CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH ASSOCIATED SITE SERVICES.Decision record indexed
CONSTRUCT DWELLING HOUSE AND DOMESTIC GARAGE WITH CONNECTION TO EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA TOGETHER WITH ASSOCIATED SITE SERVICESDecision record indexed
Construct a detached dwellinghouse, including a tertiary treatment system and Infiltration /treatment area, together with all associated site works and services.Grounds not yet categorised
FILLING OF LANDS WITH INERT WASTE CONSISTING OF SOIL AND STONE MATERIAL TO IMPROVE LAND FOR AGRICULTURAL USE (APPLICATION AREA = 2.0 Ha, VOLUME 25,000 TONNES OVER 10 YEARS) AND ALL ASSOCIATED ANCILLARY WORKSDecision record indexed
Construction of a 4 bay cattle slatted shed with underground slurry storage tank together with cattle crush, dry storage area and all associated site worksDecision record indexed
Construction of a cattle slatted shed with underground slurry storage tank together with cattle crush, dry storage area and all associated site worksDecision record indexed
Home work studio comprising a home work office, physio consulting room, a rehab space and a storage space for rehab equipment and domestic storage, together with all ancillary siteworks and servicesGrounds not yet categorised
Physiotherapy and rehab studio and ancillary accommodation with attached domestic garage together with all ancillary siteworks and services.Grounds not yet categorised
Construct dwelling house and domestic garage with connection to effluent treatment system together with associated site servicesDecision record indexed
Retention of staff accommodation & amenity rooms adjacent to existing sheds, (2) retention of rear elevation alterations where proposed dining room granted under P90/1135 was omitted in lieu of 2 no. access patio doors, (3) renovate and extend existing gate lodge, (4) install 6 no. of glamping pods to be used in conjunction with existing guest house/ enterprise, (5) upgrade existing septic tank & percolation area for existing guest house, (6) and to install new septic tank and percolation area for the gate lodge together with all ancillary site works.Decision record indexed
Reinstatement of ground works for proposed agricultural access, provide access via existing private access road, permission to construct a private dwelling house with an effluent treatment system including all ancillary site works.Decision record indexed
Refurbishment of an existing dwelling house and the construction of new extension, and all associated site works and landscapingDecision record indexed
RETAIN THE EXISTING 15M HIGH MONOPOLE TELECOMMUNICATIONS SUPPORT STRUCTURE WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT AND SECURITY FENCINGDecision record indexed
ERECT A 30M MONOPOLE TELECOMMUNICATIONS SUPPORT STRUCTURE TOGETHER WITH ANTENNAE, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT ALL ENCLOSED IN SECURITY FENCINGDecision record indexed
SPORTS FACILITY COMPRISING FULL SIZE GRASS GAA PLAYING PITCH, ASSOCIATED PITCH FENCING, BALL FENCES AND SITE FENCING, PITCH FLOODLIGHTING AND SITE LIGHTING, SPECTATOR STAND, SPORTS BUILDING COMPRISING CHANGING ROOMS, TOILETS, GYM,MEETING ROOM, MULTI-PURPOSE ROOM AND ANCILLARY ACCOMMODATION, ACCESS FROM GOLF COURSE ROAD, CAR PARKING, BUS PARKING, SET DOWN AND WALKWAY/TRAIL AROUND THE SITE, ALL ANCILLARY SITEWORKS, RETAINING STRUCTURES, SERVICES AND LANDSCAPING. DEVELOPMENT IS PARTLY LOCATED WITHIN THE CURTILAGE OF PROTECTED STRUCTURES RPS NO. 077 WESTPORT HOUSE AND RPS NO. 080 COURTYARD BUILDINGSDecision record indexed
Construct dwelling house and domestic garage with connection to effluent treatment system and percolation area together with associated site servicesDecision record indexed
Permission to construct a private dwelling house, domestic garage & effluent treatment system together with all ancillary site worksGrounds not yet categorised
NO. 21 WESTPORT INDUSTRIAL PARK, WESTPORT DEMESNE, WESTPORT
CONSTRUCTION OF AN EXTENSION TO EXISTING WAREHOUSE FACILITIES TOGETHER WITH ASSOCIATED SITE WORKS AT UNIT NO. 21 P07/1376 REFERS.Decision record indexed
