The development seeking permission will consist of the construction of one dormer window in the main roof to the rear, one rooflight in the main roof to the front of the property and one window in the gable (south) elevation.Decision record indexed
Expansion of the floor plate of proposed creche/pre-school facility (area 370sq.m) to include adjoining storage space (32sq.m) with revised layout plan to that approved in ref. SHD3ABP-302398-18.Decision record indexed
Unit 2007 & 2008, Orchard Avenue, Citywest Business Campus, Dublin 24
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.Decision record indexed
Units 2007 and 2008, Orchard Avenue, Citywest Business Campus, Dublin 24
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.Decision record indexed
Unit 2007-2008, Orchard Avenue, Citywest Business Campus, Dublin 24, D24 RW52
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.Decision record indexed
Site at junction of Citywest Road and Garter Avenue, Citywest, Dublin 24
Residential development of 112 dwellings comprised of: 90 two storey houses consisting of 10 four bed detached houses, 2 three bed detached houses, 8 four bed semi-detached houses, 2 three bed detached houses, 8 four bed semi-detached houses, 42 three bed semi-detached houses and 28 three bed mid-terrace houses along with 22 one and two bed apartments in a four storey apartment building. The proposed development includes all associated site development and infrastructural works, car parking, bin storage, open spaces and landscaping. Access to the development will be via two vehicular entrances from Garter Avenue. All on a site of 3.74ha bounded to the east by the N82 Citywest Road, to the north-west by Garter Avenue and to the south by lands that will be developed as a Neighbourhood Park (permitted under Reg.Ref. SD15A/0127) in accordance with the Fortunestown Local Area Plan 2012.Decision record indexed
Circle K, City Avenue Service Station, Citywest Road, Citywest Business Campus, Dublin 24
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (off licence use) within the overall permitted retail unit, where the floor area for the off licence use is 15sq.m and is ancillary to the primary retail use.Grounds not yet categorised
The installation of telecommunications equipment including no. 3 ballast mounted shrouded antennas, no. 1 ballast mounted dish, remote radio units (RRU's), cable trays, GPS, cabinet and all other associated site development works on the building rooftop to provide for high-speed wireless data and broadband services.Decision record indexed
Circle K, City Avenue Service Station, Citywest Road, Citywest Business Campus, Dublin 24
Retention of modifications to the permitted ground floor layout to include a reduction in the area of the permitted hot food deli, the inclusion of a second deli/servery, both selling hot and cold food for consumption on and off the premises, and changes to the associated seating areas, all remaining subsidiary to the overall use of the premises as a service station.Decision record indexed
Circle K City Avenue Service Station, Citywest Road, Citywest Business Campus, Dublin 24
The development comprises of permission for new signage elements and site development works. As well as retention permission for various minor amendments to the development permitted under South Dublin County Council Planning Reference SD22A/0282. Specifically, 3no additional high power electric vehicle charging units, bollards, and 6no parking spaces, relocation of existing light column and previously approved substation, and all associated site development works.Decision record indexed
Cooldown Commons and Fortunestown, Citywest, Dublin 24
Amendment to Block D4 of the Strategic Housing Development permitted under ABP-310570-21. The proposed amendment to Block D4 is for a reduction in height to 9 storeys (from 13 storeys) and associated reduction in the number of units to 44 (from 60 units); Block D4 will have 4 one beds (no change), 34 two beds (down from 46) and 6 three beds (down from 10) all with associated private balconies/terraces to the north/south/east/west elevations; This will result in the reduction in the total number of residential units across the entire development site from 421 residential units to 405 residential units; Block D4 will also provide 564sq.m residential amenity space at ground floor level (an increase of 9sq.m); Minor amendments to the southern elevation are also proposed. The application includes for all site services required to facilitate the amendment to Block D4.Decision record indexed
Circle K, City Avenue Service Station, Citywest Road, Citywest Business Campus, Dublin 24
