Planning records
Showing 1-50 of 30,406 public recordsThe development will consist of: I. 384 residential units with a cumulative gross floor area of 33,190.15 sq.m comprising: a) 122. houses, consisting of 28 two-bed units, 83 three-bed units and 11 four-bed units, ranging in height from 2-3 storeys. b) 84 duplex units, consisting of 48 one-bedroom units and 36 three-bedroom units, ranging in height from 2-3 storeys. c) 178 apartments consisting of 43 one bedroom units and 135 two-bedroom units, ranging in height from 5-7 storeys. II. tenant amenity floorspace with a gross floor area of 139 sq.m. III. 1.49 ha of public open space including a public plaza and 0.15 ha of communal amenity space; IV. the provision of a childcare facility with a gross floor area of 239 sq.m and associated play area; V. the provision of 361 car parking spaces, including 10 disabled parking spaces and 16 reserved for visitor parking and 3 reserved for creche staff. VI. the provision of 734 bicycle parking spaces, including 472 residents bicycle parking spaces and 262 visitor cycle spaces. VII. vehicular access is proposed via 3 access points including the existing Kingswood roundabout on Citywest Avenue to the north, The Walk to the west and from the park and ride access road at the eastern end of the site. Dedicated pedestrian/cyclist links are proposed throughout the site. VIII. ESB substation, 3 x ESB kiosks, rooftop solar photovoltaics, landscaping and all ancillary site and development works.
Development at a site of 1.65ha comprising of the erection of secure anti-climb wire-mesh fencing around the perimeter of the existing building at a height of 2.1m, with associated landscaping works to screen the fencing. The provision of electronic vehicular access gates off the internal access road for access to rear service compound and car parking, vehicular barriers, and internal access footpaths, in addition to all associated site development works.
Erection of secure fencing and gates to the perimeter of the site, including all associated site development works, landscaping and planting.
Residential development consisting of 99 dwellings comprised of 84 two storey houses, 15 apartments and duplex units accommodated in 2 three storey blocks; the proposed houses are comprised of 9 two bed houses, 71 three bed houses, 4 four bed houses; the proposed apartments & duplex units are comprised of 6 one bed units, 3 two bed units and 6 three bed units, also providing for all associated site development and infrastructural works, car and bicycle parking, ESB sub-station, open spaces and landscaping, bin and bicycle storage; access to the development via a new vehicular entrance on the western boundary of the site, off the existing access road to the Luas park & ride facility on a site area of 3.14ha bounded to the north by Citywest Avenue, located east of a permitted residential development known as Citywest Village and existing ESB sub-station and is north of the Luas red line.
Installation of energy storage units at an existing datacentre facility. The energy storage will consist of two new battery storage units, 2 new HV power skids (PCS transformer and HV RMU), two new MV transformers, concrete slab, security fence of 2.4 meters height including two new internal gate entrances.
The installation of an energy storage unit at an existing data centre facility. The development involves the placement of three ISO 40ft. shipping containers containing back up storage units at Keppel Data Centre, Citywest Avenue, Citywest Business Park, Dublin 24
Amendments to the development permitted under Reg. Ref. SD18A/0301 comprising of alterations to the permitted two storey data centre building including internal reconfiguration, alterations to finished floor levels, alterations to the building footprint to provide for the relocation of an internal staircore to the south of the building, and the replacement of the enclosed first floor level with an open screened roof mounted plant space (resulting in a reduction of 4,091sq.m in the gross floor area (GFA) of the data centre building); Associated alterations to the facade of the data centre building, including alterations to fenestration, cladding, step-out in the southern facade to accommodate a staircore, and a reduction in the eastern building parapet height of c. 2 metres; Provision of a canopy over the loading docks on the east facade; Alterations to the permitted generator compound, generators, and flues, including a reduction in the number of generators (5 now proposed), and provision of MV rooms within the generator compound; Provision of an ESB substation compound in the north-eastern portion of the site, comprising a single storey substation building (with a GFA of c. 125sq.m), within a 2.6 metre high security fence, 2 transformers, client control building (with a GFA of c. 47sq.m), and associated access arrangements; The ESB substation compound will be accessed from Kingswood Drive; Omission of the permitted sprinkler tank, pump room and 10kV Substation, reconfiguration of the permitted car parking, and revisions to permitted boundary treatments; Associated alterations to landscaping, access and internal road arrangements, services, lighting, and layout, and all associated and ancillary works.
