Planning records
Showing 1-50 of 1,733 public recordsDevelopment consisting of the construction of dwelling house, install effluent treatment system with percolation area and to carry out all associated ancillary site works
A. renovation and extension of the existing dwelling, b. installation of new wastewater treatment system & percolation area, c. installation of a new, replacement well for domestic use, d. installation of a new garage/workshop for domestic use, e. retention of the existing vehicular access, modification of the existing lane way within the site boundaries and associated landscaping works, f. all associated site works
(1) Demolish existing gable end flat roof annex; (2) construct new extension to gable end of existing dwelling house; (3) carry out all necessary alterations and refurbishment works to existing dwelling house; (4) construct new domestic garage; (5) relocate existing vehicular entrance; (6) upgrade existing septic tank with the installation of new effluent treatment system and percolation area together with the carrying out of all associated ancillary site works
Development consisting of (1) construction of new milking parlour and dairy unit, (2) construction of new slatted shed with cubicles (3) construction of new calf housing (4) formation of new site entrance and all associated site works
Development consisting of retention and completion of the following: 1) Conversion of the derelict coach house to habitable accommodation on the ground and first floor. 2) First floor balcony to the south elevation. 3) Replacement/refurbishment of existing external windows and doors. 4) New front porch. 5) Changes to the fenestration on the south and west elevations. 6) All associates site works. The building is within the curtilage of protected structures 289 and 290 as registered on the Co Co list of protected structures
To retain and complete the following: 1) Retain the raised roof and first floor, 2) Retain the new front extension and additional windows to the south gable, 3) Proposed internal layout changes on the ground floor, 4) Remove the first floor balcony on the south elevation, 5) Remove the corbel details on the front elevation, 6) Replacement of windows and door on the front extension, 7) Replace window installed on the south gable, 8) Lime render the unfinished walls externally, 9) Proposed wastewater treatment system and, 10) All ancillary site works. The building is within the curtilage of Protected Structures 289 and 290 as registered on the Sligo County Council list of protected structures
Development consisting of the following(1) demolition of existing flat roof extension to the rear of existing dwelling house (2) construction of a new front porch and new extensions to both gables ends and the rear of existing dwelling house, (3) carry out all necessary alterations and refurbishment works to existing dwelling house - including the raising of existing eaves and ridge level (4) to install new effluent treatment system and percolation area together with the carrying out of all associated ancillary site works
Development consisting of (1) change of house type from that as previously granted under pl ref. 11/192, (2) changes to effluent treatment system and percolation area together with all associated site works
Development consisting of the demolition of flat roof extensions to the front and rear of existing cottage. Construction of new front porch and extension to the back of the existing cottage together with all ancillary site works and services.
1. Construction of a new bungalow type dwelling 2. Construction of a new wastewater treatment plant and percolation area in accordance with EPA Code of Practice 3. All associated site development works
Demolition of the existing single-storey rear extension and partial demolition of the existing side (NW) lean-to extension, the raising of the ground floor window lintels by 370mm and the raising of the porch roof by 465mm
Upgrade the existing domestic proprietary effluent treatment system
Development consisting of the construction of dwelling house, install effluent treatment system with percolation area and to carry out all associated ancillary site works
To retain side extension to existing dwelling house, together with all ancillary site works and services on site
Development consisting of installation of effluent treatment system with percolation area and to carry out all associated ancillary site works at existing dwelling house subject to renovations
Retention for the existing 19.6m2 lean-to shed
To construct a new agricultural access to lands, together with all ancillary site works and services on site
To construct revised extensions and alterations to existing dwelling house, revise the design and location of proposed domestic garage, revise site layout plan with amended site boundaries and carry out all associated ancillary site works including the installation of new on-site wastewater treatment system - development previously granted planning permission under PL2260002
Amendments to the (North) front elevation and (East) side elevation of planning permission (revised extensions and alterations to existing dwelling house) previously granted permission under PL2560072, The amendments consist of alterations to the window fenestration on both these elevations.The development was originally granted planning permission under PL2260002
The development will consist of the removal and replacement of the existing roof structure to create a first-floor level, extension to rear, alterations to front and side elevations, construction of new domestic garage, new on-site wastewater treatment system together with ancillary site development works.
Development consisting of construction of revised dwelling house to that previously granted planning permission under PL 17/402 - including associated revisions to site layout plan and the carrying out of all ancillary site works
Development consisting of construction of a dwelling house, domestic garage, entrance by boundary wall and installation of a septic tank and percolation area
To: (1) Demolish existing conservatory / sunroom to front elevation of existing dwelling house; (2) construct new extensions to gable end and rear of existing dwelling house (3) carry out all necessary alterations and refurbishment works to existing dwelling house; (4) demolish existing storage shed; (5) relocate existing vehicular entrance; (6) upgrade existing septic tank with the installation of new effluent treatment system and percolation area together with the carrying out of all associated ancillary site works
Development consisting of an existing detached storage shed
The construction of an extension and alterations to existing dwelling house, domestic garage, on-site wastewater treatment system and ancillary site development works
For development consisting of construction of a duo pitched slate roof structure on an existing flat roof store room at the side of dwelling house
PP - development comprising of the following: a) The conversion of existing garage to domestic accommodation, And all associated site works and service connections.