A high powered electric vehicle charging station consisting of the: (1) Installation of 2 No: Electric vehicle charging bays, and comprising a parking space and electric vehicle charging unit (2) Installation of a prefabricated ESB substation (3) Erection of associated signage (4) All associated lighting, infrastructure and site development worksDecision record indexed
Site at junction of Citywest Road and Garter Avenue, Citywest, Dublin 24
We Kingscroft Development Limited seek Planning Permission for modifications to the granted permission (planning reg ref SD16A/0210) at the site west of Citywest Road (N82) South of Garter Avenue/Citywest Avenue, Citywest Dublin 24., The development site is bounded to the east by the N82 Citywest Road, to the North East by Garter Avenue and to the south by lands. The modifications include the change of use of the granted community floor space on the ground Floor of the granted 4 Storey Apartment Building to 1no 2 bed apartment unit and 1no 1 bed apartment unit. All with associated siteworksDecision record indexed
Site West of Citywest Road (N82), South of Garter Avenue, Citywest Avenue, Citywest, Dublin 24
Modifications to the granted permission (planning reg. ref. SD16A/0210). The proposed Modifications will consist of the addition of 6 No. apartment units (1 No. 1-bed unit,5 no. 2-bed units) on the third floor and set back floor plan on the Fourth Floor, Increasing the overall Apartment Block from 4-storeys to 5-storeys, and from 20 No. apartment units to 26 No. apartment units (consisting of 4 no. 1-bed units, 22 no. 2-bed units ) and 1 community floor space of 160 sqm. No modifications to as-granted 90 no. houses, The overall total no. of units in this development is now increased to 116. All with associated site works, Bin and Bike storage, the site layout has been modified slightly to accommodate additional surface car parking and other ancillary works.Decision record indexed
Unit A Block 3 Tramway Lane, Citywest View, Dublin 24
Change of use of the ground floor permitted café/ retail unit to a veterinary practice. The proposed unit will include a reception area, 6 consultation rooms, and treatment area including theatre, x-ray room, laboratory, holding areas and all other ancillary rooms/ staff facilities. Signage is also proposed in the form of two projecting lightboxes and signage on the fascia board over the front door.Decision record indexed
Site at Cooldown Commons & Fortunestown, Citywest, Dublin 24
Construction of a residential scheme comprising 421 units, offices, retail units x3 and residential amenity areas x2, within 9 blocks ranging in height from 1-13 storeys. The proposal will include 289 car parking spaces along with 650 cycle parking spaces. The development will provide public and communal open spaces throughout including a public plaza adjoining Fortunestown Luas stop. Provision of vehicular, pedestrian, and cyclist accesses to the site, including pedestrian bridge to the public park (under construction) to the east. The application includes for all landscaping, ESB substations, plant areas, bin storage, surface water attenuation and all other site development works, and site services required to facilitate the proposed development. The proposed development seeks to amend SHD permission ABP-302398 -18 (under construction to the west), replacing 32 permitted duplex apartments along with associated amendments to internal roads and open spaces. The current proposal also replaces permission SD16A/0078 previously granted on this site.Decision record indexed
Unit B, Tramway Lane, Citywest View, Citywest, Dublin 24.
Amendments to Unit B of "Tramway Lane" (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21) and Large Scale Residential Development (SDCC Ref. LRD23A/0007) to include a single storey plant area to the rear, beside the permitted cycle stores. The proposed amendment includes all associated site services and development works required to facilitate the amendment to the "Tramway Lane" block.Decision record indexed
Unit A, Tramway Lane, Citywest View, Citywest, Dublin 24.
Amendment to Unit A of Tramway Lane (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21). Unit A has permission for commercial / retail use. The proposed amendment is for change of use to Dentist. The development will also include a single storey plant area located to the rear / north side of the premises. The proposed amendment includes all associated site services and development works required to facilitate the proposed change of use.Decision record indexed
Unit B, Tramway Lane, Citywest View, Citywest, Dublin 24.