Installation of site services including the construction of a new gravity foul sewer, foul pumping station and rising main discharging to the public sewer, connection to the public watermain, boundary landscaping and planting treatments including removal of central hedgerow, provision of 'green link' path. Installation of a sub-surface collector drain and infilling of central dry drainage channel. Vehicular and pedestrian/cyclist access points, internal road commencement (details as marked on submitted plans) and all ancillary development works as necessary to facilitate future development at this site.
Construction of 4 warehouse/industrial units in 3 buildings of c.13,611sq.m total gross floor area (including ancillary offices and operational facilities) and up to 15m in height, with rear service yards; 155 car parking spaces; 72 cycle parking spaces; water services infrastructure and sustainable urban drainage system features, including relocation and resizing of a pump station permitted under SD15A/0391; internal road network accessed via 2 site entrances established in the previous planning applications on the Eastern and Southern sides of the site, via the roundabout at Citywest Avenue and the R136 outer ring road; amendments to the proposed tree pits along the green-link permitted under SD15A/0391; public lighting, landscaping, planting and boundary treatments throughout the development; all other necessary site and infrastructural works to facilitate the development.
Retention/change of use for existing development and shed/outbuilding; the development was originally built for residential purposes but is currently being used as a childcare facility.
Permission to install a standby industrial diesel generator and solar panels. The generator will include a bunded fuel tank and be located within a mesh enclosure. The proposed solar panels will be attached to a steel frame to be erected adjacent to the generator ( Covering an area of approximately 32 sq.m, to a maximum height of 4.8 meters above ground level ). Works to include all ancillary development works, all located within an existing fenced compound.
Permission for partial change of use from Warehouse to Office use at ground floor level with floor area of 297 sq.m; extension for office use at first floor level with floor area of 256 sq.m; addition of staircase from warehouse to first floor level; to include all associated site works to facilitate the development. Amendment to previously approved planning permission (Ref. No. SD22A/0465) to remove the 133 sq.m Mezzanine level in the description of the development and submitted plans and particulars at Unit 2B, South West Business Park, Cheeverstown, Citywest, Dublin 24.
Partial Change of use from warehouse to office use with floor area of 551sq.m; Addition of mezzanine level with a floor area of 133sq.m; Addition of staircase from warehouse to mezzanine level to include all associated site works to facilitate the development.
10-year planning permission for Phase 2 development (Unit 4); the construction of 1 industrial/warehousing unit of approximately 14,730sq.m gross floor area (including ancillary offices and operational facilities) and up to approximately 17m in height, with rear service yard; 155 car parking spaces; 72 cycle parking spaces; water services infrastructure and sustainable urban drainage system features; 2 entrances and internal road network, which will connect to Citywest Avenue and the R136 Outer Ring Road via the internal estate road network proposed under Reg. Ref. SD21A/0150; pedestrian/cycle entrance to the south-east at Citywest Avenue; public lighting; landscaping, planting and boundary treatments throughout the development; external sprinkler tank and pumphouse; and all other necessary site and infrastructural works to facilitate the development on a site generally bound to the east by the R136 Outer Ring Road, to the south by Citywest Avenue and to the west and north by undeveloped lands subject to a Phase 1 industrial/warehousing development planning application (Reg. Ref. SD21A/0150) and having been granted planning permission for infrastructural and enabling works under Reg. Refs. SD15A/0391 (extended by SD15A/0391/EP) and SD16A/0400, and with the Phase 1 industrial/warehousing development planning application (Reg. Ref. SD21A/01.50) currently being assessed by South Dublin County Council.
