Planning records
Showing 1-5 of 5 public recordsFor the development consisting of refurbishment and upgrading works [including (where necessary) replacement of existing poles along the existing overhead electricity line, minor ground works e.g. replacement or installation of stays, and maintenance or improvement works]; and all associated ancillary works including the provision of temporary accessways. Replacement poles will be constructed at, or immediately adjacent to, the existing structures that they will replace. Replacement poles will have a maximum height of 12m above ground; and be similar in appearance to existing poles. Planning permission is sought for a 10 year period. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
To upgrade existing effluent treatment system to EPA standards
For the extension to an existing cemetery, associated car parking, along with all associated site works. (previous planning ref no. 16/1198).
Chun teach cónaithe, garáiste agus córas séarachais. Spas urláir comhlán na n-oibreacha beartaithe: 210 sqm
Á lorg don scartáil d'ait cónaithe ar fhochaighdeán atá ann cheana féin, an tógáil do theach dormánta le cheithre sheomra ina áit, agus an obair suímhe ceangailte leis chomh maith le iontráil suímhe athbreithnithe agus athlonnú don chóireáil fuíollcheannauisce a bhí ceadaithe cheana féin (Pl. Ref. 19/1313). Spás urláir comhlán na n-oibreacha beartaithe: 242.5 sqm