The development will consist of amendment to Unit B of "Tramway Lane" (Block E1 of the permitted Strategic Housing Development (SHD) (Ref. ABP-310570-21). Unit B (c.257.2 sq.m) has permission for commercial/retail use. The proposed amendment to Unit B consists of the incorporation of an off-licence area within the permitted retail unit (c.13.3 sq.m). The proposed amendment includes all associated site services and development works required to facilitate the amendment to the "Tramway Lane" block (on lands located north of the Luas red line and Fortunestown Luas stop.Decision record indexed
On lands at Cuil Duin Avenue, Citywest, Co. Dublin
Construction of a three storey creche and community centre facility of 1,610sq.m gross floor area with associated external play area; car & cycle parking, hard and soft landscaping, bin storage, a revised layout to the northern edge of Cuil Duin Avenue to accommodate access to the proposed development including amendments to the existing footpath and cycle track and provision of set down car parking spaces and all associated site and development works.Decision record indexed
The proposed development will consist of modifications to the elevational design and floor plan layout of the previously permitted 3 storey creche/ community centre building (approved under Reg. Ref. SD22A/0398) resulting in a reduction in overall floorspace from 1610sqm to 1596.8sqm. Revisions are proposed to the approved site layout plan including: removal of the pedestrian bridge and relocation of the external play space area from the open space located to the west of the stream to an outdoor deck play space adjacent (west) of the main building and an enclosed play space at ground floor level on the southern elevation. Permission is also sought for modifications to adjoining cycle track and set down car parking spaces; revised hard and soft landscaping, bin storage and cycle parking and all associated site and development worksDecision record indexed
Change of use of 3,397sqm of the existing interlinked complex of buildings of 18,984sqm from a mix of ancillary warehouse, packaging, logistics and research and development uses within part of the ground floor of Block E (2,952sqm) and part of the ground floor of Block G (445sqm) to office based industry that incorporates research and development, ancillary office, gym and other facilities related to the operation of the overall development. The development will include internal works only to facilitate the change of use.Decision record indexed
Bianconi Avenue, Citywest Business Campus, Saggart, Co. Dublin
Retention of the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimeter of the site with Orchard Avenue; The development also consists of the retention of 3 signs (10.94sq.m) as follows: retention of 1 sign (0.57sq.m) on plinth at the corner of Bianconi Avenue and the N82/Citywest Road; retention of 1 sign (4.58sq.m) on the eastern elevation of Block D facing the N82/Citywest Road and retention of 1 sign (5.79sq.m) on the northern elevation of Block M facing Bianconi Avenue. The development will include retention of all revisions to the permitted landscaping and site development works required.Decision record indexed
Xilinx Ireland, Bianconi Avenue, City West Business Campus, Saggart, Co. Dublin
Change of use of 6,299sq.m of the existing interlinked complex of buildings of 18,984sq.m from a mix of ancillary warehouse, packaging, logistics and research and development uses within Blocks E, G and K to an independent office based industry use that would function independently to the remaining Xilinx facility and could be sub-let and subdivided. An area of existing office space of 1,591sq.m at the second floor within Block G will also be sub-let creating an overall independent office based industry use of 7,890sq.m. The development will include the removal of the mezzanine level above the ground floor of Block G (201sq.m) that will reduce total floor area of facility to 18,783sq.m. The development will also consist of the amendment of Condition no. 6 of S94A/0344 and S99A/0908 so that the new independent office based industry use of 7,890sq.m can be sub-let and subdivided and so that the existing office space (10,893sq.m) is not integral or ancillary to the non office uses that are subject of this change of use application. Minor elevation changed are also proposed, including a new entrance within the north elevation of Block E, and additional glazing to the north, west and south elevation of Block G. The remaining Xilinx facility (10,893sq.m) will continue as per its permitted uses. The new office based industry use will be served by the reconfigured 197 car parking spaces of the 568 permitted car parking spaces serving the site with vehicular access via the existing secondary entrance off Bianconi Avenue. 371 spaces will continue to serve the remaining Xilinx facility. Retention permission is also sought for the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimter of the site with Orchard Avenue. The development will include all ancillary landscaping and site development works.Grounds not yet categorised