Construct an Industrial / warehouse building, connect to public services and all ancillary siteworks and associated landscaping at Westport Industrial Estate, Newport Road, Westport, Co MayoDecision record indexed
WESTPORT WASTE WATER, TREATMENT PLANT, THE DEMESNE
GROUND-MOUNTED PHOTOVOLTAIC SOLAR PANELS WITH A MAXIMUM SQUARE METERAGE OF 750 M2 DISTRIBUTED OVER A GRASS AREA ON-SITE WITH ASSOCIATED ANCILLARY WORKS. A NATURA IMPACT STATEMENT WILL BE SUBMITTEDDecision record indexed
OCCUPIER SIGNAGE ON THE SOUTHERN (FRONT) FACADE OF THE BUILDING. THE SIGNAGE IN THIS APPLICATION INCLUDES 1 MAIN OPERATOR SIGN, ONE "ENTRANCE" SIGN AND FOUR "CLIPPER BOARD" SIGNS, INCLUDES ALL ANCILLARY WORKSDecision record indexed
Westport Industrial Park, Westport Demesne, Newport Rd
To demolish/remove existing temporary warehouse/store and construct a permanent warehouse/store facility, together with all ancillary site works.Decision record indexed
Westport Estate Westport Demesne, Westport, Co. Mayo
Permission for development at Westport Estate (which contains a number of Protected Structures), Westport Demesne, Westport, Co. Mayo, to facilitate the provision of an Estate Maintenance Depot (West of existing Campsite area). The proposed development comprises: 1) The construction of a single storey building measuring c. 356 sqm for vehicle storage and maintenance, workshop area, goods storage, staff facilities and Estate related management activities; 2) The provision of an associated hardstanding yard / compound area, with boundary treatment / enclosure and gate access to existing internal Estate road network; 3) The provision of associated waste, fuel and Estate related storage, along with Estate vehicle and visitor parking; and, 4) Water supply, foul drainage and electrical / utilities connections to existing networks within the Estate, surface water management including soakpits, and all associated and ancillary works.Decision record indexed
(a) RETAIN AN EXTENSION TO THE EXISTING HOUSE GRANTED UNDER PLANNING REFERENCE 99/493 (B) RETAIN A STAND ALONE UTILITY ROOM INCLUDING ALL OTHER ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCTION OF A SINGLE STOREY DETACHED DWELLING HOUSE, SINGLE STOREY DETACHED GARAGE, PROPRIETARY EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED WORKS TO FACILITATE THE DEVELOPMENTDecision record indexed
Construction of an extension together with minor alterations to existing dwelling house together with all ancillary site servicesDecision record indexed
Adjacent to The Farmyard (a Protected Structure) and Camping and Caravan area at Westport Estate, Westport, Co. Mayo
Permission for retention of development adjacent to The Farmyard (a Protected Structure) and Camping and Caravan area at Westport Estate, Westport, Co. Mayo, comprising the construction of an Electricity Substation (with switch room) building, primarily subterranean with a natural stone finish to visible façade, and all associated and ancillary works including access / set down area, timber fencing, landscaping and screening.Decision record indexed
Gracy’s Restaurant The Farmyard Westport Estate, Westport, Co. Mayo
Permission for development at Gracy’s Restaurant, The Farmyard (a Protected Structure), Westport Estate, Westport, Co. Mayo, for the continued use (for up to 5 additional years) of the extension to the existing restaurant kitchen (within the Farmyard Courtyard) permitted under Reg. Ref: P22/60001, including the continuance of use of structures / works, service area / bin store, and all associated and ancillary elements, and for the subsequent removal of structures / features on expiry of permission and reinstatement of area to pre-existing condition.Decision record indexed
Gracy’s Restaurant The Farmyard Westport Estate, Westport, Co. Mayo
