FW23A/0234

The development will consist of the construction of a

Coldwinters, North Road, North of Finglas, Co. DublinFingal County CouncilPermission0 reasons0 conditions
Granted22 January 2024
FW22A/0213

The development is within a total site area of up to c. 1 ha. to include 1 no. DSO (Distribution System Operator) electrical substation building. 1 no. customer switchgear, electrical inverter / transformer station modules. 40 no. containerised battery storage units on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, underground cabling route c. 1.45 km to existing ESB 220kV Finglas Electricity Substation, associated electrical cabling and ducting, security gates, palisade perimeter security fencing, CCTV security monitoring system and landscaping works and all associated ancillary site infrastructure. AI received 21/12/22

Newtown & Coldwinters, North Road, Fingal, Co. DublinFingal County CouncilPermission0 reasons0 conditions
Granted19 January 2023
FW22A/0132

The construction of a single storey extension to the rear and side of an existing light industrial/warehouse unit. The development will include ancillary offices, staff toilets, trade counter/display area, carparking, elevation signage on the front elevation and all necessary site works. Demolition of a double single storey flat roofed domestic garage building is also included.

Coldwinters, North Road, Finglas, Dublin 11.Fingal County CouncilPermission0 reasons0 conditions
Refused16 August 2022
FW21A/0219

Planning permission for the construction of as 24-hour fuel card refuelling depot including; # Hard surfaced forecourt accommodating 4no. HCV and 2no. LCV fuel dispensers; Cover canopy; Underground tank farm and associated infrastructure (e.g. vent stack and fill points); # New vehicular entrance and exit points off R135; # Detached plant room; # 2.4m high palisade security fencing and new eastern (roadside) boundary wall; # Internal landscaping; # Erection of 19no. single head free standing lighting columns; # Erection of 7m high free-standing double-sided identifier totem sign with illuminated lettering; # Surface water attenuation and drainage system; # Widening of existing footpath to 2m and construction of continuing 2m wide footpath along eastern boundary with R135; # Creation of a right turning lane on R135; # Relocation of existing bus stop and speed limit poles and signs to back of altered existing footpath and all associated site and development works. # A Stage 2 Appropriate Assessment (Natura Impact Statement) has been prepared in respect of the proposed development.

Coldwinters, North of Finglas, DublinFingal County CouncilPermission0 reasons0 conditions
Refused19 January 2022