to
to

Planning records

Showing 1-3 of 3 public records
PreviousPage 1 of 1Next
LRD24A/0451/WEB

We, Viscount Securities Unlimited, intend to apply for planning permission for a Large-scale Residential Development on a site at Clay Farm House (a protected structure), Kilgobbin Road, Dublin 18, and at Clay Farm (Phase 2), Ballyogan Road, Dublin 18. The application site is located to the east of Clay Farm House, a protected structure under RPS Ref.: 2119, and to the west of the Clay Farm Phase 2 residential development (currently under construction). The proposed development consists of the following: • Construction of a two storey apartment building, over a lower ground level, comprising 10 no. 2 bedroom apartments. Balconies are provided for all apartments on the north-west and south-west elevations; • Associated alterations to the Strategic Housing Development permitted under ABP Ref.: 301522-18, as amended under ABP Refs.: 304212-19, 305172-19, 308563-20, 310422-21 and Reg. Ref.: LRD23A/0126, replacing a permitted swale and grassed verge with 10 no. car parking spaces, bin, cycle and external stores, and associated landscaping changes; • The proposed development includes foul and surface water drainage, communal open space, landscaping, boundary treatment, lighting and all associated site works. The permitted SHD development (under ABP Ref.: 301522-18, as amended under ABP Refs.: 304212-19, 305172-19, 308563-20, 310422-21 and Reg. Ref.: LRD23A/0126), which is under construction, is for a total of 935 no. residential units (351 no. houses and 584 no. apartments) and the proposed alterations to the SHD permission relate to a permitted swale and grassed verge only.

Site at Clay Farm House (a protected structure), Killgobbin Road, Dublin 18, and at Clay Farm (Phase 2), Ballyogan Road, Dublin 18Dun Laoghaire Rathdown County CouncilPermission (LRD)0 reasons0 conditions
Refused20 August 2024
ABP31413122

Permission for a Strategic Housing Development consisting of: the construction of 1 no. apartment block ranging from 3 to 6-storeys in height (9,193 sq.m GFA), comprising a total of 97 no. units including 28 no. 1-bedroom and 69 no. 2-bedroom apartments, all with private amenity space; construction of 21 no. 2-storey houses in semi-detached and terraced form (combined GFA of 2,624 sq.m), including 10 no. 3-bedroom dwellings and 11 no. 4-bedroom dwellings, all with private amenity space; construction of a 2-storey childcare facility (156 sq.m GFA), with associated outdoor play area, 2 no. set-down car-parking spaces and 2 no. designated staff car-parking spaces; construction of a section of the Clay Farm Loop Road 137m in length (all on lands within the ownership of the applicant) and incorporating a 6m wide carriageway with 2m wide footpaths and 2m wide cycle tracks on each side, connecting with the existing section of the loop road constructed on lands to the south-east as part of the Clay Farm development; construction of local access roads to serve the development which will connect with the new section of the Clay Farm Loop Road; provision of 4,002 sq.m of public open space; provision of 1,454 sq.m of communal open space at podium level to serve residents of the apartment block; provision of 153 no. on-site car parking spaces incorporating 97 no. under podium spaces for residents of the apartment building, 10 no. visitor car-parking spaces, 42 no. in-curtilage car parking spaces for the housing units and 4 no. car-parking spaces designated for the childcare facility; provision of 248 no. bicycle parking spaces including 170 no. long-stay spaces, 56 no. short-stay spaces and 22 no. for use by the childcare facility; 4 no. motor-cycle parking spaces under podium level; provision of 4 no. new pedestrian and cyclist links to adjoining residential development in Stepaside Park, one of which will also facilitate emergency vehicle access to Stepaside Park and access to re-configured bin-store for existing residents of The Courtyard; all ancillary site development works including plant, waste storage areas, landscaping, green roofs, boundary treatments, SuDS measures, ESB substation, public lighting and solar PV panels. The application contains a statement setting out how the proposal is consistent with the objectives of the Dún Laoghaire-Rathdown County Development Plan 2022-2028 and Ballyogan and Environs Local Area Plan 2019-2025. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes the relevant development plan or local area plan other than in relation to the zoning of the land. The application together may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.stepasideshd.ie

Site of c. 1.97 ha of the Clay Farm Loop Road linking with Clay Farm Phase 2 development, situated to the north-east of the existing Stepaside Park housing development, located in townland of Kilgobbin, Stepaside, Dublin 18Dun Laoghaire Rathdown County CouncilPermission (SHD)0 reasons0 conditions
Refused12 October 2023
LRD23A/0126

Viscount Securities intend to apply for planning permission for a Large-scale Residential Development consisting of alterations to the Strategic Housing Development permitted under ABP Ref.: 301522-18, as amended under ABP Refs.: 304212-19, 305172-19, 308563-20 and 310422-21, which is currently under construction, on a site at Clay Farm, Ballyogan Road, Dublin 18. The application site is located to the south of Clay Farm Phase 1, to the north-west of Stepaside Golf Course, to the north and north-east of Cruagh Wood and Stepaside Park and to the east of two dwellings, including Clay Farm house. The proposed alterations, which relate to the West Village area of the permitted development, consist of the following: Provision of an additional substation and switchroom, with a gross floor area of c. 38 sq.m, associated maintenance access road and set down area; Replacement of 8 no. 3-bed two storey terraced houses, with 7 no. 3-bed two storey semi-detached houses and 1-no. 3 bed two storey detached house; and All associated car parking changes, landscaping and site development works. The permitted SHD development (under ABP Ref.: 301522-18, as amended under ABP Refs.: 304212-19, 305172-19, 308563-20 and 310422-21) provides 935 no. residential units (351 no. houses and 584 no. apartments) and the proposed alterations comprise revisions to 8 no. of the permitted houses. There is no proposed change to the total number of units permitted. Details available at https://cfphase2shdamdts.ie/

Clay Farm, Phase 2, Ballyogan Road, Dublin 18Dun Laoghaire Rathdown County CouncilPermission (LRD)0 reasons0 conditions
Granted19 April 2023
Showing 1-3 of 3
PreviousPage 1 of 1Next