For Blanket installation of photovoltaic panels (PV) over existing warehouse roof footprint circa 11,400m2 and all associated works. PV panels will not extend above parapet line. Permission is being sought as building is located between Baldonnell and Tallaght University Hospital Solar Safeguarding Zones
Permission for alterations to existing building (unit 1) to the southwest elevation, namely, 2no. additional dock levellers and re-location of 1 existing roller door and all associated site works
Retention Permission for ground floor front and rear extensions with pitched roof.
Retention of a single -storey shed/garden room circa 24sqm to rear of existing property
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2 no. roof windows to the front and flat roof dormer to the rear.
Change of use of an existing single storey detached store (floor space - 154sq.m) to a research and development gas innovation workshop and store.
Permission for development at this site of c. 0.22 hectares at lands. This application site consists of: Parcel A, measuring c. 0.13 hectares, which is principally bounded by the red line rail LUAS tracks associated with the Citywest Campus Luas stop to the north/northwest, existing dwelling No. 19 Citywest Village Avenue to the south, The Mews, Citywest Village residential development and existing dwellings No. 1 The Court and No. 4 The Place to the east and Citywest Village Avenue (road) to the west; Parcel B, measuring c. 0.08 hectares, is principally bounded by The Court (road) to the north, existing dwellings Nos. 10, 12 and 14 The Place to the south, residential development known as Árd Mor Dale to the east and existing dwelling No. 4 The Court to the west; and Two existing parking spaces north of The Court road will be allocated to the proposed childcare facility. The development will consist of the construction of a mixed-use development comprising 12 no. residential units (4 no. apartments and 8 no. houses), coffee kiosk and childcare facility. The apartments, coffee kiosk and childcare facility will be located in a single building arranged across three storeys. The residential units will comprise of 4 no. 1 bedroom apartments (ranging from c.50-52sqm GFA each) with northeast and southwest facing balconies, 4 no. 2 bedroom mid-terrace two-storey houses (c.74sqm GFA each) and 4 no. 3 bedroom end terrace two-storey houses (ranging from c.93-103sqm GFA each) with associated rear private gardens. The apartment building will contain residential bin and bike storage (c.10sqm GFA combined), a coffee kiosk (c.13sqm GFA) with separate bin storage (c.1.5sqm GFA) and outdoor seating area, a three classroom childcare facility with associated office, staff, toilet and laundry facilities (c.135sqm GFA), an external play area (c.67sqm GFA) and external bin and bike store (c.6sqm) serving the childcare facility, all located at ground floor level. The development will also consist of 17 no. proposed car parking spaces, 2 no. existing spaces allocated to the proposed childcare facility, vehicular drop-off zone serving the childcare facility, dedicated bicycle stores in front gardens serving houses, secure visitor bicycle parking throughout, bin storage, open space, public realm areas serving the mixed-use apartment building, hard and soft landscaping, boundary treatment works, photovoltaic panels to houses, pedestrian access, road works consisting of a proposed raised platform/pedestrian crossing over The Court road, provision of Sustainable Urban Drainage systems (SUDS) and all other associated site excavation, infrastructural and site development works above and below ground, including site servicing (foul and surface water drainage and water supply including minor diversion to the existing watermain).
The Construction of new dormer attic structure in mid terrace dwelling consisting of bedroom and ensuite and all associated site works
1 x 50 KWp solar photovoltaic (PV) system on main office building. There will be a total of 156 PV panels on the main office roof and will occupy an area of 257sq.m.
Permission for a proposed Sprinkler Tank & Pump House and Retention Permission for a reduced size ESB substation as part of an overall warehousing development at Kingswood Road, Citywest Business Campus, Co. Dublin. (Existing granted Planning Reg Ref: SD22a/0290 & SD23A/0281 with associated warehousing development works under construction on site). 1. Provision of Sprinkler Tank 10.00m diameter, 9m high, effective capacity = 675m3, to rear (South-west) yard, which will serve the warehouse building's sprinkler system; 2. Provision of Pump House servicing the proposed sprinkler system, 48m2, 2.8m high, adjacent to above referenced sprinkler tank; and 3. Associated site landscape enhancement in the immediate area of the proposed Sprinkler Tank & Pump House. The subject elements for which Retention Permission is sought are as follows: 1. Retention Permission for a reduced size ESB Substation from 37m2 (as granted) to 24m2 as recently constructed.
