable building to additional residential unit, make modifications to said building and all associated site development worksGrounds not yet categorised
A change of use and alterations of former coach house which is in the curtilage of 7 Castle Street, a Protected Structure (TRPS1317). Works will include the following: (i) change of use of existing coach house to domestic accommodation ancillary to the main house, (ii) alterations to existing elevations and internal layouts and (iii) all other associated landscaping and ancillary site worksDecision record indexed
The works to a protected structure reference no.: TRPS1317 including minor internal and external alterations, the construction of a rear extension, external landscaping and all associated site worksDecision record indexed
The Former Bank of Ireland, The Square, Cahir Co. Tipperary
The as constructed residential unit within the former stable building including all associated site development works at the rear of the former Bank of Ireland. The works have been carried out within the curtilage of a Protected StructureGrounds not yet categorised
Change the use of portion of the rear area of existing retail outlet from storage to limited seating area, with minor internal alterations all at premises trading as The Keep Coffee. Please note that No. 4 Castle Street, Cahir, Co. Tipperary E21 EW 21 is a protected structureDecision record indexed
Works to a protected structure (TRPS1317) which include external works to the rear windows, installation of slim profile double glazing and internal works to remove walls and install a new kitchenDecision record indexed
A single storey extension to existing dwelling house. Retention Permission is also required for the existing porch to front of existing dwelling and all associated site worksDecision record indexed
(i) change the use of an existing restaurant to a beauty salon (ii) to create a window to the rear of the unit and (iii) to reconfigure the internal layout of same and all associated site development worksDecision record indexed
(i) the demolition of an existing building (ii) the erection of a single building containing 9 no. apartments (iii) walled bin storage and bicycle parking & (iv) connection to existing public foul and surface water sewers and all associated site worksGrounds not yet categorised
1) the extensive refurbishment of the building and the demolition of a single storey component to the rear elevation, 2) the construction of a two storey modern extension to the rear elevation and also, there will be various alterations to the exterior facades of the existing building, 3) the development of six apartments consisting of 4 two bedroom apartments and 2 one bed apartments, 4) the upgrade and improvement works to the wastewater and stormwater connections, 5) the material change of use from commercial space to residential units, 6) the construction of a bin storage area, bike stands, parking area, footpaths, hard and soft landscaping areas and all associated site worksDecision record indexed
(i)Demolition of an existing building, (ii) the erection of a single building containing nine apartments, (iii) enclosed bin storage area and bicycle parking and (iv) connection to existing foul and surface water sewers and all associated site worksDecision record indexed
(i) the demolition of an existing building, (ii) the erection of a single building containing twelve apartments, (iii) enclosed bin storage area and bicycle parking and (iv) connection to existing foul and surface water sewers and all associated site worksGrounds not yet categorised
Alter and extend the existing health centre, and to alter and repave the area in front of the building to incorporate sloped access, level landing and a planting bed. The extension will form an addition to an existing single-storey extension at the back of the buildingDecision record indexed
(i) change of use of part of existing 2-storey annexe to rear of main 3-storey building from office use to single residential unit with internal refurbishment to include internal plastering in lime plaster, replacing existing timber floor wiring, plumbing, sanitary ware etc and (ii) for single storey extension to existing storage room to accommodate a new comms room at rear ground floor of main 3-storey building together with all necessary internal modifications and external site works to both of the above (Protected Structure S1022)Decision record indexed
St. Mary's Catholic Church, St. Mary's Road, Townparks Cahir
Installation of metal guard railings to the existing retaining wall facing west towards St. Mary's Road at Protected Structure RPS Ref S240Decision record indexed
Development of an Integrated Constructed Wetland (ICW) for the treatment and management of wash waters arising from the Mart's facility. The existing Balancing tank will be retained. Flows from the existing tank will be routed via new pipework to the ICW for treatment. The proposed ICW will consist of a screen, settlement tank, 3 ICW treatment cells, discharge tank, pipework and associated works. Discharge flows, following treatment will be to the River Suir within the ownership boundary of the siteDecision record indexed