Permission for development (for a temporary period of up to 5 years) at Gracy’s Restaurant, The Farmyard (a Protected Structure), Westport Estate, Westport, Co. Mayo, consisting of an extension to the existing restaurant kitchen (within the Farmyard Courtyard). The proposed development comprises: 1) The installation / provision of single storey kitchen extension prefabricated structure measuring c. 42 sqm; 2) The provision of a corridor link / connection to existing Gracy’s kitchen / ancillary area measuring c. 8 sqm; 3) The provision of associated service area / bin store with screen enclosure to footprint within Farmyard Courtyard; 4) Water supply, drainage and electrical / utilities connections to existing networks, and all associated and ancillary works; and, 5) Removal of structure on expiry of permission and reinstatement of area to pre-existing condition.Decision record indexed
‘The Farmyard’ (a Protected Structure) Westport Estate, Westport, Co. Mayo
Permission for development at ‘The Farmyard’ (a Protected Structure), Westport Estate, Westport, Co. Mayo (to south of Farmyard complex and within existing forecourt / recreation area): comprising new hard and soft landscaping forecourt area, 2 no. canopy structures (up to c. 4.5m in height), (moveable) food and beverage facilities, and all associated and ancillary works and development above and below ground including removal of existing (modern) features (in part overlapping / amending Planning Permission References P20/295 & P23/60189).Decision record indexed
PROVISION OF AN ADVENTURE PARK WITHIN THE WESTPORT DEMESNE, LOCATED AT THE DISUSED QUARRY WITHIN PART OF THE ADJOINING WOODLANDS. THE PROPOSED ADVENTURE PARK (OVERALL PLAN AREA OF 1.7 HECTARES) WILL CONSIST OF A VISITORS ENTRANCE BUILDING, (158SQM)- PROVIDING ENTRANCE TURNSTILES, PUBLIC TOILETS, ANCILLARY RETAIL, STAFF FACILITIES, STORES AND ANCILLARY SERVICES AND PARK ATTRACTIONS TO INCLUDE A NET PARK, LARGE SWING, JUNIOR SWING, ZIP LINE, CLIMBING ROPES, SLIDE, CLIMBING/ABSEILING TOWER AND ACTIVITY GARDEN ALL WITH ASSOCIATED LANDSCAPING, SEATING AREA, SITE SERVICES, LIGHTING, WALKWAYS, BOUNDARY TREATMENT AND ALL ASSOCIATED SITE WORKSDecision record indexed
Permission for development at and adjoining ‘The Quarry’, Westport Estate, Westport, Co. Mayo (and adjacent ‘The Farmyard’, a Protected Structure) amending Planning Permission Reference P20/295 (which permitted an Adventure Park), comprising alteration, omission and addition to the form and position of permitted ‘Park Attractions’ and all associated and ancillary development and works above and below ground level.Decision record indexed
Development consisting of construction of a new slatted shed and underground slurry storage tank along with all associated site works. There will be one building and all effluent will be collected and stored in the proposed slatted tank. The slatted shed will be 7.670m in height and is to be constructed on farmland our clients family have been farming for years.Decision record indexed
(new) Adventure Park at the Quarry Westport Estate and adjoining ‘The Farmyard’ (a Protected Structure), Westport, Co. Mayo
Permission for development at the (new) Adventure Park at the Quarry, Westport Estate, Westport, Co. Mayo, and adjoining ‘The Farmyard’ (a Protected Structure) area, comprising additional and revised hard and soft landscaping, adventure and play features (including Slide Cover Structure (at bottom landing) c. 4.6m high, Climbing Tower c. 9.9m high, Totem Pole c. 4.5m high, and Assorted small scale (<3m high) play and sensory features) within the (currently under construction) Adventure Park, and all associated and ancillary works and development above and below ground (in part overlapping / amending existing Planning Permission References: P20/295 & P23/60189).Decision record indexed
Planning Permission to construct a private dwelling house, domestic garage and connection to Public Services together with all ancillary site works.Grounds not yet categorised
RENOVATE AND EXTEND EXISTING DWELLING HOUSE WHICH INCLUDES THE REFURBISHMENT OF EXISTING OUTBUILDINGS TOGETHER WITH ALL ANCILLARY SITE WORKSDecision record indexed
DEMOLISH EXISTING SHEDS, CONSTRUCT A PRIVATE DWELLING HOUSE ON THE SHED FOOTPRINT WITH CONNECTION TO EXISTING PUBLIC SERVICES TOGETHER WITH ALL ANCILLARY SITE WORKSGrounds not yet categorised
Retain existing foundation and permission to construct a home office and gym on the existing foundation with connection to new effluent treatment system and percolation area together with associated site servicesDecision record indexed