Permission is sought for development comprising a) the provision of a single storey canopy with metal fascia and column to the carpark elevation of Block 2 at the south office entrance; b) extension of existing paved area (57 sqm) at the south office entrance; c) the proposed canopy will accommodate an area of 2 sqm for signage to the front and side elevation of the canopy and; d) relocation of 3 no. car parking spaces
To apply for planning permission for a proposed Solar PV Panels to the warehouse roof Only as part of an overall warehousing development at Kingswood Road, Citywest Business Campus Co Dublin. (existing granted planning reg ref SD22A/0290 & SD23A/0281 with associated warehousing development works under construction on site). The subject elements for which Planning Permission is Sought are as follows: Provision of 243No Solar PV Panels, overall area525msq, to the warehouse roof only. Elevations Site plan & drainage layout remains the unaltered, and the building area remains as per previous planning applications
The Proposed development will consists of permission of installation of 3no. high level external building signages, one to the Northeast elevation, one to the Southeast and one to the Southwest elevation and all associated works.
Amendments to the Warehouse Development permitted under SDCC Reg Ref SD22A/0290 comprising: the change of use of 272 sq/m of Warehouse Floor Area at Ground Floor Level to Ancillary Office and Staff Facilities; extension of the Ancillary Office and Staff Facilities (within the permitted building footprint) at First and Second Floor Levels (totalling 430 sq.m); elevational changes; provision of an additional 21 no. car parking spaces; relocation of bicycle parking; reduction in the size of the HGV yard; provision of a smoking shelter (3.9 sq.m); and all associated site and development works above and below ground. The total gross floor area of the permitted warehouse development will increase from 11,691 sq.m to 12,121 sq.m
Revisions to permitted house types under Reg.Ref. SD15A/0127 and relates to three house types i.e. house types E1, E3 and E4. It is proposed to modify the ground floor extensions to the rear of 156 of the aforementioned house types.
The development will comprise the provision of a warehouse with ancillary office and staff facilities and associated development. The warehouse will have a maximum height of 18 metres with a gross floor area of 11,691 sq.m including a warehouse area (10,604 sq.m), ancillary staff facilities ( 499 sq.m) and ancillary office area (588 sq.m); The development will also include: a vehicular and pedestrian entrance to the site from Kingswood Road to the north-east; a separate HGV entrance from Kingswood Avenue to the south-east; 64 ancillary car parking spaces; bicycle parking; HGV parking and yard; level access goods doors; dock levellers; access gates; hard and soft landscaping; canopy; lighting; boundary treatments; ESB substation; plant; and all associated site development works above and below ground; 2.56 Ha site at Kingswood Road and Kingswood Avenue, Citywest Business Campus, Dublin 24; The lands are generally bounded to the south-east by Kingswood Avenue, to the south-west by an ancillary car park associated with Citywest Business Campus, to the north-west by Kingswood Business Centre and Ardsolus Residential Development and to the north-east by Kingswood Road.
Internal adjustments to office/staff facilities resulting in a Change of Use of 59sq.m of warehouse floor area to office/staff facilities floor area on the ground floor plan (rear warehouse location) due to increase of 'Ancillary 1 Storey Driver's Office & Staff Facilities' and minor alterations (internal partitions relocation) to internal layouts at 'Main Ancillary Office' with no associated area change. Minor adjustment to dock leveller doors to facilitate detailed structural design and associated elevational adjustments with no area changes. Associated site plan adjustments due to the above alterations. All other details remain as per the granted applications Reg. Ref. SD22A/0290 & SD23A/0281.
Change of use from education to office use within the existing building. No increase in area, external alterations or extensions are proposed.
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.
The development will consist of alterations to the existing east elevation to include the provision of a new external fire escape stairs to facilitate the internal subdivision of the existing office building, together with all associated site and ancillary works.