3300, Lake Drive, Citywest Business Campus, Dublin 24, D24 TD21
The development will consist of: The change of use of the existing warehouse to a clean manufacturing area - light industrial. Alterations to the existing south elevation, including the installation of new signage displaying the company name and the removal of the existing balcony. The provision of new double access doors and a new external pathway to facilitate access to the building; including all associated site and ancillary works.Decision record indexed
The development will consist of retention of as built 2no. two bed, two storey duplex units with associated private and communal amenity spaces, bin and bike store and all associated amendments to hard and soft landscaping and car parking on the adjoining street at Parklands Parade all in lieu of previously permitted creche and community facility at this location.Grounds not yet categorised
Lands at 14, Riverwalk Block 2, Citywest Business Campus, Dublin 24
Permission is sought for development comprising a) the provision of a single storey canopy with metal fascia and column to the carpark elevation of Block 2 at the south office entrance; b) extension of existing paved area (57 sqm) at the south office entrance; c) the proposed canopy will accommodate an area of 2 sqm for signage to the front and side elevation of the canopy and; d) relocation of 3 no. car parking spacesDecision record indexed
Retention of 2no. two bed, two storey duplex units with associated private and communal amenity spaces, bin and bike store and all associated amendments to hard and soft landscaping and car parking on the adjoining street at Parklands Parade all in lieu of previously permitted creche and community facility at this location.Decision record indexed
DCU Tony Ryan Academy for Entrepreneurship, Lake Drive, CityWest Campus, Dublin 24, D24 DR02
Change of use from education to office use within the existing building. No increase in area, external alterations or extensions are proposed.Decision record indexed
Ground Floor of Block F (The Alder), Carrigmore Woods, Citywest Road, D24 T6HE
The development for which retention permission is sought consists of the reconfiguration and internal alteration of the permitted ground floor layout of Block F (including plant room layout) whereby the permitted Retail Unit (42 sq.m) and Café / Restaurant Unit (176.5 sq.m) (as permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref's SD22A/0299 and LRD24A/0009W) have been augmented into a single amalgamated unit of approximately 220 sq.m in floor area, together with external alterations to the northern and western elevations of Block F at ground floor level to include the omission of a plant room door from the northern elevation and provision of same to the western elevation together with a reduction in the glazed area to the western elevation. The proposed development for which permission is sought will consist of a proposed change of use of the retained amalgamated unit at ground floor level within Block F from its permitted Retail and Café / Restaurant uses (as permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref's SD22A/0299 and LRD24A/0009W) to a Medical Clinic / Group Practice (220 sq.m) use.Decision record indexed
Attic conversion with 2 roof lights to front and a dormer window to rear plus a single storey shed / garden room (circa 29sq.m) in rear garden with associated site works.Decision record indexed
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.Grounds not yet categorised
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.Decision record indexed
A residential/mixed use development on a site area of 12.45ha consisting of 400 dwellings comprised of 340 no. 2 storey detached, semi-detached and terraced houses, i.e. 3 no. 2 bed houses, 323 no. 3 bed houses & 14 no. 4 bed houses along with 60 no. 1 and 2 bed apartments in 4 no. 3 & 4/5 storey buildings. The development also provides for a creche (615sq.m), kiosk (56.6sq.m) and retail unit (237sq.m). The proposed development includes all associated site development and infrastructural works, car parking, open spaces and landscaping, ESB substation and 4 associated kiosks. Access to the development will by via two proposed new vehicular entrances from Citywest Avenue and Fortunestown Lane respectively and will also provide for two new vehicular crossing points over the Luas line. The development also includes for the demolition of an existing dwelling in the southwest corner of the site at the junction of Citywest Road and Fortunestown Lane. The site is bounded to the north by Citywest Avenue, to the west by the N82 Citywest Road, to the south by Fortunestown Lane, to the east by Ard Mor residential estate and is adjacent to the Luas Red Line.Decision record indexed
Site at Citywest, Dublin 24 bounded by Citywest Avenue to the North, N82 Citywest Rd to the West, Fortunestown Lane to the South, Ardmore Residential Est to the East