To construct dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works
Development consisting of (1) demolition of existing single-storey extension to rear of existing dwelling house; (2) construction of new two-storey extension to rear of existing dwelling house; (3) carry out alterations and refurbishments to existing dwelling house associated with proposed works; (4) replace existing septic tank with a new effluent treatment system and percolation area together with all ancillary site works
To construct dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works
A) the construction of an agricultural building (total floor area 1402 sq.m ) incorporating indoor horse lunging area, stables, tack room & storage areas with roof mounted photovoltaic panels, b) Roofed horse walker, c) Roofed manure pit and carry out ancillary site development works
The construction of a new single storey National Mountain Bike Trail Head Building consisting of a café, bike hire facility, toilets, ancillary spaces and all associated site works, the construction of a new wastewater treatment system and bike wash area. These proposed works if so granted planning permission will replace the previously granted proposed building development (planning reference nr: 17294). A Natura Impact Statement will be submitted to the planning authority with the application.
We, Joe Grogan and Aisling Keenan, intend to apply to Sligo County Council for Planning Permission for the following works at Carha Td, Coolaney, Co Sligo 1. Renovation of existing derelict cottage. 2. Construction of a new extension to the west side and north side of the existing cottage. 3. Construction of a new home office/studio to replace the existing derelict outbuilding. 4. Construction of a domestic garage to north-east of the house. 5. Upgrade of existing access road to serve proposed development. 6. Provision of a new effluent treatment system with percolation area and all associated site works.
Development consisting of the construction of a dwelling house, install effluent treatment system with percolation area and to carry out all associated ancillary site works
(1) a new single-story extension to the front and side and rear of our existing dwelling house (2) modifications to the existing elevations to include alterations to the existing windows, infill of the existing covered porch to create a new entrance, new Velux roof lights and alterations to the existing garage door to create a new window opening, (3) and all associated site works
The development will consist of the renovation of existing dwelling, construction of new extension to rear of dwelling, new on-site wastewater treatment system together with ancillary site development works
Development consisting of the refurbishment and construction of an extension to existing dwelling, new on-site wastewater treatment system together with ancillary site development works.
The development will consist of the demolition of existing dwelling and the construction of new dwelling house, new on-site wastewater treatment system together with ancillary site development works
Development consisting of an extension to existing house with new rooflights to existing roof
(a) build a single storey independent living unit to the east side of existing dwelling house (b) upgrade the existing wastewater treatment system with a new proprietary effluent treatment unit and soil polishing filter, together with all ancillary site works and services
Development consisting of first floor accommodation to existing dwelling house on site together with all ancillary site works and services (Previous Planning reference 06/487, 13/20 and 17/97)
Development consisting of the retention of the following; (1) the removal of the trees, hedgerow, mesh fencing, landscaping including kerbing to the west side of the school; (2) provision of a new one way system/drop-off area with access from and egress onto the L68043, provision of carparking along the L68043; (3) connections to existing surface water drainage and all associated site works
Development consisting of the following: (1) Retention permission for conversion of two number farm out buildings to temporary living accommodation. (2) Connection of temporary living accommodation to existing septic tank treatment system. (3) All associated site works and landscaping
Development consisting of the construction of a new car park and set down area, front boundary wall, formation of a new site entrance and exit with associated barriers, site boundary walling and fencing, car park lighting and all associated site works
Development consisting of construction of rear extension to existing spectator stand(70sq.m.) - at the northern end of existing football pitch. Proposed works will include connections to existing site services and the carrying out of all associated ancillary site works
(1) retain extension to the front and side of existing dwelling house (2) retain extension to the rear of the existing outbuilding (3) and all associated site works
Development consisting of the construction of a new dwelling house, new garage, effluent treatment system, percolation area, formation of a new site entrance and all associated site works
To retain variances to elevations of existing dwelling house, Previous planning ref. PL09/143, together with all ancillary site works and services
Development consisting of (1) construct a storey and a half dwellinghouse and a domestic garage (2) install a septic tank and percolation area and (3) carry out all ancillary site works
Development consisting of the following: (1) construction of a 634sq.m ventilated agricultural shed for the housing of sheep, (2) construction of a 376sq.m agricultural machinery and hay storage shed, (3) proposed 188 sq.m dungstead complete with a pre-cast concrete effluent tank (4) proposed new access road and entrance and to carry out all ancillary site works