Single storey extension to rear, infill extension to front of property, alterations to elevations; reconstruction of driveway and entrance; new garage structure, new site fencing and all necessary services and siteworksDecision record indexed
Single level extension to rear and side, reconstruct existing roof to allow for attic conversion including dormer windows; alterations to elevations; reconstruction of driveway and entrance; site fencing and all necessary services and site-worksDecision record indexed
(i) to increase the height of the existing roof and install 2 no. dormer roof windows & (ii) to enlarge the existing windows and front door to the existing dwelling and all associated site worksDecision record indexed
Six parking spaces to the west facing side and relocation of the existing gas tank to the east and Permission for internal modification to existing offices, waiting area, toilets and canteen and the construction of new waiting/reception area, toilets, store at ground floor level and new first floor extension mezzanine extension consisting of staff canteen, store and open plan area (103.25 sqm) together with all associated site worksDecision record indexed
The construction of all-weather sports facilities to the rear of the school including the following: a) a 3 lane, 400-metre athletic running track, with a 6 lane, 100-metre sprint track, b) an all-weather pitch for soccer and GAA games, c) track and field sports including long jump, high jump, shot put, boules, miniature-golf course, d) a perimeter walkway/running track with low level lighting around the existing amenities, e) flood-lighting to the main all-weather pitch and track and field sports, f) two new paddle courts with flood lighting and associated fencing, g) proposed ball stop netting, h) proposed dugouts, i) ancillary structures such as a small retaining wall between the all-weather pitch and the existing grass pitch, steps, footpaths, fencing and gates. The works include all landscaping, drainage, ancillary works and servicesDecision record indexed
(i) the use of the existing building for the sale of coffee for consumption off the premises in addition to the existing established uses within the premises (ii) for new window pod extension (iii) for material alterations to the existing elevations of the existing building (iv) for new signage and all associated site worksDecision record indexed
A) proposed new astro-turf training pitch complete with perimeter fencing and ball stop netting, b) proposed new 6m high hurling/football ball wall, c) proposed new floodlighting installation to new astro-turf and existing grass pitch to include new lighting poles, d) all associated site worksDecision record indexed
A) the construction of four new extensions with a total combined floor area of 2,522.50m², comprising - (i) extension 1 (2,367m²), a part single storey and part two storey extension to the west of the existing school building. Extension 1 comprises a 4 no. classroom SEN base, 6 no. general classrooms, 4 no. specialist classrooms, 3 no. SET rooms, as well as storage, toilets, locker/social spaces, and other ancillary accommodation. Extension 1 is connected to the existing school by two short link corridors. Extension 1 includes solar PV panels on the roof; (ii) extension 2 (58.5m²) and extension 3 (58.5m²), both single storey extensions located within a service yard to the east of the existing school building. Extensions 2 and 3 are both technology preparation rooms and are attached directly to existing technology classrooms, and; (iii) extension 4 (38.5m²), a single storey external store extension; b) demolition of part of the existing service yard, including four small stores (total area 67.4m²); c) construction of a new 2.1m high rendered wall and vehicular gates to the modified service yard, and construction of a new covered storage area; d) modifications and extension to the existing car park to provide additional car parking spaces and an SEN set down area; e) two new covered bicycle shelters and relocation of the two existing covered bicycle shelters; f) provision of a new heat pump compound enclosed in 2.1m high palisade fencing; g) construction of an SEN enclosed play area and a sensory garden; h) all ancillary site development works, including new hard and soft landscaping, an underground firefighting static storage tank, a swale and a soakaway, and i) all associated site services, including external lighting and EV chargingDecision record indexed
(i) an existing signage as well as PLANNING PERMISSION to (ii) construct a new storage building, (iii) erect new signage and all associated site development worksDecision record indexed