Revisions to permitted house types under Reg.Ref. SD15A/0127 and relates to three house types i.e. house types E1, E3 and E4. It is proposed to modify the ground floor extensions to the rear of 156 of the aforementioned house types.Decision record indexed
15, Citywest Village Avenue, Citywest Village, Dublin 24, D24C90H
The Construction of new dormer attic structure in mid terrace dwelling consisting of bedroom and ensuite and all associated site worksDecision record indexed
Unit 28, Citywest Shopping Centre, Citywest, Dublin 24
Change of use of the existing ground floor from café to restaurant, combining hot food takeaway, online home delivery and restaurant use.Decision record indexed
Part of the ground & first floor levels, (previously Unit No's 27M, 28M & 29M), City West Shopping Centre, Citywest, Dublin 24
The development will consist of a change of use of a Children's Play Facility (established under SDCC Ref. SD17A/0301) at part ground and part first floor level of the existing Citywest Shopping Centre building together with associated internal works of conversion and refurbishment and the erection of a new second floor extension with sedum roof on top to provide a public library that is arrange over three floors, as follows: (i) Ground Floor - Internal alteration and conversion of the existing ground floor lobby (approx 92 sq.m GIA). The existing light and stair access will provide access to the two upper floors that will contain the main floorspace associated with the library; (ii) First Floor - Internal alteration and conversion of existing floorspace (approximately 906 sq.m GIA) to provide public library space with ancillary staff and welfare facilities together with circulation areas. Provision is also made for additional / new external ancillary plant to the rear terrace (approximately 71 sq.m) and PV panels; and (iii) Second Floor - Construction of a new second floor extension to provide approx. 635 sq.m of public library floorspace (GIA) together with a west facing outdoor roof terrace (of approximately 117 sq.m). Associated external works include the provision of 16 no. short stay bicycle parking spaces (8 no. Sheffield stands) and 2 no. secure long stay bicycle spaces.Decision record indexed
Bianconi Avenue, Citywest Business Campus, Naas Road, Dublin 24
Construction of two 4 storey office buildings, with a total floor area of 13,250sq.m. The proposed development also provides for plant rooms at roof level (125sq.m each), all associated site development works, landscaping, basement and surface car parking, bike sheds, 2 service buildings (70sq.m each), and 2 new vehicular entrances off Bianconi Avenue, all on a site area of 2.2ha.Grounds not yet categorised
2.16 Ha Site at, Bianconi Avenue and Citywest Road, Citywest Business Campus, Dublin 24
Provision of a warehouse with ancillary office and staff facilities and associated development. The main structure will have a maximum height of approximately 19.1 metres with a gross floor area of 9,158 sq.m, including warehouse area (7,971 sq.m), ancillary office area (701 sq.m) and ancillary staff facilities (486 sq.m). The development will also include: 2 No. vehicular entrances to the site from Bianconi Avenue, including 1 No. for HGVs; a pedestrian entrance from the Citywest Road and Bianconi Avenue; HGV parking and yard; 45 No. car parking spaces, including 3 No. accessible parking spaces; cycle parking; level access goods doors; dock levellers; access gates; lighting; hard and soft landscaping; detention basin; boundary treatments; ESB substation, switch room and site lighting and security room; plant; and all associated site development works above and below ground.Decision record indexed
Side/rear two storey extension and rear single storey extension to dwelling; attic roof space conversion with roof dormer to rear part of roof with associated internal alterations; forming pedestrian access gateway to side boundary wall with associated boundary treatment alterations and all associated site development works.Decision record indexed
Side/rear two storey extension and rear single storey extension to dwelling house; attic roof space conversion with roof dormer to rear part of roof with associated internal alterations; forming vehicular access driveway off Carrigmore Meadows to side/rear garden with associated boundary treatment alterations site development works.Grounds not yet categorised
Double storey extension comprising a playroom, utility room and office room to the ground floor, extended bedroom, walk-in wardrobe and bathroom to the first floor to an existing detached house; alterations to the existing house front elevation including new window to the first floor bedroom; all to be constructed behind existing boundary walls.Decision record indexed
3000A, Lake Drive, Citywest Business Campus, Dublin 24
Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground.Decision record indexed
Unit 3007, Lake Drive, Citywest Business Campus, Naas Road, Dublin 24.
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.Decision record indexed