The installation of an external Air Handling Unit, to be housed in a new timber and metal clad enclosure adjacent to Unit 3030, Lake Drive and the installation of a Heat Pump Unit to be installed within an existing plant enclosure, with additional cladding proposed, in the north east corner of the carpark of Unit 3030 and all ancillary engineering and landscape works necessary to facilitate the development at Unit 3030 Lake Drive, Browns barn, Dublin 24 D24 KX6Y. (Previous planning reference SD25A/0185W )
Provision of 527.2 sqm of photovoltaic solar panels on the roof of the existing building.
Erect 832.00m2 or150.30 kWp of photovoltaic panels on the roof of the existing Lidl store Fortunestown Lane, with all associates site works at Lidl Ireland GMBH
Change of use from existing restaurant use at ground floor to proposed office use (235sq.m).
Attic conversion with 2 roof lights to front and a dormer window to rear plus a single storey shed / garden room (circa 29sq.m) in rear garden with associated site works.
Installation of 2 x 3 meter high extract flues from proposed laboratories; construction of a covered boat storage compound within a secured parking area formed with a new 3 metre high security fence with access gates to the rear (north-west) side of the site, internal alteration within the existing building and all associated site works.
6 two storey, 3 bedroom semi-detached houses and all associated site works on a 0.19 hectare site bound by Silken Park to the north, an existing office development to the south, undeveloped residential zoned lands to the east and Kingswood Road to the west.
Residential development of 21 houses consisting of 10 3-bed, semi-detached houses and 11 3-bed, terraced houses on a site of 0.658ha adjoining revised boundary with Lidl Store to the east and Fortunestown Lane to the south, including all associated site development works, piped and wired services with access off a permitted entrance to Fortunestown Lane being part of an overall site of 12.45ha which has the benefit of an existing permission for 399 dwellings, Reg. Ref. SD15A/0127 (as amended by Reg. Ref. SD16A/0266).
Alterations to existing east and west elevations to include 10 external vents; installation of new photovoltaic solar panels to existing roof; provision of 10 bicycle parking spaces; 2 EV chargers; 1 external condenser and all associated site works.
Ground floor extension to side and rear to provide kitchen, wc, utility and living room with bay window to front elevation; first floor extension to side to provide single bedroom and en-suite double bedroom and associated site works.
A high powered electric vehicle charging station consisting of the: (1) Installation of 2 No: Electric vehicle charging bays, and comprising a parking space and electric vehicle charging unit (2) Installation of a prefabricated ESB substation (3) Erection of associated signage (4) All associated lighting, infrastructure and site development works
We Kingscroft Development Limited seek Planning Permission for modifications to the granted permission (planning reg ref SD16A/0210) at the site west of Citywest Road (N82) South of Garter Avenue/Citywest Avenue, Citywest Dublin 24., The development site is bounded to the east by the N82 Citywest Road, to the North East by Garter Avenue and to the south by lands. The modifications include the change of use of the granted community floor space on the ground Floor of the granted 4 Storey Apartment Building to 1no 2 bed apartment unit and 1no 1 bed apartment unit. All with associated siteworks
Modifications to the granted permission (planning reg. ref. SD16A/0210). The proposed Modifications will consist of the addition of 6 No. apartment units (1 No. 1-bed unit,5 no. 2-bed units) on the third floor and set back floor plan on the Fourth Floor, Increasing the overall Apartment Block from 4-storeys to 5-storeys, and from 20 No. apartment units to 26 No. apartment units (consisting of 4 no. 1-bed units, 22 no. 2-bed units ) and 1 community floor space of 160 sqm. No modifications to as-granted 90 no. houses, The overall total no. of units in this development is now increased to 116. All with associated site works, Bin and Bike storage, the site layout has been modified slightly to accommodate additional surface car parking and other ancillary works.
The development comprises of permission for new signage elements and site development works. As well as retention permission for various minor amendments to the development permitted under South Dublin County Council Planning Reference SD22A/0282. Specifically, 3no additional high power electric vehicle charging units, bollards, and 6no parking spaces, relocation of existing light column and previously approved substation, and all associated site development works.